| 1 | Hire charges for hydraulic Excavator (JCB) for emergent works during floods or heavy rains as and when needed including opertational charges and fuel for working hours involved as per LMR |
| 2 | Providing of Sumo/ Taverra for emergency works during floods or heavy rains, as and when required including cost of fuel and other allied charges etc. |
| 3 | Hiring of TRACTOR for emergency works during floods or heavy rains, as and when required incl. cost of fuel and other allied charges etc. |
| 4 | Supply and stacking of earth including loading, unloading and carriage upto site of work by all means commplete job. (5km) |
| 5 | Filling of EC bags with earth/ sand/ stone dust including stitching with thread but excluding the cost of sand/ stone/ dust/ sand. |
| 6 | Placing of earth/ sand/ stone dust filled bags in dry . |
| 7 | Placing of earth/ sand/ stone dust filled bags in wet/ water . |
| 8 | Carriage of EC bags from flood store kakapora to various sites including loading, unloading/ complete job . |
| 9 | Wages for unskilled labourers for working hours as and when needed as per SSR-2022 Goripopra to Seerbag LPB ) & RPB ( From Kadlabal Bridge Pampore to Sempora incl. Confluence points.) |
| 10 | Loading / unloading sand/ earth filled/ stone dust filled bags.including all carriages. |
| 11 | Taking of Photographs, editing & printing hard & soft copies (before, during & after) of the vulnerable spots were flood precautionary measures will be done, complete job. |
| 12 | Add. Cost of Ec. Bags as prevalent as per stock rate |
| 13 | Hire charges for pokelean for emergency works during floods or heavy rains as and when needed including opertational charges and fuel for working hours involved as per LMR |
| 14 | involvement of cutter including oil & m.oil etc.including cost of operator &other allied charges |
| 15 | Slip Clearances In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. |
| 16 | Supply of B.A wire Crates (4mm dia) of size 16' x 16' (mesh size 4\\" x 4\\") weight not less than 50kg including carriage and headload and provide manufacturer report as desired by Engineer incharge. |
| 17 | Supply of Nallah stones |
| 18 | Supply of Quarry Stones |
| 19 | Hand-packing stones in wire-crates; excluding cost of crates and stones. |
| 20 | Carriage of materials from Source to site of work/road site upto 8km avg..For actual carraige distance the j&k schedule rates shall be adjusted by contractor qouted rate. |
| 21 | Extra Carriage of materials from road side to site of work 50m .For actual headload distance the j&k schedule rates shall be adjusted by contractor qouted rate. Please Enable Macros to View BoQ information |