| 1 | Dismentling old C.C Road/ I/c All Completion of work. |
| 2 | Disposal of refusse dismantled material up to distance 5 km at Site. |
| 3 | Dismentling old B/W I/c All Completion of work. |
| 4 | Deduct cost old Bricks 20% |
| 5 | Deduct cost old Bricks ballast 80% |
| 6 | Concrete with 4cm gauge approved Stone ballast, coarse sand and cement in proportion of 8:4:1 including supply of all materials labour and completion of the work .S I no 281 |
| 7 | M-150 brick work in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work. |
| 8 | 12mm thick Plaster in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work. |
| 9 | Construction of granular sub base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with smooth wheel roller to achive the desired density complete as per Technical Specification Clause 401 |
| 10 | WBM Grading 3 (22.4-53 mm Stone ballast) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 11 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383 i/c all complete at Site |
| 12 | R.C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labour and T&P etc.required for proper completion of work |
| 13 | Supply and fixing of mild steel bars for RCC work and angle for channel including supply of all material,labour and T&P etc.required for proper completion of work. Please Enable Macros to View BoQ information |