| 1 | Sub-Head : Concrete Work |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 3 | 1:2:4 (1 Cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources). |
| 4 | Sub-Head : Masonry Work |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : |
| 6 | Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 7 | Sub-Head : Steel Work |
| 8 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. |
| 9 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 10 | Sub-Head : Roofing |
| 11 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. |
| 12 | (i)Single socketed pipes. |
| 13 | 110 mm diameter |
| 14 | Providing and fixing on wall face unplasticised - PVC moulded fittings/accessories for unplasticised Rigid PVC rain water pipes conforming to IS 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. |
| 15 | Single tee without door |
| 16 | 110x110x110 mm |
| 17 | Bend 87.5° |
| 18 | 110 mm bend |
| 19 | Sub-Head : Finishing |
| 20 | 12 mm cement plaster of mix : |
| 21 | 1:6 (1 cement: 6 fine sand) |
| 22 | 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix : |
| 23 | 1:3 (1 cement: 3 fine sand) |
| 24 | Finishing walls with Acrylic Smooth exterior paint of required shade : |
| 25 | New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) |
| 26 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 27 | Painting (one or more coats) on rain water, soil, waste and vent pipes and fittings with black anticorrosive bitumastic paint of approved brand and manufacture on old work : |
| 28 | 75 mm diameter pipes . |
| 29 | 100 mm diameter pipes . |
| 30 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : |
| 31 | One or more coats on old work. |
| 32 | Finishing walls with Acrylic Smooth exterior paint of required shade : |
| 33 | Old work (One or more coat applied @ 0.90 ltr/10 sqm). |
| 34 | Sub-Head : Repairs to Buildings |
| 35 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-harge. |
| 36 | With cement mortar 1:4 (1 cement : 4 fine sand). |
| 37 | Renewing glass panes, with wooden fillets wherever necessary: |
| 38 | Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm). |
| 39 | Supply of a labour for miscellaneous civil maintenance works in T E and staff quarters compound as and when required by E-IN-C, such as uprooting vegitation, leveling the earth, cleaning the roots, khurras, gully trap minor urgent civil works whenever required all complete as per direction of Engineer-in- charge (The item included all labour, T&P required) |
| 40 | Sub-Head : Conservation of Heritage Buildings |
| 41 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. |
| 42 | The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. |
| 43 | Note :- (1) The elevational area of the scaffolding shall be measured for payment purpose. |
| 44 | (2) The payment will be made once only for execution of all items for such works. Please Enable Macros to View BoQ information |