| 1 | Dismantling of Flexible PavementsDismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202By By Manual MeansBituminous Courses |
| 2 | Dismantling of Flexible PavementsDismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202By By Manual MeansGranular Courses |
| 3 | Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per MoRTH Specification Clause 202.Manual MeansCement Concrete |
| 4 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per MoRTH Specification Clause 202..Rubble Stone Masonry in Cement Mortar |
| 5 | Dismantling of Cement Concrete Pavements as per MoRTH Specification Clause 202.Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately |
| 6 | Stone crusher (Integrated) of 200 TPH Crushing of Cement concrete Pavement Dismantled Materials on Site &Building Rubbish Stone metal etc. |
| 7 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 |
| 8 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils |
| 9 | Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete.Earth, Sand, Lime, Morrum manure or sludge |
| 10 | Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per MoRD Specification Clause 303.5.2. |
| 11 | Backfilling behind abutment, wingwall and returnwall complete as per drawings & MoRTH specification Clause 304.3.7 & 2204.6 Sandy material |
| 12 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 Lead up to 50 Km. |
| 13 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406.By Mechanical Means with all lead |
| 14 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.90-1.20 kg/sqm using mechanical means as per MoRTH Specification Clause 502 |
| 15 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503. |
| 16 | Providing and applying tack coat with Bitumen VG-10 using bitumen pressure distributor at the rate of 0.40 to 0.50 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per MoRD Specification Clause 503 and IRC-16-2008. |
| 17 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects for Grading-I ( 19 mm nominal size ) Bitumen (VG-30) |
| 18 | Marking Centre Line and stop lines etc. on road as per IRC pattern with thermoplastic paint of approved quality and make with 8% glass beads laid on the road surface at temperature 160\\" C with a special applicator machine complete with a special applicator machine complete with labour material and traffic diversion arrangements. |
| 19 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). |
| 20 | Providing, lowering, laying in trenches, aligning, fixing in position and jointing Ductile Iron (DI) ISI marked K-7 grade S&S pipes as per IS:8329-2000 (amended up to date), with internal High Alumina Cement (HAC) mortar lining for gravity sewer network with rubber ring (EPDM) joints as per IS: 5382-1985 (excluding special accessories) complete including all material, labour, hydraulic testing and commissioning as per technical specifications and as per direction of Engineer. 100 MM Dia |
| 21 | Supply of ‘L’ type Bollard made out of 1.25 mm thick M.S. sheet height 134 cm, welded in circular type ring section having upper dia 15 cm. and lower dia 21 cm with another attachment of 15x15 cm circular section with 15 cm. face plate and hold fast at bottom, whole body is processed in white stoving enamel and red reflective 3 hands, each of 7.5 cm end one reflective sheet of 15 cm. dia provided to it complete in all respect. |
| 22 | Supply of Hazard Marker made out of 2 mm thick M.S. sheet size 300x300x3 mm framed with angle iron 25x25x3 mm and fixed on channel posts 75x40x6 mm and hold fast at bottom whole body is painted in white stoving enamel and 6 Nos., 5 cm dia reflective sheet on white reflective background with additional border of 1.25 cm all arount it. |
| 23 | Supplying and Fixing of Cat’s Eye made of aluminium alloy size 75x100x22 mm having 21 biconvex lenses embedded in circular disk of ABS plastic on each side. |
| 24 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 25 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:4 ( 1-Cement : 4-Sand). |
| 26 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:6 ( 1-Cement : 6-Sand). |
| 27 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) |
| 28 | Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide |
| 29 | Extra if square,rectangular hollow tubelar sections are used or grill made by flats only |
| 30 | Finishing wall with water proofing cement paint of approved brand and manufacture and or required shade to give an even shade including all scaffolding: New work (Two or more coats applied @ 3.84 kg/10 sqm). |
| 31 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work |
| 32 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish :20mm thick . |
| 33 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M20 grade Nominal Mix 1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). |
| 34 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix |
| 35 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. |
| 36 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786)Thermo-mechanically Treated bars (Conforming of relevent IS code) |
| 37 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 coarse sand ) including making joints with without grooves (thickness of joints except at sharp curve shall not to more than 5mm) including making drainage opening wherever required complete including painting etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineerin- charge). |
| 38 | Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc.Good soil of earth |
| 39 | Providing and laying Precast reinforced cement concrete Box culvert section of M-40 grade designed for 'AA' class loading as per IRC specifications including to effect of impact, EQ etc. complete on firm base of 200mm thick lean concrete of M-10 grade with aggregate of size 40mm nominal of following internal size the work includes required safety measures cost of design of RCC Precast Box and its proof checking from IIT / NIT / Government Engineer College complete in all respect as per specificationsSize 1.00 M x 1.00 M |
