| 1 | Dismantlling and removing Cement Concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead. as per the direction of the engineer in charge. |
| 2 | Dismantling & memoving RCC columns beams slab, staircase landing, lintels including stacking the useful materials for re-use & removing the debries away from work site within 50 mtrs lead( data for 1cum) |
| 3 | Earth work in hard soil or gravelly soil within 50m initial lead & 1.5 initial lift including rough dressing & breaking clods to maximum 5cm to 7cm & laying in layers not exceeding 0.3m in depth & as per the direction of the EIC. A) Up to 1.5m depth |
| 4 | Earth work in hard soil or gravelly soil within 50m initial lead & 1.5 initial lift including rough dressing & breaking clods to maximum 5cm to 7cm & laying in layers not exceeding 0.3m in depth & as per the direction of the EIC. B) 1.5m to 3.0m depth |
| 5 | Earth work in hard soil or gravelly soil within 50m initial lead & 1.5 initial lift including rough dressing & breaking clods to maximum 5cm to 7cm & laying in layers not exceeding 0.3m in depth & as per the direction of the EIC. C) 3.0m to 4.5m |
| 6 | Conveyance of excavated materials such as rough stone, metal, khoa, chips, sand surki, quarry rubbish, moorum, laterite stone, washed gravel, flyash & earth away from the site by mechanical means including loading & unloading & depositing the same within 5km truck lead as per the dirction of the EIC. |
| 7 | Filling in foundation with sand well watered & rammed including cost, conveyance, royalty & taxes etc. complete of all materials to work site as the specification approved by the department and direction of Engineer in charge. |
| 8 | Cement Concrete (1:3;6) with 4cm size Hard Granite Hand Broken metal including all cost, conveyance, royalty & taxes etc.compete of all materials to work site as per specification approved by the department |
| 9 | Rigid smooth centering & shuttering including false work & removing the same after casting etc. complete. i) RCC foundation,plint Band,footing, bases of columns,mass concrete & precast slabs etc. in Ground floor. |
| 10 | Rigid smooth centering & shuttering including false work & removing the same after casting etc. complete. ii) RCC wall & fins including attached pillasters in Ground Floor. |
| 11 | Rigid smooth centering & shuttering including false work & removing the same after casting etc. complete. iii) RCC floor & roofslab,landings balconies,projecting sun shades & chajjas up to 4.30 mtr height (Data for 9.00 m2) |
| 12 | Shoring & shuttering the foundation trenches with close wooden planks including the cost of plank & sheet. |
| 13 | Supplying fitting & placing uncoated reinforcement including cutting, bendind, binding & placing the steel rods as per drawing & technical specification approved by the department with cost of binding wire 18 to 20 gauge. |
| 14 | R.C.C M-25 of 20mm size Crusher broken chips including all cost of concrete mixture, conveyance, royalty & taxes etc.compete of all materials to work site as per specification approved by the department & direction of Engineer in charge. |
| 15 | Providing weep holes in Brick Masonary/ Plain/Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towrds drawing foce. Complete as per drawing & technical. |
| 16 | Engaing of 5hp disel pump etc for dewatering storm water & accumulated storage water from side with all labour charges, cost of fuel etc completed. |
| 17 | Construction of coffer dam for diversion of water by collecting, supplying & stacking at work side with good quality of sand from approved query & filling the empty cement bag swing in strings & placing in proper positions at all heights with all labour t&P charges cost of strings & labour welfare, cess etc. complete as per the direction of EIC. |
| 18 | Cost of Display Board Please Enable Macros to View BoQ information |