| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : |
| 3 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil: |
| 4 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.4.1) Beyond 30 cm girth upto and including 60 cm girth. |
| 5 | Beyond 60 cm girth upto and including 120 cm girth. |
| 6 | Hydrualic excavator(3D) with driver and fuel |
| 7 | Engagement of Boatman |
| 8 | Engagement of Boat |
| 9 | Supplying and stacking of good earth. |
| 10 | Supplying and stacking of stone dust |
| 11 | Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand. |
| 12 | Unloading sand/earth filled bags from boats 11.1) Placing in Dry |
| 13 | Placing in Wet. |
| 14 | Loading/Unloading sand/ earth filled bags in lorries; lead upto 50m |
| 15 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m (respectively) 13.1) Dry |
| 16 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material All kinds of soil : |
| 17 | Supply of labours. |
| 18 | Dumping stone excluding cost of stones. in Horizontal on level |
| 19 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 20 | Supply of galvanised iron wire mesh crates with wire thickness of 3.7 mm in tolerance limit of +/-0.20 mm |
| 21 | Supply of stone boulders |
| 22 | Carriage of Crates from source to road/dumping site of work by Mechanical Transport including cost of loading, unloading and stacking.20.1)Lead upto 05 kms. |
| 23 | Beyond 05 km to 10km (per km). |
| 24 | Beyond 10 km to 20km (per km). |
| 25 | Beyond 20km (per additional km). |
| 26 | Carriage of stone from source to road/dumping site of work by Mechnical Transport including cost of loading, unloading and stacking21.1) Lead upto 05 kms. |
| 27 | Beyond 05 km to 10km (per km). |
| 28 | Beyond 10 km to 20km (per km). |
| 29 | Beyond 20km (per additional km). |
| 30 | Carriage/ disposal of materials from source to road/dumping site of work by Mechnical Transport including cost of loading, unloading and stacking.22.1) Earth/silt 01 kms. |
| 31 | Earth/silt 02 kms. |
| 32 | Earth/silt 03 kms. |
| 33 | Carriage of stone dust/sand from source to road/dumping site of work by Mechnical Transport including cost of loading, unloading and stacking.23.1) Lead upto 05 kms. |
| 34 | Beyond 05 km to 10km (per km). |
| 35 | Beyond 10 km to 20km (per km). |
| 36 | Beyond 20km (per additional km). |
| 37 | Carriage of Empty cement bags from source to road/dumping site of work by Mechnical Transport including cost of loading, unloading and stacking.24.1) Lead upto 05 kms. |
| 38 | Beyond 05 km to 10km (per km). |
| 39 | Beyond 10 km to 20km (per km). |
| 40 | Beyond 20km (per additional km). Please Enable Macros to View BoQ information |