| 40 | Providing and fixing of Reinforced Ferro cement Drain cover designed for class \\"AA\\" loading duly marked on cover with adequate steel reinforcement having thickness 75 mm to 150 mm anti- corrosive bitumen painted M.S. plate Rim and on M.S. lifting hooks admixture like plasticizer bond improving compound shrinkage resistance compound abrasion resistant complete as per approved design etc. for drain Opeining Size 701 to 1200 mm Standard Drain Cover Size 1500mm x 600mm x 125mm |
| 41 | Supply & fixing of Fiber reinforced Ferro cement drain cover (light duty) designed for side drain for class \\"B\\" Road loading duly marked on cover with adequate steel reinforcement having thickness 50 mm to 75 mm anti corrosive bitumen painted M.S. plate Rim and on M.S. lifting hooks additives & admixture like plasticizer shrinkage resistance compound abrasion resistant as per approved drawing and design complete in all respect. for drain Opeining Size 451 to 700 mm Standard Drain Cover Size 1000mm x 900mm x 60mm |
| 42 | Supply & fixing of M-20 grade precast cement concrete Kerb or Dand upto 60 cm length over 20 mm thick base of cement mortar 1:6 including jointing earth work, pointing & jointing with cement mortar 1:4 of size(20 x 25) x 30 cm |
| 43 | Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and MoRTH Specification Clause 801 |
| 44 | Providing and fixing designer cement concrete polished tiles over 20mm average thick base of CM 1 :4 (1 Cement : 4 sand) jointing with cement mortar 1 :2 ( 1cement : 2 sand) with pigment to match the shade of the tiles having minimum thickness of 25mm complete with all respect. ( as per IS 1237:2012) |
| 45 | Brick masonry with F.P.S. bricks of class designation 75 in foundation and plinth with bricks Cement mortar 1 : 4 (1 cement : 4 coarse sand) |
| 46 | Half brick masonry in foundation & plinth using bricks of designation 75Cement mortar 1 : 4 (1 cement : 4 coarse sand) |
| 47 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish :12mm thick . |
| 48 | Raising precast circular manhole cover and frame by taking out existing precast frame and cover, providing and fixing precast SFRC circular spacer of required height, re-fixing existing manhole cover frame and cover with cement sand mortar (1:3), including making good the damage, complete as directed by Engineer. |
| 49 | Supply of dry manure including loading unloading,transportation & stacking at site.Farm yard manure(organic) |
| 50 | Supply of Chemical Fertilizers at store in bags weighing not less than 50 kg each including loading unloading & transportation DAP |
| 51 | Supply of insecticides & Pesticides at store in dust/liquid form complete.Methyl Prathion 2% |
| 52 | Digging pits in ordinary soil and refilling the same with the excavated earth mixed with manure in the ratio of 2:1 by volume ( 2parts of stacked volume of earth after reduction by 20% 1 part of stacked volume of manure after reduction by 8%) flooding wit |
| 53 | Supply of different varieties of bougainvillea in ply bags/earthen pot according to height growth and age of plant at site including loading unloading and transportation etc. complete Different varieties of bougainvillea 600mm to 900mm |
| 54 | Hedges of various varietiesTecomaGoudichoudi in P.B(9”X11”) - 2’ |
| 55 | Different varieties of Shady plantsHeight 7’-8’ (18”x18”)Many Branches state steam |
| 56 | Planting of trees /shrubs/ hedge and climbers plants at desired distance in row and watering |
| 57 | Maintenace of Plants by the contractor including of pits/bids watering preparation of Thavala Hoeing weeding etc. & application of insecticides etc. & security if the plant die during maintenance contractor has to replace same height plant at his own cost. |
| 58 | Full Depth Reclamation (FDR) Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/base course up to the required depth by cold in-situ recycling using cement and chemical additives / otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37- 2018 and IRC SP 89 (part II) 2018.Ordinary Portland Cement 43 grade confirming to IS:8112 @ rate of minimum 4.0 - 5.0% and IRC Accredited Commercial Chemical Stabilizer (CCS) additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer / reclaimer of working width of 2.4 m and with minimum engine horse power of 440 kw with a variable working depth up to 50 cm. The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC-SP- 72-2015,IRC 37-2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverizing of damaged asphalt pavement / soil/ aggregates / soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fitted on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized subbase/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP- 72-2015, IRC-37-2018 The gradation mixes, materials, durability aspects (wet-dry cycles) of stabilized sub base/base and environment safety requirements should be satisfied as per IRC-SP-72-2015 IRC 37-2018 and IRC SP 89 (part II)2018. The train of equipments to be used are binder spreader water Tanker- Additive Truck Recycler- Pad foot Roller (20 Tonne) + Single Drum Compactor- Grader- Tandom Roller- Pneumatic Tyre Roller (20Tonne) |
| 59 | SAMI Layer Providing and laying Stress Absorbing Membrane Interlayer (SAMI)/ Paving Fabric Beneath a Pavement Overlay as per MoRTH Specification clause 708 with physical requirements as per table: 700-16 over a tack coat of paving grade Bitumen of VG 10, laid @ 1 kg/ sqm over thoroughly cleaned and repaired surface to provide a water resistant membrane and crack retarding layer. Paving fabric to be free of wrinkling and folding and to be laid before cooling of tack coat, brooming and rolling of surface with pneumatic roller to maximize paving fabric contact with pavement surface. (Tack coat to be paid separetely). Please Enable Macros to View BoQ information |