| 1 | Labour for cleaning the work site before and after work etc. |
| 2 | Labour for cleaning the work site before and after the work |
| 3 | Taking out existing CC interlocking paver blocks from footpath/central verge, including of rubbish etc., disposal of unserviceable materials, including removal of material to the dumping ground, for which payment shall be made separately and stacking of serviciable material within 50 meter lead as per direction of Enginee-in-Charge |
| 4 | Dismantling plain cement or lime concrete work including slacking serviceable materials in countable slack within 15 meter, lead and disposal of unserviceable materials with all leads all complete as per direction of E/I |
| 5 | Diamantlling of reinforced cement work including stacking serviceable materials in countable stack within 15 meters, lead and disposal of unserviceable materials with all leads as per direction of E/I |
| 6 | Earth work in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance of up to 50M including all lifts, levelling, ramming the foundation trenches removing rootrs of trees, shurbs all complete as per approved design, building specification and direction of E/I |
| 7 | By mixing in place method construction of granular sub-base by providing close graded material mixing in a mechanical mix plant at OMC carriage of mixed material to work side spreading in uniform layers with motor grader on prepare surface and compacting with motor power roller to achieve the desired density complete as per clause 401 |
| 8 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royality and taxes all complete as per building specification and direction of E/I (Mode of measurement of compacted volume) |
| 9 | Chequerred precast cement concrete tiles 22mm thick in footpath &courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing and cleaning etc, complete on 20mm thick bed mortar (1:4) |
| 10 | Providing and laying in position cement concrete in kerbs, steps and the like or near ground level excluding the cost of centering and shuttering and finishing 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20mm nominal size) |
| 11 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20mm nominal size) |
| 12 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, band, plain window sills, staircases and spiral stair cases above plinth level up to floor level, excluding the cost of centering, shuttering finishing and reinforcement with 1:1.5:3 |
| 13 | Centering and shuttering including strutting, propping etc and removal of form for foundation, footing, bases of column, etc for mass concrete |
| 14 | Providing Tor steel reinforcement of 10mm, 8mm dia bars as per approved design and drawingdo----do-----E/I50% 10mm dia bars |
| 15 | 50% 8mm dia bars |
| 16 | Providing and fixing 150mm dia, and overall length 950mm Cement concrete Bollard made with cement concrete of M30 grade by vibro compaction method and steel using 4-tor 8mm vertcally with 4mm stirrups @ 150 c/c spacing, smooth finishes as per approved design and sample, fixed on ground with p.c.c. m15 300x300x250mm deep including cutting of existing p.c.c. floor with all complete.Bollard to be complete fixed @ 600 mm c/c |
| 17 | Finishing walls with Premium Acrylic Smooth exterior paint with silicone additives \\"Snowcryl-XT\\" of M/S Snowcem India Ltd, or equivalent of required shade.New work (Two or more coats applied @1.43 Itr/10sqm. Over and including base coat of water proofing cement paint Snowcem Plus or equivalent applied @ 2.20 kg./10 sq.m.)for kerb stone |
| 18 | Providing and stacking of Foxtail palm of ht. 240-270 cm bottom girth 35-40 cm well developed in big size HDPE bags as per direction of the officer-in-charge. |
| 19 | Local Sand lead18 km |
| 20 | Sand lead 42 km |
| 21 | Stone Chips lead 29 km |
| 22 | Earth lead 1 km |
| 23 | Good & Service Tax (GST) |
| 24 | Labour Cess Please Enable Macros to View BoQ information |