|
| 1 | Material/Erection of Augumentation of 11/0.4 kV 100 KVA to 250 KVA, Distribution Sub-Station |
| 2 | Prov.Distribution Transformer (Ordinary) ,11/0.4 kV 250 KVA, |
| 3 | Prov.GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 4 | Prov.LT Distribution Panel Box With MCCB (630A, 50KA,3P, ,MCCB 250 Amp-2 Nos) |
| 5 | Pipe Earthing Set |
| 6 | Prov Muffs with concerete filling |
| 7 | Prov.AAAC 7/3.15mm² Conductor for Earthing |
| 8 | Prov. CT-PT Combined Unit 11 KV 50/5 Amp |
| 9 | Prov.Nuts and Bolts of Various Sizes (with flat and spring washers)] |
| 10 | Prov.Aluminium Thimble |
| 11 | Prov.Copper Thimble |
| 12 | Prov.Barbed Wire |
| 13 | Prov.LT Cable (3.5 Core) 300 mm² |
| 14 | Prov.Aluminium Paint. |
| 15 | Prov & Construction of Transformer Bed (Civil work) complete in all respect |
| 16 | Prov & Construction of Chain Link Fencing,Angle iron,Gate etc for transformer fencing complete in all respect |
| 17 | Prov & Erection of 11 Mtr S.T.Pole a/w Re-Sagging of Existing 11kV HT Line & Double Ckt LT Line of Existing Network |
| 18 | Prov.Meter reading instrument along with Screen for supporting Meter reading complete in all respect |
| 19 | Transportation Charges of All Material alongwith allied accessories including frtom central store to site of work along with mannual carriage complete in all respect |
| 20 | Un-loading of 100 KVA transformer (Dismantled) from S/Stn structure & loading in vehicle and unloading at store . |
| 21 | Loading of 250 KVA transformer from at store in vehicle & unloading at site and loading to the S/Stn structure ( Hydra Charge for DTR) |
| 22 | Erection of 250 KVA transformer alongwith ,LT box, MCCB switch, Cable service, Cable and complete in all respect. |
| 23 | Erection of ,CT-PT Combined Unit 11 KV 50/5, and Energy Meter complete in all respect. |
| 24 | Erection of earthing digging of pit , fixing of earth rod, clamp,earth wire and connecting to the structure, providing charcoland salt for earthing,filling of the pitwith material,providing earthing to the transformer,LT Box, meter boxetc, providing barbed wire and painting,providingearthing conn.to G.O. switch,lightning arrestor etc alongwith allied accessories complete in all respect. |
| 25 | Erection of G.O Switch ,complete in all respect. |
| 26 | Dismantlement of existing 100KVA transformer, Cable,LT Box, meter boxetc, alongwith allied accessories complete in all respect Please Enable Macros to View BoQ information |