|
| 1 | Credit for Steel, GI pipe and MS Angles etc. |
| 2 | operation and maintenance for 1st year after defect liability period (12 months). |
| 3 | operation and maintenance for 2nd year after defect liability period (12 months). |
| 4 | operation and maintenance for 3rd year after defect liability period (12 months). |
| 5 | operation and maintenance for 4th year after defect liability period (12 months). |
| 6 | operation and maintenance for 5th year after defect liability period (12 months). |
| 7 | operation and maintenance for complete scope of work mentioned in DNIT as per schedule iv for a period of 5 year after 12 month of defect liability period and 3 month trial run period will be charged to annual maintenance estimate complete in all respect.i) operation and maintenance during defect liability period after 3 month trial period (12 Months) ( operaion and Maintainece). |
| 8 | Providing, supplying, and fixing Manual Coarse Bar screen Channel Width: 900 mm, Channel Depth: 1500mm, Water Depth : 1000 mm, Bar Spacing : 20 mm, Bar Thickness: 10x50mm, Angle of Inclination: 60 Degree MOC : SS-304. |
| 9 | Providing, supplying, erecting, installing, testing, and commissioning of a multi-compartment LT Indoor panel with A/M change over switch for DG and EB power source, independent feeders for pumps, PLC Control panel , field instruments, Including Pump Monitoring Unit (PMU), UPS, for Pump operation VFD panel with a bypass switch and emergency Star/Delta starter, A/Mswitch for Auto control from PLC, Push buttons for manual operation, status indicating lamps, with reputed make contactors, Volt and Amp meters, cables, MCBs etc. Motor control Panel - having required front surface area, fabricated in fully compartmentalized design from CRCAsheet steel of 2mm thick for frame work and covers, 3mm thick for gland plates i/c cleaning and finishing complete with 10 tank spray based tricationic phosphating treatment process for powder coating in approved shade, PU Foam Gasket without manual pasting, joint less (temperature withstand capacity - 40degC to plus 120degC) for maintaining IP protection, power capacitors etc., integrated and synchronized with SCADA master control system of inVillage Bapoli. ensuring the panel complete in all respects to the satisfaction of the Engineer-in-Charge. (designed for a 60HP,40HP,20HP HP non-clog submersible sewage pumps set with an additional 15% loading margin for safety) |
| 10 | Providing, supplying, erecting, installing, testing, and commissioning of a multi-compartment LT Indoor/outdoor panel with A/M (Auto Manual) change over switch for DG and EB power source, independent feeders for pumps, PLC Control panel , field instruments, including Pump Monitoring Unit (PMU), UPS, for Pump operation VFD panel with a bypass switch and emergency Star/Delta starter, A/M switch for Auto control from PLC, Push buttons for manual operation, status indicating lamps, with reputed make contactors, Volt and Amp meters, Digital Multifunction/Energy Meter, Hour Meter, Surge Protection device, cables, MCBs etc. Motor control Panel - having required front surface area, fabricated in fully compartmentalized design from CRCA sheet steel of 2mm thick for frame work and covers, 3mm thick for gland plates i/c cleaning and finishing complete with 10 tank spray based tricationic phosphating treatment process for powder coating in approved shade, PU Foam Gasket without manual pasting, joint less (temperature withstand capacity - 40degC to plus 120degC) for maintaining IP protection, power capacitors etc., integrated with SCADA master control system ensuring the panel complete in all respects to the satisfaction of the Engineer-in-Charge.(designed for 200 cum/hr and 35 m head. non clog submersible sewage pumps with an additional 25% loading margin for safety) For Pumps (2W plus 1S) |
| 11 | Providing, Supplying, erection, testing and commissioning of NON CLOG SUBMERSIBLE SEWAGE PUMPSET(Power Driven Submersible pumps primarily designed for handling waste water with End Suction Enclosed Impeller and Volute Casing) sets fitted with effective motor, mechanical seal, thermal and moisture sensor, suspension device, anti coupling bracket, 10 mguide pipe and Cable From Sump Well to pump Chamber including LT PMU auto coupling with integral bend (with auto coupling Pin SS Foundation Bolt Complete with base frame and RCC Foundation) complete in all respects as per scope of work and specification of Non Clog submersible pumpset of discharge 252 cum/hr, and 35 m head.(60HP) |
| 12 | Providing, Supplying, erection, testing and commissioning of NON CLOG SUBMERSIBLE SEWAGE PUMPSET(Power Driven Submersible pumps primarily designed for handling waste water with End Suction Enclosed Impeller and Volute Casing) sets fitted with effective motor, mechanical seal, thermal and moisture sensor, suspension device, anti coupling bracket, 10 mguide pipe and Cable From Sump Well to pump Chamber including LT PMU autocoupling with integral bend (with autocoupling Pin SS Foundation Bolt Complete with base frame and RCC Foundation) complete in all respects as per scope of work and specification of Non Clog submersible pumpset of discharge 168 cum/hr, and 35 m head.(40HP) |
| 13 | Providing, Supplying, erection, testing and commissioning of NON CLOG SUBMERSIBLE SEWAGE PUMPSET(Power Driven Submersible pumps primarily designed for handling waste water with End Suction Enclosed Impeller and Volute Casing) sets fitted with effective motor, mechanical seal, thermal and moisture sensor, suspension device, anti coupling bracket, 10 mguide pipe and Cable From Sump Well to pump Chamber including LT PMU autocoupling with integral bend (with autocoupling Pin SS Foundation Bolt Complete with base frame and RCC Foundation) complete in all respects as per scope of work and specification of Non Clog submersible pumpset of discharge 84 cum/hr, and 35 m head.(20HP) |
| 14 | Providing, supplying, erection, testing and commissioning Supply and installation of cast iron manually operated sluice gates of size 400 mm (W) × 400 mm (D) to be provided at the receiving chamber, complete in all respects as per IS 13349:1992. The sluice gate shall be suitable for open channel installation, including all necessary components suchas frame, gate leaf, spindle, operating mechanism and anchor bolts. The gate shall be pressure-tight and suitable for sewage application, coated with anticorrosive epoxy paint. |
| 15 | Providing, Supplying, Installation, testing and commissioning of NON CLOG SUBMERSIBLE SEWAGEPUMPSET(Power Driven Submersible pumps primarily designed for handling waste water with End Suction Enclosed Impeller and Volute Casing) sets fitted with effective motor, mechanical seal, thermal and moisture sensor, suspension device, anti coupling bracket, guide pipe and Cable From Sump Well to pump Chamber and Panel including LT PMU autocoupling with integral bend (with autocoupling Pin SS Foundation Bolt Complete with base frame and RCC Foundation) complete in all respects as per scope of work and specification of Non Clog submersible pumpset of discharge 200 cum/hr and 35m head. |
| 16 | Providing, Supplying, lowering, stringing, laying and fixing in position Expansion joint as per IS 1538 amended upto date complete in all respect of the following sizes including all jointing material, cost of all labour, testing and commissioning as per Technical Specifications. (150 mm i/d) |
| 17 | Providing, Supplying, lowering, stringing, laying and fixing in position Expansion joint as per IS 1538 amended upto date complete in all respect of the following sizes including all jointing material, cost of all labour, testing and commissioning as per Technical Specifications. (200 mm i/d) |
| 18 | Civil Work |
| 19 | HSR Items Please Enable Macros to View BoQ information |