| 1 | Emergency & MSEDCL Related Works |
| 2 | Providing earthing with copper earth plate size 30 x 30 x 0.315 cm complete with all materials, testing & recording the results as per specification no. EA-EP |
| 3 | Providing pipe type earthing with 40mm. dia. G.I. pipe or 20 mm dia. G.I. Rod complete with all materials testing and recording the results as per specification no. EA-EP |
| 4 | Supplying and erecting G.I. stay set for poles, including loop insulators at inaccessible height with anchor plate 300x300x6mm., straining screws, G.l. stay wire 7/10 SWG, G.l. stay rod 20mmx1.8m length and pole clamps duly erected in provided cement concrete foundation complete. |
| 5 | Supplying and erecting pipe post made from G.I. pipe 40mm dia 3m overall length, with two bends, fixed to pipe at the top & bottom, round bended erected with MS flat welded MS bolts 15cm long duly grouted in wall with necessary clamps, nuts and bolts etc. duly painted with two coats of aluminium paint complete. |
| 6 | Supplying and erecting guarding loop using G.l. wire no. 8SWG for LT OH line of horizontal formation erected with 20SWG G.l. wire as binding wire and 50mm section on each side complete. |
| 7 | Supplying and erecting fibre/PVC spacers for LT overhead line 3 to 5 conductors complete erected. |
| 8 | Supplying and erecting pole clamp made from 50x6mm MS flat for pole or pipe, post erected with 15mm bolts and nuts duly painted with one coat of red oxide and two coats of aluminium paint complete |
| 9 | Supplying and erecting pole clamp made from 50x10mm MS flat for pole or pipe, post erected with 15mm bolts and nuts duly painted with one coat of red oxide and two coats of aluminium paint complete. |
| 10 | Supplying and erecting ‘D’ type pole clamps, fabricated from 50x6mm MS flat with 15mm bolts and nuts fixed to steel tubular pole duly painted with one coat of red oxide and two coats of aluminium paint complete. |
| 11 | Supplying and erecting C type (half) clamps for pole made from 50x6mm flat for fixing cross arms by means of 15mm bolts and nuts painted with one coat of red oxide and two coats of aluminium paint complete. |
| 12 | Dismantling the existing pole up to 6 m height with brackets, clamps, insulators, stay from the c.c. foundation and making the site clear by refilling the pits with excavated materials and bringing it to the ground level. |
| 13 | Dismantling the existing pole above 6 m height with brackets, clamps, insulators, stay from the c.c. foundation and making the site clear by refilling the pits with excavated materials and bringing it to the ground level. |
| 14 | Dismantling the existing overhead line including G.I. wires of all sizes without damaging & making the coils in suitable sizes. |
| 15 | Providing pipe type earthing with 40mm. dia. G.I. pipe or 20 mm dia. G.I. Rod complete with all materials testing and recording the results as per specification no. EA-EP |
| 16 | Supplying and erecting GI wire of high purity of required sizes used for earthing or any other purposes on wall with necessary G. I. Clamps fixed on wall/cable/ conduit with screws complete. |
| 17 | Making cement concrete foundation including excavation (60 x 60 x 150) cm deep in 1:3:6 cement concrete 20 x 25 mm stone metal, (45 x 45 x 45) cm /45 cm dia. x 45 cm height plinth duly plastered, with necessary curing and finishing complete. (above 6 m to 9 m poles) |
| 18 | Making cement concrete foundation including excavation (60 x 60) cm x deep 1/6 of pole length in 1:3:6 cement concrete 20 x 25 mm stone metal, 45 cm x 45 cm x 45 cm /45 cm dia. x 45 cm. height plinth duly plastered, with necessary curing and finishing complete. (for above 9 m poles) |
| 19 | Making cement concrete foundation including excavation (60 x 60 x 150) cm deep in 1:3:6 cement concrete, (20 to 25) mm stone metal with necessary curing and finishing complete.(for stay). |
| 20 | Painting of pipe pole up to 6 m length along with street light / pole brackets / clamps etc by scrapping the existing paint complete as per specification no CW -PTG/PTP. |
| 21 | Painting of steel tubular / rail / RSJ pole above 6.0 m length along with street light pole brackets, clamps etc by scrapping the existing paint complete as per specification no CW -PTG/PTP. |
| 22 | Painting of feeder pillar / switchgears and frame of panel board with single coat of red oxide & two coats of approved quality enamel paint by scrapping existing paint painting the same complete. (while calculating square meter area, area of angle iron frame on which the switchgears are erected shall be considered if required |
