| 1 | Dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead.Left side from Singhdwar to Mochi Sahi Chhak |
| 2 | Right side from Singhdwar to Mochi Sahi Chhak |
| 3 | Supplying of all materials, labour, T&P for earthwork in excavation of foundation in ordinary soil of soil including dressing and levelling the bed with cost and conveyance of all materials, labour royalty T&P etc all complete as per the direction of Engineer in charge.Left side from Singhdwar to Mochi Sahi Chhak |
| 4 | Right side from Singhdwar to Mochi Sahi Chhak |
| 5 | Transportation of excavated earth and dismantling debris by mechanical means including loading and Unloading within 5 KM lead as per direction of Engineer in charge.Left side from Singhdwar to Mochi Sahi Chhak |
| 6 | Right side from Singhdwar to Mochi Sahi Chhak |
| 7 | Providing , laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with pavers in sub-base/base course on well prepared surface and copacting with vibratory roller to achive the desired density as per Clause 406 of MoSRT&H Specifications for Road works.Page-166, Item no.-42Left side from Singhdwar to Mochi Sahi ChhakRight side from Singhdwar to Mochi Sahi Chhak |
| 8 | Supplying and filling in foundation, trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. in depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as per direction by the Engineer in charge.Left side from Singhdwar to Mochi Sahi Chhak |
| 9 | Right side from Singhdwar to Mochi Sahi Chhak |
| 10 | C.C. (1:2:4)work with 12 mm black hard granite (crusherbroken) stone chips including cost , conveyance, taxes, royalities etc. complete as per direction of Engineer in charge.Drain Bed |
| 11 | R.C.C. work of M-25 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including hoisting and laying and cost of materials all labours conveyance Royalty with DMF and EMF and cost of water for curring T&P etc. all complete.WallSlab |
| 12 | Drain Bed Wall |
| 13 | Straightening cutting, bending bent up of M.S. rods / Tor steels, including cranking, hooking, welding or jointing the M.S. rods or tor confirming to I.S. 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C. works including cost, conveyance and taxes of M.S. rods or tor steel and binding wires of 18 to 20 gauge and cost of all labour with all T&P required for the work etc. complete as directed by the Engineer- in-Charge. |
| 14 | Dewatering by Engaging pumpset (5HP) withDiesel engine |
| 15 | Centering and shuttering and removal of form work for : Foundations, footings, bases for columns including cost of materials labours etc. complete |
| 16 | 6mm. thick cement plaster (1:4) on brick work including cost of materials labour royality all taxes of materals etc, complete(Ground Floor) |
| 17 | Supplying, stitching, laying of sand bags in layer for diversion of flow of drain water. |
| 18 | Supplying fitting and fixing of GI Gratting including cost of materials all labours etc, complete. |
| 19 | Display board with photograph Please Enable Macros to View BoQ information |