Name of Work:- Various defects on engineering defects
Sl. No.
Item Description
1
Various defects on enggineering equipment.
2
E-926: The following valves of AC system, G/B system, bilge system, Bilge & Ballast system are not holding pressure due to defective valve lids/seat. Valve to be overhauled and pressure tested prior Fitment up to test pressure. In way job includes removal of valves with associated system. S.No. Description Size(mm) Test Pressure(Bar)(i) AC condenser inlet SDNR Valve- 01 No 100 06(ii) Ref plant condenser S/W outlet globe valve- 01 No 40 06(iii) Fin compt eductor bilge out SDNR Valve- 01 No 80 06(iv) Fin compt butterfly valve- 03 No’s 65 10(v) Fin educator over board SDNR Valve- 01 No 65 10(vi) Port & stbd gear box motor driven S/W pump SDNR valve- 02 No’s 65 06(vii) Port & stbd gear box gear driven S/W pump SDNR valve- 02 No’s 65 06(viii) Fwd Bilge & ballast pump discharge SDNR valve-01 & de-ballasting butterfly valve- 01 No 65 10(ix) Fwd E/R bilge out valve-01 No 40 06 Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.