| 1 | (A)Material/Erection of Aug. of 63 KVA to 100 KVA Dtr |
| 2 | Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 100 KVA |
| 3 | Prov.LT Distribution Panel Box with MCCB 160 A, 35 kA, 4P ) and Kit-Kat 200Amp |
| 4 | Prov.GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 5 | Prov. Nuts and Bolts of Various Sizes with flat and spring washers |
| 6 | Prov. LT Cable (3.5 Core) 120 mm² |
| 7 | Prov.Pipe Earthing Set |
| 8 | Prov.Meter reading instrument along with Screen for supporting Meter reading complete in all respect |
| 9 | Prov.AAAC 7/3.15 mm² for earthing |
| 10 | Prov. plinth for double pole (100KVA S/Stn.) structure complete with digging, C.C. 1:6:12, R.R. masonary and plastering etc. size 10'x3'x2.5' |
| 11 | Loading of 100 KVA transformer from at store in vehicle & unloading at site and loading to the S/Stn structure |
| 12 | Dismantlement of existing 100KVA transformer, Cable,LT Box, meter boxetc, alongwith allied accessories complete in all respect |
| 13 | Un-loading of 63KVA transformer (Dismantled) from S/Stn structure & loading in vehicle and unloading at store . |
| 14 | Erection of 100KVA transformer alongwith ,LT box, MCCB switch, Cable service, Cable and Energy Meter complete in all respect. |
| 15 | Transportation Charges of All Material alongwith allied accessories including frtom central store to site of work along with mannual carriage complete in all respect |
| 16 | Erection of earthing digging of pit , fixing of earth rod, clamp,earth wire and connecting to the structure, providing charcoland salt for earthing,filling of the pitwith material,providing earthing to the transformer,LT Box, meter boxetc, providing barbed wire and painting,providingearthing conn.to G.O. switch,lightning arrestor etc& poles. |
| 17 | (B) Material/Erection for Extension of 3-Phase LT line from 100KVA S/stn Kopar Lahar |
| 18 | Prov. RCC Muff of 2000mm length |
| 19 | Prov. AAAC 7/3.15mm² Conductor (50mm²) {Includes Cutting and wastage} |
| 20 | Prov. GI 8No SWG |
| 21 | Prov.LT Stay set complete |
| 22 | Prov. stay wire(7/3.15mm) @ 7 Kg per set |
| 23 | Prov.Pole Clamps (M.S. Flat 50X6 mm) |
| 24 | Prov. Egg Insulator |
| 25 | Prov.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16mm Φ or more (with flat and spring washers)] |
| 26 | Prov. Aluminiun paint |
| 27 | Road Transportation from central store to site of work along with mannual carriage alongwith allied accessories complete in all respect |
| 28 | Erection of LT stay set i/c digging of pit (1.20x0.90x1.5)mtr, fixing of stay rod, filling of pit nozeling & tightening of stay wire complete in all respect. |
| 29 | Erection Charges of ST pole 9 Mtrs Long complete in all respect. |
| 30 | Erection charges for laying, sagging and stringing of AAAC 7/3.15(50mm2) (Single wire) (0.130x4) =0.520Km.Conductor complete in all respect. Please Enable Macros to View BoQ information |