| 1 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically treated bars of Grade Fe-500D or More |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for :Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts |
| 8 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrte work using cement content as per approved design mix manufactured in fully autometic batching plant and transported to site of work in transit mixer for are leads having continuous agitated mixer manufactured as per mix design of specified grade for rienforced cement concrete work including pumping of R.M.C from transit mixer to site of laying excluding the post of centering shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per I.S : 9103 to accelerate/ retard setting of concrete improve workablity without impairing streght and durability as per direction of the engineer-in- charge (note:- cement content considered in this item is @ 330 kg/cum. excess/less cement used as per design mix is payable/ recoverable separately) all works upto plinth level. |
| 9 | providing wall putty on new surface with approved quality material of berger/ Jk/ birla or similar make 2 coats |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work |
| 11 | Washed stone grit plaster on exterior walls height upto 10 metre above ground level, in two layers, under layer 12 mm cement plaster 1:4 (1 cement : 4 coarse sand ), furrowing the under layer with scratching tool, applying cement slurry on the under layer @ 2 Kg of cement per square metre, top layer 15 mm cement plaster 1:1/ 2:2 (1 cement: 1/2 coarse sand : 2 stone chipping 10 mm nominal size), in panels with groove all around as per approved pattern, including scrubbing and washing the top layer with brushes and water to expose the stone chippings ,complete as per specification and direction of Engineer-in- charge (payment for providing grooves shall be made separately). Please Enable Macros to View BoQ information |