| 1 | (Erection/Labour Part HT Line ) |
| 2 | Erection of S/T pole 9 mtr long,(Double pole structure) with RCC muff Including digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, X-bracing set, X-arms, Fixing of insulators, X-arms, X- bracing set, fixing of barbed wire, Danger plate, filling of pit & ramming and painting of pole complete in all respects(C.C. 1:3:6 for muffing will be provided by the contractor). |
| 3 | Erection of HT earthing set comprising digging of pit, fixing of GI wire to the earth system,and filling of pit complete in all respects. |
| 4 | Erection of stay set HT line, comprising digging of pit, fixing of stay rod, filling of pit, Nozzeling and tightining complete in all respects. |
| 5 | Sagging of conductor 1 KM single GI wire, , comprising laying of Conductor, stringing & sagging, binding with insulator complete in all respects. |
| 6 | Erection of H T line with ACSR 6/1/4.72 (100 mm²) mm such as stringing, tensioning and sagging,jointing and fastening . |
| 7 | Mannual carriage of complete Material of H T line from road side to site of work |
| 8 | Transportation Charges for complete Material of H T line |
| 9 | (Supply Part HT Line) |
| 10 | Muffs (2000mm) with concerete filling |
| 11 | Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/c tolerance of 100 mm either side) x 8 structure (Run Through) |
| 12 | Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures (Run Through) |
| 13 | Pole Top Bracket [MSCI:100x50x6 mm- 100 mm] (Run Through) |
| 14 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure (Run Through) |
| 15 | Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm x 2 No. (Dead End Structure) |
| 16 | X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2 No.(Dead End Structure) |
| 17 | X-Arm (Horizontal) - MS Channel Iron C type: 100X50x6, Length: 2340 mm x 2 No.] ∆ Formation (Dead End Structure) |
| 18 | Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps, Straight stapples & Bend Stapples etc.) x (3 No. conductors) x (2 No. sides) (Dead End Structure) |
| 19 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure (Dead End Structure) |
| 20 | Stay set complete |
| 21 | Stay wire |
| 22 | HT Earthing set complete |
| 23 | Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 3% (Sag, Earthing, Cross lacing above road and wastage)} @ 0.102 kg/m |
| 24 | Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro' structure: 2 No ] |
| 25 | Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro' structure: 2 No] |
| 26 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] Please Enable Macros to View BoQ information |