|
| 1 | (A) Material/Erection of New 11/0.4KV,100 KVA S/Stn. Municipal Ground Kangra |
| 2 | Prov.Muffs (2000mm) with concerete filling |
| 3 | X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 4 | MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA's |
| 5 | X-Arm: [Channel Iron (75x40x4.8 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 6 | X-Arm: [Channel Iron (100x50x5mm), Length : 2800 mm X 2 Nos] for Transformer Bed |
| 7 | X-Arm [Channel Iron (100x50x5 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer] |
| 8 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 9 | MS Angle Iron (35X35x6 mm), Length : (460 ) x 2 Nos |
| 10 | MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing |
| 11 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 12 | MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos |
| 13 | GO Switch Handle Supporting: [Channel Iron (75x40x4.8 mm), Length : 460 mm |
| 14 | GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 15 | D.O Fuse Unit |
| 16 | Surge Arrester, 9 kV Station Class (Porcelain Type) |
| 17 | Stay set complete (i/c Stay Clamps) |
| 18 | Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 19 | Pipe Earthing Set |
| 20 | Prov.AAAC 7/3.15mm² Conductor for Earthing |
| 21 | LT Distribution Panel Box with MCCB(160A, 35 kA, 4P) and Kit-Kat-200A |
| 22 | Half Clamp (M.S. Flat 50X6 mm) |
| 23 | Full Clamps (M.S. Flat 50X6 mm) |
| 24 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 25 | Aluminium Thimble |
| 26 | Copper Thimble 120 mm² (200 Amp) |
| 27 | Danger Plate |
| 28 | Barbed Wire |
| 29 | LT AB Cable (3.5 Core) 120 mm² |
| 30 | Prov. Aluminium Paint. |
| 31 | Transportation Charges of All Material alongwith allied accessories including frtom central store to site of work along with mannual carriage complete in all respect |
| 32 | Erection charges |
| 33 | Prov. plinth for double pole (100KVA S/Stn.) structure complete i/c excavation of pit, Boulder Filling Upto Ground Level and making plinth of C.C.1:5:10, of size 10'x3'x2.5'. |
| 34 | Prov.& fixing wire mesh fencing & Gate for double pole (100KVA S/Stn.) structure complete in all respect i/c painting & locking arrangement,of size 12'x8'x8'. |
| 35 | (B)Material/Erection of New LT Line atMunicipal Ground Kangra |
| 36 | Prov.Muffs with concerete filling (2000 mm) |
| 37 | Prov.LT Stay Set |
| 38 | Prov.Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 39 | Prov.Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102kg/m |
| 40 | Prov Full Pole Clamps (M.S. Flat 50X6 mm) |
| 41 | Prov.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16mm Φ or more (with flat and spring washers)] |
| 42 | Prov.Aluminium Paint |
| 43 | Erection of LT stay set i/c digging of pit (1.20x0.90x1.5)mtr, fixing of stay rod, filling of pit nozeling & tightening of stay wire complete in all respect. |
| 44 | Erection Charges of ST pole 9 Mtrs Long complete in all respect. |
| 45 | Erection charges for laying, sagging and stringing of AAAC 7/4.26(50mm2) (Single wire) (0.060x4) =0.240Km.Conductor complete in all respect. Please Enable Macros to View BoQ information |