|
| 1 | Earth work in excavation by Manual/mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres2.9.1 All kinds of soil : |
| 2 | P/L of dry stone soling duly hand packed including all carriages loading unloading complete job before laying of mud mate in trenches incl. all carriages of material involved & head load. |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 4.4.5 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 6 | Centring and shuttering including strutting proping and removal of form work for foundations, footings, bases of columns slabs etc for mass concrete. |
| 7 | Centring and shuttering including strutting proping and removal of form work for foundations, footings, bases of columns slabs etc for mass concrete. |
| 8 | Reinforcement for RCC works including straightening cutting bending placing in position and binding all complete (Thermomechanically Treated Bars) Incl. carraige and head load |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : sand) 6.1.5 Cement mortar 1:6 ( 1 cement : 6 coarse sand)Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level |
| 10 | Structural steel work welded in built up sections and frame work including cutting, hoisting fixing in position all complete in angles / flats / tubes etc. including fixing of 2mm thick MS sheets in Door shutters including ms frame work.incl cost of steel primer and Paint complete |
| 11 | Providing and fixing Ist quality ceramic glazed wall,floor tiles conforming to IS : 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados over 12 mm thick bed of cement mortar 1:3 ( 1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. |
| 12 | 15mm Cement plaster on the rough side of single or half brick wall of 1 : 6 ( 1 cement : 6 fine sand) |
| 13 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank |
| 14 | Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes conforming to IS: 15801, UV stabilized and anti-microbial fusion welded, having thermal stability for hot and cold water supply including all PP-R plain and brass threaded Polypropylene random fittings. This includes testing of joints complete as per direction of Engineer-incharge.19.2.1 Internal work-exposed on wall with clamps at 1.00 meter spacing 19.2.1.3 PN-16 pipe , 25mm OD(SDR-7.4) to 2mm OD(SDR-7.4)c.jobincl all necessary PPR Fittings. |
| 15 | Providing and fixing water closet squatting pan (Indian type W.C. pan) with 100 mm sand cast Iron P or S trap, 10 liter low level white P.V.C. flushing cistern, including flush pipe (of approved make) with manually controlled device (handle lever) conforming to IS: 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required.18.1.2 White vitreous china Orissa pattern W.C. pan of size 580x440 mm |
| 16 | Providing and fixing testing and commisioning PVC SWR pipes jointed with approved solvent cement fixed to walls and ceilings including angle supports with clamps complete including cutting holes in rcc brick work and making good the floors beams, and walls cement mortar where required complete of outer diameter. Type-B incl all necessary fittings100mm P.V.C. pipe |
| 17 | 75 P.V.C. pipe |
| 18 | Providing and fixing 15 mm nominal bore C.P. brass bib cock of approved quality conforming to IS : 8931 |
| 19 | Providing and fixing 15 mm nominal bore C.P. brass angle valve for basin mixer and geyser points of approved make conforming to IS : 8931 |
| 20 | Providing and fixing of C.P connections of approved quality |
| 21 | Providing and fixing ball valve (brass) of approved quality, High or lowpressure, with plastic floats complete25 mm nominal bore |
| 22 | Providing and fixinggully ,floor nanahi trapeincl 100 mm sand cast iron grating for gully trap. |
| 23 | Providing and fixing of cement concrete rings incl cost of E/w incl cost of head load complete job |
| 24 | Providing and fixing of Gate value of approved quality |
| 25 | Finishing walls with 2mm thick wall putty including cost of cement primer coat two or more coats to give an even shade |
| 26 | Finishing walls with waterproof cement paint of approved brand and manufacture of required shade to give an even shade on new works all complete job. |
| 27 | Painting steel work with deluxe multi surface paint of required shade to give an even shade. Two or more coats applied @ 0.90litre/10sqm over an under coat of primer applied @ 0.80litre/10sqm of approved brand and manufacture |
| 28 | Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleats with CP brass screws with concealed fitting arrangement of approved quality and colour: 18.73.1 450 mm long towel rail with total length of 495 mm, 78 mm wide and effective height of 88 mm, weighing not less than 170 gms. |
| 29 | Providing and fixing PTMT liquid soap container 109 mm wide, 125 mm high and 112 mm distance from wall of standard shape with brackets of the same materials with snap fittings of approved quality and colour, weighing not less than 105 gms. |
| 30 | Carriage of material by MTSand -Avg 10km concrete |
| 31 | Aggregate -Avg 10km |
| 32 | Bricks -Avg 60km Please Enable Macros to View BoQ information |