| 1 | Safe carriage of following material from ESC Daliganj/Chinahut to JE Dump store including loading unloading after proper stacking of material |
| 2 | Line material |
| 3 | ST pole 11/9 Mtr |
| 4 | PCC Pole 8.5 Mtr |
| 5 | 11/0.4 25/63/100 KV T/F KVA |
| 6 | 11/0.4KV 250/400KVA T/F |
| 7 | 11KV XLPE Cable |
| 8 | 33KV XLPE Cable |
| 9 | LT Cable 1x630/400/240/3.5x240/400mmsq |
| 10 | ACSR Rabbit/dog/Racoon/Weasel conductor |
| 11 | ABC Cable 3x120/95/50/25sqmm |
| 12 | 11KV Pilfer resistance metering cubical |
| 13 | 11KV Pole mounted CT/PT |
| 14 | 33 KV Pole mounted CT/PT |
| 15 | M S Earthing Rod 7 |
| 16 | 33 KV Pin insulator composite |
| 17 | Safe carriage of following material from JE Dump store to site including loading unloading |
| 18 | 11/9/ ST /8.5 Mtr Long PCC Pole |
| 19 | 11/0.4 25/63/100 KV T/F KVA |
| 20 | 11/0.4KV 250/400KVA T/F |
| 21 | 11KV XLPE Cable |
| 22 | 33KV XLPE Cable |
| 23 | LT Cable 1x630/400/240/3.5x240/400mmsq |
| 24 | ACSR Rabbit/dog/Racoon/Weasel conductor |
| 25 | ABC Cable 3x120/95/50/25sqmm |
| 26 | 11KV Pilfer resistance metering cubical |
| 27 | 11KV Pole mounted CT/PT |
| 28 | 33KV Pole mounted CT/PT |
| 29 | Fabrication errection of11KV sub station type double pole on ST pole along with fixing of necessary clamp ,Accessories required including supply and fixing of MS channel on top dropper with arrangement of fixing of 3 Nos pin insulator as per respo specification |
| 30 | Fabrication errection of 33KVsub station double pole on ST pole along with fixing of necessary clamp ,accessories required including supply and fixing of MS channel on top dropper Base angle /channel for for mounting of CT/PT with as per respo specification |
| 31 | Errection and grouting of 9/11 mtr long ST pole with fixing of necessary items, Such as V-type X-arm,F-bracket,11KV Pin/Dic insulator, guarding angle with nut and bolt its ramming as per Respo Specification. |
| 32 | Prepare proper space for construction of Plinth |
| 33 | Construction of T/F plinth of size 2x2x1.2 Mtr with first class bricks and massonary work in the ratio 1:4cement and course sand with RCC Top 1:2:2 cement sand and course sand stone gritt with MS bar and MS channel for resting of T/F |
| 34 | Fabrication and fixing of wiremesh fencing of 11/0.4KV S/S made as per require-ment 2mtr height 45x45x5 mm angle frame and 1 No horizontal runner by 40x5 mm MS flat then welding of wiremesh on it 50x25mm made of 12 SWG ,diagonal bracing of all the frame panel welded with MS flat 25x3mm support,groutin properly by cement concrete and course sand |
| 35 | Painting of wiremesh Fencing with 2 coat of red oxide and 2 coat of enamel Paint |
| 36 | Fabrication and fixing of DP box stand made of MS Angle ,grouting and plinthing of the same all material provided by contractor |
| 37 | Fabrication and fixing of Metalic Distribution Pillar box on stand with Nut bolt made of 20 SWG BP Sheet with door 18 SWG BP Sheet ,with fixing of 2 Nos MS Angle for mounting of Fuse unit |
| 38 | Fabrication and fixing of Henlay type Tailless Fuse Unit 500 Amp 650 Volts |
| 39 | Fabrication and Fixing of Electrolytic copper Bus bar of Size 50x6x750mm |
| 40 | Fabrication and Fixing of Almunium Bus bar of Size 50x10x750mm |
| 41 | Chemical type earthling by digging of pit fixing of electrod earthing rod filling of Bentonite powder around the rod and water ,connect the GI Strip 32x5 mm with wiremesh fencing and DP Box |
| 42 | Digging of pit errection of 8.5 Mtr Long PCC pole with fixing of neccessory items, such as v-type x –arm,F-bracket, 11KV Pin/Dic insulator guard angle as per Respo, refilling of earth and proper Ramming of earth |
| 43 | Providing and fixing of 11KV DO Fuse set alont with clamp and nut bolt |
| 44 | Laying of 11 KV cable3 x/3570/120/185 sqmm in pukka road by drilling method |
| 45 | Laying of 11 KV cable Double Circuit 3 x/3570/120/185 sqmm in pukka road by drilling method |
| 46 | Laying of 11 KV cable3 x/3570/120/185 sqmm in pukka road/kucchRoad by digging of trench upto 1 Mtr Deep 0.6 Mtr width laying of cable boxing with bricks and sand ,refilling of earth and proper ramming |
| 47 | Laying of 11 KV cable3 x/3570/120/185 sqmm in pukka road by digging of trench upto 1 Mtr deep x0.60 Mtr width putting cable boxing with 1stclass briks and sand refilling of earth Double Circuit |