| 23 | Supplying, erecting & terminating FR XLPE insulated, galvanised steelformed wire armoured (strip) cable 1100 V, 4 core 10 sq. mm. aluminiumconductor complete erected with glands & lugs, on wall/ trusses/pole or laid inprovided trench/ pipe as per specification no. CB-LT/AL |
| 24 | Supplying and erecting rolled steel joist (girder) pole 125 x 70 mm (13.3 kg/m)with base plate in provided foundation as per specification no. OH-PL/RSJ |
| 25 | Supplying and erecting M.S. pipe pole ‘B’ class 80 mm dia 6 m long with polecap, base plate in provided foundation as per specification no. OH-PL/GIP |
| 26 | Providing pipe type earthing with 40mm. dia. G.I. pipe or 20 mm dia. G.I. Rodcomplete with all materials testing and recording the results as per specification no.EA-EP |
| 27 | Supplying and erecting all aluminium stranded conductors 7/2.21 mm.complete. (Gnat) (73.77kg/km) as per specification No. OH-CON/AAC |
| 28 | Supplying and erecting all aluminium stranded conductors 7/3.10 mm.complete. (Ant.) (145.0 kg/km) as per specification No. OH-CON/AAC |
| 29 | Supplying and erecting 3 phase 5 core 16 sq.mm. (3x16+1x25+1x16) Aerialbunched aluminium cable along with necessary accessories for LT distributionon provided LT pole as per specification no. OH-CBL/ABC |
| 30 | Supplying and erecting 6 Way AB cable distribution box on provided pole withnecessary accessories as per specification no. OH-ABC/JBS |
| 31 | Excavating hard Rock or bituminous road by chiselling for preparing pit forpole / stay/earth plate / for laying cable/ pipe & clearing the site by removingdebris & making the site as required complete. |
| 32 | Making cement concrete foundation in 1:3:6 cement concrete, (20 to 25) mm.stone metal duly plastered with necessary curing for complete. (pole muffing orany other purpose). |
| 33 | Supplying and erecting single phase smart energy meter DLMS compliancewith 240V 50 cycles AC supply 5-30 A, ISI mark, accuracy class 1.0 with backlitLCD display, measuring & display kWh, V, I, kW, day, week, month & withcommunication module configurable for GSM/Wi-Fi, IrDA/Bluetooth, completeprovided panel with calibration certificate from manufacturer & duly wired withrequired size of PVC wires |
| 34 | Supplying and erecting Three phase smart energy meter DLMS compliancewith 3x240V 50 cycles AC supply 10-60 A, ISI mark, accuracy class 1.0 withbacklit LCD display, measuring & display V, I, kW, kWh, PF, kVA, kVAr, MD,day, week, month & with communication module configurable for GSM/Wi-Fi,IrDA/Bluetooth, complete provided panel with calibration certificate frommanufacturer & duly wired with required size of PVC wires. |
| 35 | Filtration of Transformer oil on site till satisfactory test results. |
| 36 | Supplying and topping up new transformer oil of approved make with testcertificate. |
| 37 | Supplying and replacing contactor for motor starter suitable for 100 H.P. to 125H.P. |
| 38 | Painting fencing of transformer substation including all supports, iron workand doors from both sides by scrapping existing paint, with one coat of red oxide& two coats of aluminium paint complete. |
| 39 | Painting of feeder pillar / switchgears and frame of panel board with singlecoat of red oxide & two coats of approved quality enamel paint by scrappingexisting paint painting the same complete. (while calculating square meter area,area of angle iron frame on which the switchgears are erected shall be consideredif required) |
| 40 | Spray painting of distribution transformer up to 200 kVA capacity completeas per specification no. CW-PTG/PDT. |
| 41 | Spray painting of distribution transformer above 200 kVA capacity completeas per specification no. CW-PTG/PDT. |
| 42 | Painting of steel tubular / rail / RSJ pole above 6.0 m length along withstreet light pole brackets, clamps etc by scrapping the existing paint completeas per specification no CW -PTG/PTP. |
| 43 | Making trench in soft soil having 0.9m depth and minimum 0.3 m width asper IS for laying provided cables of voltage range 3.3 kV to 11 kV complete asper specification No. CW-EXN-CTR |
| 44 | Supplying and erecting all aluminium stranded conductors 7/3.10 mm.complete. (Ant.) (145.0 kg/km) as per specification No. OH-CON/AAC |
| 45 | Supplying and erecting all aluminium stranded conductors 7/2.21 mm.complete. (Gnat) (73.77kg/km) as per specification No. OH-CON/AAC |
