| 1 | 1)Name Of Work:-Constructing RCC Pipe Underground Gutter In Gaothan at Ropale |
| 2 | Item No. 1 :- Excavation for foundation / pipe trenches in earth soils of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift 0 to 1.5 M) (Bd-A1/259) |
| 3 | Item No. 2 :- Excavation for foundation / pipe trenches in hard murum including removing the excavated material up to a distance of 50M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.(lift 0 to 1.5M) |
| 4 | Item No. 3 :- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-incharge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-4/259) (lift 0 to 1.5M) |
| 5 | Item No. 4 :-Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distanceof 50 metre beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. (Bd-A-6/259 |
| 6 | Item No. 5 :- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. (Bd-A-10/263) |
| 7 | Item No.6:-Providing and supplying in standard lengths ISI mark rigid unplasticised PVC pipes suitable for potable water with solvent cement joints including cost of couplers, as per IS specification no.4985/1988 including all local and central taxes, transportation, freight charges, octroi, inspection charges, loading, unloading, conveyance to the departmental stores and including cost of jointing material i.e. solvent cement, etc. complete. 90 mm Dia. PVC 4 Kgcm2 |
| 8 | 110 mm Dia. PVC 4 Kgcm2 |
| 9 | Item No.7:- Lowering, laying and jointing PVC pipes and specials of following class and diameter including cost of conveyance from stores to site of works including cost of all labour, material, except cement solvent, giving satisfactory hydraulic testing as per IS code, etc. complete. 90 mm Dia. PVC 4 Kgcm2 |
| 10 | 110 mm Dia. PVC 4 Kgcm2 |
| 11 | Item No. 8 :- Providing ISI standard RCC Pipes in standard lengths of following class & dia. Suitable for either coller joints or rubber ring joints, excluding GST levied by GOI & GOM in all respect including inspection charges, transport to departmental stores, unloading and stacking etc. complete as per IS-458/1988. NP ll Type 200 mm Ø RCC (2.0m Each Pipe Length) |
| 12 | Item No. 9 :- Lowering, laying and jointing in proper grade and alignment R.C.C. pipes with collar joints in C.M.1:1 proportion or socketed R.C.C. pipes with rubber joints (excluding cost of rubber ring or R.C.C. collar,) including cost of conveyance from stores to site of work, cost of jointing material, labour, etc. complete as directed by Engineerin- charge (For all class of pipes.) as per IS- 783-1985. NP ll Type 200 mm Ø RCC (2.0m Each Pipe Length) |
| 13 | Item No.10:- Providing and constructing B/B masonary Valve Chamber with 15 cm thick 1:3:6 proportion PCC bedding additoinal excavaton B.B. masonary in CM 1:5 cm thick precast RCCFrames and Cover etc. complete as directed by engineer incharge.Note : Wall thickness : 0.23 M for depth of 1.2 M and 0.35 M for balance depth exceeding 1.2 M. |
| 14 | Item No. 11:- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging etc. complete. |
| 15 | Item No. 12:-Providing and laying in situCement ConcreteM-15of trap/granite/quartzite/ gneissmetal forfoundationandbedding including bailing out water, formwork,compaction, curing, etc. complete (Cement 5.90 bags / cum) |
| 16 | Add 18% GST |
| 17 | 2)Name Of Work:-Constructing Underground RCC Pipe Gutter at Ropale |
| 18 | Item No. 1 :- Excavation for foundation / pipe trenches in earth soils of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift 0 to 1.5 M) (Bd-A1/259) |
| 19 | Item No. 2 :- Excavation for foundation / pipe trenches in hard murum including removing the excavated material up to a distance of 50M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.(lift 0 to 1.5M) |
| 20 | Item No. 3 :- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-incharge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-4/259) (lift 0 to 1.5M) |
| 21 | Item No. 4 :- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. (Bd-A-10/263) |
| 22 | Item No.5:-Providing and supplying in standard lengths ISI mark rigid unplasticised PVC pipes suitable for potable water with solvent cement joints including cost of couplers, as per IS specification no.4985/1988 including all local and central taxes, transportation, freight charges, octroi, inspection charges, loading, unloading, conveyance to the departmental stores and including cost of jointing material i.e. solvent cement, etc. complete. 90 mm Dia. PVC 4 Kgcm2 |
| 23 | 110 mm Dia. PVC 4 Kgcm2 |
| 24 | Item No.6:- Lowering, laying and jointing PVC pipes and specials of following class and diameter including cost of conveyance from stores to site of works including cost of all labour, material, except cement solvent, giving satisfactory hydraulic testing as per IS code, etc. complete. 90 mm Dia. PVC 4 Kgcm2 |
| 25 | 110 mm Dia. PVC 4 Kgcm2 |
| 26 | Item No. 7 :- Providing ISI standard RCC Pipes in standard lengths of following class & dia. Suitable for either coller joints or rubber ring joints, excluding GST levied by GOI & GOM in all respect including inspection charges, transport to departmental stores, unloading and stacking etc. complete as per IS-458/1988. NP ll Type 200 mm Ø RCC (2.0m Each Pipe Length) |
| 27 | Item No. 8 :- Lowering, laying and jointing in proper grade and alignment R.C.C. pipes with collar joints in C.M.1:1 proportion or socketed R.C.C. pipes with rubber joints (excluding cost of rubber ring or R.C.C. collar,) including cost of conveyance from stores to site of work, cost of jointing material, labour, etc. complete as directed by Engineerin- charge (For all class of pipes.) as per IS- 783-1985. NP ll Type 200 mm Ø RCC (2.0m Each Pipe Length) |
| 28 | Item No.9:- Providing and constructing B/B masonary Valve Chamber with 15 cm thick 1:3:6 proportion PCC bedding additoinal excavaton B.B. masonary in CM 1:5 cm thick precast RCCFrames and Cover etc. complete as directed by engineer incharge.Note : Wall thickness : 0.23 M for depth of 1.2 M and 0.35 M for balance depth exceeding 1.2 M. |
| 29 | Item No. 10:- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging etc. complete. |
| 30 | Add 18% GST Please Enable Macros to View BoQ information |