| 48 | Laying of 11 KV cable3 x/3570/120/185 sqmm in pukka road/kucch Road by digging of trench upto 1 Mtr Deep 0.6 Mtr width laying of cable in HDPE Pipe 140 mm Dia Pipe boxing with bricks and sand ,refilling of earth and proper ramming |
| 49 | Laying of 33 KV cable in pukka road/kuccha Road by digging of trench upto 1 Mtr Deep 0.6 Mtr width laying of cable boxing with bricks and sand ,refilling of earth and proper ramming |
| 50 | Hoisting of 11KV cable will be passed through GI pipe required size duly clamped with pole at the bottom, middle and top of the pole all material provided by contractor, GI Pipe provide by Department |
| 51 | Hoisting of 33KV cable will be passed through GI pipe required size duly clamped with pole at the bottom ,middle and top of the pole , Cable ang GI Pipe provided by Department |
| 52 | High pressure testing of 11KV Cable by high pressure equipment |
| 53 | Proper Jumpering of 11KV Cable on tapping point |
| 54 | Laying of LT Cable |
| 55 | Hoisting of LT cable will be passed through GI pipe required size duly clamped with pole at the bottom ,middle and top of the pole only cable and GI Pipe supplied by department |
| 56 | Proper Jumpering with existing LT Line with PVC Cable and Al Lugs |
| 57 | Errection and commissioning of AB Conductor of size 3x120/95/50/25sqmm |
| 58 | Laying stringing and sagging of 3Phase 3 wire 11KV line on ACSR Weasel/Rabbit /Racoon /Dog conductor as per Respo |
| 59 | Ordinary Earthing by MS Earth rod2500 mm long all material provided by department |
| 60 | Ordinary Earthing by MS Earth rod2500 mm long all material provided by Contractor |
| 61 | Grouting binding nozzelling of stay set complete including fixing of necessary clamps accessories stay set and stay wire provided by department |
| 62 | Grouting binding nozzelling of stay set complete including fixing of necessary clamps accessories stay set and stay wire provided by Contractor |
| 63 | Installation of 11KV CT/PT on double pole connected with metering Box along with providing and fixing of all accessories such as S/S base ,MS Flat ,clamps, nut and bolts, |
| 64 | Proper jumpering of 11KV Incoming and outgoing Cable with Pole Mounted unit |
| 65 | Installation of 33KV CT/PT on double pole connected with metering Box along with providing and fixing of all the ,clamps,nut and bolts, |
| 66 | Proper jumpering of 33KV Incoming and outgoing Cable with Pole Mounted unit |
| 67 | Dragging of pilfer metering cubical inside the metering room its installation and commissioning |
| 68 | Earthing of Pipe type with 60 feet deep boring and providing jindal make pipe \\"B\\" class 1.25\\" dia and GI strip 25x5 6mtr long attached with clamps and GI pipe |
| 69 | Safe installation of 11/0.4 25/63/100KV T/F on double pole by providing and fixing of all accessories along with making HT LT Connections |
| 70 | .Installation and commissioning of 250/400KVA T/F on plinth including its connection in between 11KV and LT line mounting of Copper L-piece ,providing Al.lugs of suitable size (only T/F provide by Department 5000 |
| 71 | Fabrication of LT Bus bar and fixing on consumer premises |
| 72 | Fabrication and fixing of 11KV TPMO Set (AB Switch with GI Pipe) |
| 73 | Fabrication and fixing of HT Cable stand with the help of 65x65x6mm MS angle 3.5 mtr high above ground level and grouting properly |
| 74 | Dismantling of 11KV/LT line from existing pole and disconnect all the cables |
| 75 | Dismantling of all the fitting from Four Pole |
| 76 | Dismantling of all the fitting from Double Pole |
| 77 | Dismantling of all the fitting from Pole |
| 78 | Dismantling of ST/PCC/Rail pole and its carriage back to JE Dump store |
| 79 | Grouting of pole by cement course sand and stone gritt |
| 80 | Painting of ST pole by Al paint and post office red paint |
| 81 | Plinthing of ST Pole by cement stone gritt and course sand |
| 82 | Supply and fixing of 2.5mm Multistring PVC Cpper wire |
| 83 | Cutting of tree Branches for clearance of line |
| 84 | Supply and fixing of 150mm GI pipe |
| 85 | Supply and fixing of 75 mm GI pipe |
| 86 | Supply and fixing of Danger Board with clamp |
| 87 | Dismantling of Plinth/Double pole mounted T/F and its carriage up to JE Dump store |
| 88 | Supply and fixing of Interlocking Tiles around the T/f Plinth in Fencing area GST will be paid extra as per rule. Please Enable Macros to View BoQ information |