| 46 | Supplying & erecting inline cut point end pole D. P. Structure for 11/0.415kV, 200 KVA Transformer with R.S.J. Pole 2 Nos. of size 100 x 116 mm x 11Mtr. Long with suitable Distribution Box of C.R.C.A. Sheet 16 SWG with 4 PoleMCCB 400 Amps as incomer & 6 Nos. 200 Amps Kitkat / MCCB for out goingcircuits. Transformer D.P. Structure includes the A. B. Switch 200 Amps, D.O.fuse Set & L.A. Set. 2 Nos. Top channel of size 100 mmx 50 mm for erection ofA.B. Switch & 2 Nos. Base channel of size 100 mm x 50 x mm for erectingTransformer. Channel of size 75 x40 mm for erecting D.O. Fuse Set, L.A., A.B.Switch handle etc. Angle of size 50 x 50 x6 mm for erecting Distribution Box ,Transformer Belt etc.as per drawing (min. 176 Kg. iron work) with necessaryclamps, Nut-bolts. V cross arm, top clip, insulators etc. complete with cautionboard & barbed wire. D.P. Structure shall be erected in c.c. foundation complete. |
| 47 | Supplying & erecting inline cut point end pole D. P. Structure for 11/0.415kV, 100 kVA Transformer with R.S.J. Pole 2 Nos. of size 100 x 116 mm x 11Mtr. Long with suitable Distribution Box of C.R.C.A. Sheet 16 SWG with 4 PoleMCCB 200 Amps as incomer & 6 Nos.100 Amps Kitkat /MCCB for out goingcircuits. Transformer D.P. Structure includes the A. B. Switch 200 Amps, D.O.fuse Set & L.A. Set. 2 Nos. Top channel of size 100 mmx 50 mm for erection ofA.B. Switch & 2 Nos. Base channel of size 100 mm x 50 x mm for erectingTransformer Channel of size 75 x40 mm for erecting D.O. Fuse Set, L.A., A.B.Switch handle etc. Angle of size 50 x 50 x6 mm for erecting Distribution Box,Transformer Belt etc. as per drawing (min. 176 Kg. iron work) with necessaryclamps, Nut-bolts. V cross arm, top clip, insulators etc. complete with cautionboard & barbed wire. D.P. Structure shall be erected in c.c. foundation complete. |
| 48 | Supplying and erecting rolled steel joist (girder) pole 150 x 80 mm/150 x75mm (14.9 kg /m) with base plate in provided foundation as per specification no.OH-PL/RSJ |
| 49 | Supplying and erecting 11 kV outdoor type gang operated air break, triplepole switch 200 A capacity with 3 post pin type insulator per phase,mounted in horizontal or vertical position with necessary channels on providedcross arm with adequate length of \\"C\\" class G.l. pipe for operating handleerected on extended square shaft. The operating handle provided with lockand key at suitable height from ground level with necessary clamp. |
| 50 | Supplying and erecting, 11 kV outdoor type drop out fuse with insulatorcomplete with fuse holders, fuse barrel with metal fitting, fuse elementmounted on M.S. channel with working current of 15A capacity completeerected on provided cross arm. |
| 51 | Supplying operating rod, suitable for 11/22 kV supply with clamps forremoving drop out fuses at 6 meters length, 4 pieces each with rain shade withhand grip including earthling chain 1.5 m complete.(Light duty) |
| 52 | Supplying and erecting hard drawn copper solid wire no. 0 to 6 SWGcomplete erected for connections on H.T. sides |
| 53 | Supplying and erecting fencing of section having size 2450 mm in height fromground level and 1200 mm width with angle iron frame work erected in CCfoundation and painted complete as per specification no SS-AS/FSG |
| 54 | Providing printed instruction chart for treating persons suffering fromelectric shock, printed in English & Marathi and duly laminated complete. |
| 55 | Providing pair of duly tested rubber hand gloves as per IS :47705 suitablefor working up to 22 kV supply complete. |
| 56 | Supplying standard first aid box with necessary antiseptic cream, medicine foruse on wounds due burn, crepe bandage, gauge bandage, medicated ready to usebandage (Band-Aid) adhesive tape for medicinal use, scissors, anti-septic solution,etc. (All above contents shall be of standard makes) |
| 57 | Supplying and fixing PVC synthetic elastomer electrically insulating matwith class A insulation conforming to IS: 15652 – 2006 having 2 mm thicknessup to 3.3 kV |
| 58 | Transportation of 11/22 kV transformer up to 315 kVA without loading &unloading (for handing over to section store/ repair works only) |
| 59 | Dismantling the existing distribution transformer of any capacity from theplinth / foundation safely without any damages. |
| 60 | Dismantling existing pole mounted distribution transformer safely withoutany damages. |
| 61 | Providing and maintaining distribution transformer 11kV / 22 kV on HV side& 415 V on LV side from 63 to 200 kVA Capacity Indoor/outdoor type as perIS 1180 for ten days on hired basis. Please Enable Macros to View BoQ information |