| 1 | Supplying and stacking of stone dust |
| 2 | Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand. |
| 3 | Unloading sand/earth filled bags from boats 3.1)Placing in Dry |
| 4 | Placing in Wet. |
| 5 | Engagement/supply of labours. |
| 6 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 5.1)All kinds of soil |
| 7 | Ordinary Rock |
| 8 | Cutting saw cutter/machine(wood cutter) with operator and fuel charges |
| 9 | Hydraulic excavator (3D) with driver and fuel |
| 10 | Supply of Nallah stones (collection within nearby spots of nallah) |
| 11 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 12 | Supply of Galvanised iron wire mesh crates with wire thickness of 3.7 mm and tolerance limit of +/-0.2 mm(4\\"x4\\") including carriage |
| 13 | Providing and fixing of Flex banners with frames of sizes 3x5 feet/2x2 ft for awareness and IEC activities for demolition drives/ public outreach programmes etc |
| 14 | Providing and fixing of water proof Shamiyanas with all basic accessories of minimum floor space 20x35 feet including logistic supports for conducting of awareness activities, public outreach programmes, grievance camps, demolition drives and alike activities etc |
| 15 | Hire charges of diesel truck 9 tonne capacity incl. all POL/costs involved for carriage of men and machinery and materials upto road side/site of work. |
| 16 | Hire charges of tractor 3 tonne capacity incl. driver, all POL/costs involved for carriage of men and machinery and materials upto road side/site of work. |
| 17 | Dumping stones excluding cost of stones15.1) in horizontal on level. |
| 18 | on Slopes (Behind pitching) |
| 19 | Finishing walls with water proofing cement paint of required shade: Old work (one or more coats applied @ 2.20 kg/10sqm) over priming coat of primer applied @ 0.80 liters/10sqm complete including cost of priming coat |
| 20 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work (two or more coats) over and including priming coat with water thinnable cement primer |
| 21 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work |
| 22 | Providing and fixing concertina oil coil fencing with punched tape concertina coil 600 mm dia 10 meter openable length( total length 90 m), having 50 no's rounds per 6 meter length, upto 3 m height of the wall with existing angle iron \\"Y\\" shaped placed 2.4 m or 3.00 m apart and with 9 horozontal R.B.T reinforced barbed wire, stud tied with G.I clips to retain horizontal, including necessary bolts or G.I barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape (R.B.T)/spring core (2.5 mm) wire of high tensile strength of 165 kg/sq.mm with tape (0.52 mm thick) and weight 43.748gm/ meter (cost of M.S angle, C.C blocks shall be paid separately |
| 23 | Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete 20.1)300 mm dia. R.C.C. pipe |
| 24 | 450 mm dia. R.C.C. pipe |
| 25 | 600 mm dia. R.C.C. pipe |
| 26 | 900 mm dia. R.C.C. pipe |
| 27 | Carriage of RCC pipes by Mechanical Transport from source to road site of work incl. loading, unloading and stacking materials avg. lead 20 kms21.1)300 mm dia RCC pipes NP2 class. |
| 28 | 450 mm dia RCC pipes NP2 class. |
| 29 | 600 mm dia RCC pipes NP2 class. |
| 30 | 900 mm dia RCC pipes NP2 class. |
| 31 | Carriage of materials by Mechanical Transport from source to road site of work incl. loading, unloading and stacking materials. EC Bags22.1)Upto 05 km. |
| 32 | Beyond 5 to 10 km (per km) |
| 33 | Beyond 10 km to 20 km (per km). |
| 34 | Beyond 20 km per Additional km. |
| 35 | Carriage of materials by Mechanical Transport from source to road site of work incl. loading, unloading and stacking Sand /stone dust materials.23.1)Lead upto 01 km |
| 36 | Lead upto 02 km |
| 37 | Lead upto 03 km |
| 38 | Lead upto 04 km |
| 39 | lead upto 05 km. |
| 40 | Beyond 5 to 10 km (per km) |
| 41 | Beyond 10 km to 20 km (per km). |
| 42 | Beyond 20 km per Additional km. |
| 43 | Extra carriage of materials from road site to actual site of work by Manual labour E.C bags.24.1)Upto 50 m. |
| 44 | beyond 50 m upto 500m (per 50m) |
| 45 | Extra carriage of materials from road site to actual site of work by Manual labour a) sand/dust.25.1)Upto 50 m. |
| 46 | beyond every 50 m Please Enable Macros to View BoQ information |