| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Superintending Engineer, EDC, Gauriganj Name of Work: Line related different work of Deposit Scheme/ Vidhayak Nidhi/Sansad Nidhi in the area of EDSD-Jagdishpur under EDD-Jagdishpur, Distt. Amethi. (Running Contract) Tender No: 68/E.D.C.(G)/2025-26 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Work Description Item Code / Make Quantity Unit Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category PERIOD IN month TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT Without Taxes TOTAL AMOUNT In Words |
| 2 | Loading, carriage of following items from Store Centre, Gauriganj/Sultanpur to dump store including unloading and proper stacking (distance 0-70 km.) (Sl. No. 2 - 18) |
| 3 | STP/PCC pole. |
| 4 | ACSR Weasel Conductor |
| 5 | V type X Arm |
| 6 | 25/63/100 KVA Transformer |
| 7 | Pilfer proof metering cubical |
| 8 | 11 KV cable box indoor/outdoor |
| 9 | 11 KV pin/disk insulator with nuts & bolts |
| 10 | Top Channel. |
| 11 | G.I. wire |
| 12 | Stay Set complete |
| 13 | Earthing complete |
| 14 | Dropper Angle |
| 15 | T-off channel |
| 16 | S/S base angle |
| 17 | L.T. ABC Three phase/Single Phase |
| 18 | Other Line Materials |
| 19 | Dragging of STP/PCC Pole from dump store to pit site. |
| 20 | Digging of pits up to the depth of 1650/2200 mm. as per site requirement. Fabrication & erection of single pole support on PCC/STP pole support including digging of pit & fixing of all accessories and clamps as per RESPO norms. |
| 21 | Digging of pits up to the depth of 1650/2200 mm. as per site requirement.Fabrication & erection of double pole support on P.C.C./STP pole including digging of pit & fixing of all accessories and clamps as per RESPO norms. |
| 22 | Grouting of STP/PCC pole in ratio 1:4:8 with cement stone ballast, coarse sand and plinthing 300 mm above ground level as well as muffing of plinth. |
| 23 | Spreading, laying & stringing of ACSR weasel conductor for construction of 11 KV line as per RESPO norms. |
| 24 | Spreading, Laying & Stringinging of AB cable Three phase/Single Phase |
| 25 | Ordinary earthing by 11 KV MS earth rod 2500 mm long as per RESPO norm. |
| 26 | Concreting & nuzzling of stay complete including fixing of necessary clamps with the help of nuts & bolts other accessorise required for completing the work as well as its grouting by civil material viz. Sand, stone ballast and cement. The contractor will provide all civil material as well as stay insulator |
| 27 | Guarding of line as per RSPO norms. |
| 28 | Installation of 25/63/100 KVA Transformer on newly constructed Double/single pole making proper connections from 11 KV system and proper testing as well as commissioning of Transformer. |
| 29 | Installation and commissioing of pilfer proof metering cubical in metering room. |
| 30 | Installation of 11 KV indoor/outdoor cable Box as per RESPO norms. |
| 31 | Tree cutting for clearance of 11 KV/LT line. |
| 32 | Providing and fixing of Holding Clamp for PCC/ST Pole (Cross Arm) |
| 33 | Providing and fixing of Holding Clamp for top channel (STP/PCC) |
| 34 | Providing and fixing of F Braket |
| 35 | Providing and fixing LT shakle Insulator on PCC/ST Pole |
| 36 | Providing and fixing Stay Insulator on PCC/ST Pole |
| 37 | Dismentaling of 11 KV/33 KV/LT Line |
| 38 | Note: Any quantity of item from sl no. 1 to sl no. 37 may vary to any limit within the financial value of agreement against this tender. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |