| 1 | Safe Loading carriage & unloading of following material from store centre to pit site/JE Dump store |
| 2 | PCC pole 8.5 mtr long |
| 3 | 11 KV XLPE Cable of Size 3x185/3x120/3x70 sq mm |
| 4 | G1 Wire |
| 5 | 11 KV Indoor Metering cubicle |
| 6 | Stay Set Complete |
| 7 | MS Earthing Rad complete |
| 8 | 11 KV Pin insulator with Gl pin |
| 9 | 11 KV Disk Insulator with Fitting |
| 10 | 11/0.4 KV T/F 25 KVA |
| 11 | 11/0.4 KV T/F 63 KVA |
| 12 | 11 kv V- X arm |
| 13 | Top Channel |
| 14 | Dopper Channel |
| 15 | T- off Channel |
| 16 | Sub Station Angle |
| 17 | 11 KV outdoor, pole mounted CT/PT unit. |
| 18 | ACSR Weasel Conductor |
| 19 | ABC Cable (3x50+1x35+1x16/3x95+1x70+1x35) Sq mm. |
| 20 | ABC Cable (1x25+1x16) Sq mm. |
| 21 | DB Box/three Phase /Single Phase. |
| 22 | Erection of Single PCC 8.5 mtr long Pole with necessary accessories (All necessary items like clamps, nut & bolt, etc. arrenge by the contractre except the store material) |
| 23 | Grouting of Pole in deep 1/6 the length of Pole in ratio 1:4:8in cement sand & stone grit. |
| 24 | Erection of PCC 8.5 mtr long double pole with necessary accessories (All necessary items like clamps, nut & bolt, etc. arrenge by the contractre except the store material) |
| 25 | Grouting of Pole in deep 1/6 the length of Pole in ratio 1:4:8in cement sand & stone grit. |
| 26 | Concreting of Pole Plinth 300mmx45 mm above ground level in 1:2:4 in cement coarse sand & stone grit. |
| 27 | Grouting and Nuzzling of 11 KV stay set complete (All necessary items like clamps, nut & bolt, stay insulater & civil material, etc. arrenge by the contractre except the store material) |
| 28 | Ordinary Earthing by 11 KV MS earth Rod 2500 mm per RESPO schedule. |
| 29 | Cable hoisting of 11 XLPE Cable on double pole 3X70, 3X120, 3x185) sqmm including jumpering etc complete ( GI Pipe arreng by the contractore) as per RESPO Norms. |
| 30 | Laying of 11KV 3x185/3x120/3x70 sq mm XLPE single cable after laying of cable with proper boxing. |
| 31 | Installation of 11 KV CT/PT double metering unit of constructed double pole structure as per RESPO norms. Only 11 KV CT/PT unit shall be supplied by department (All material supplied by the contractre material. |
| 32 | Fixing & commissioning of 11 KV pilfer Resistance meter (25/5Amp.) All material except pilfer Resistance metering cubical shall be supplied by the contractor |
| 33 | Fabrication erection & commissioning of 63 KVA T/F on Double pole with all accessories. All material except 63 KVA T/F shall be supplied by the contractor. |
| 34 | Fabrication erection and commissioning of 25 KVA T/F on double/single pole with all accessories. All material except 25/16/10 KVA T/F shall be supplied by the contractor. |
| 35 | Chamical Earthing Complete Work. |
| 36 | Stringing & Sagging ABC Cable(3x50+1x35+1x16/3x95+1x70 +1x35) sq mm. winding & jumpering of LT Line With AB Condueter as per RESSPO norms (All necessary items like clamps, nut & bolt, etc. arrenge by the contractre except the store material) |
| 37 | Stringing & Sagging ABC Cable (1x25+1x16) sq mm. winding & jumpering of LT Line With AB Conductor as per RESSPO norms (All necessary items like clamps, nut & bolt, etc. arrenge by the contractre except the store material) |
| 38 | Fixing of LT DB box Three phase/ Single Phase. |
| 39 | Supply & Fixing Of 11 KV Fuse Set (All Material Supply by The Contractor) |
| 40 | Stringing & Sagging of three phase 11 kv line on 28 ACSR Weasel/ Rabbit conductor as per RESPO Norms |
| 41 | Looping & chopping of tree branches for clearance of 29 HT/LT line after clearance of line through out pieces of tree branches of site (Approx 3 Km). Please Enable Macros to View BoQ information |