|
| 1 | Scraping of old white or colour wash including refusal of dismantled material up to 60.0mtr distance as per direction by engg-in-charge. |
| 2 | Dismantling of existing plaster including disposal of refuse as directed by engg. i/c. within a distance of 60mtr. |
| 3 | Earth work in Excavation in trenches for foundations pipes cables etc in ordinary soil (loam clay or sand) including lift up to |
| 4 | Providing and Laying Cement concrete (1:6:12, 1cement: 6 coarse sand: 12 Brick ballast nominal size 40 mm ) in all completion of work. In foundation and floor . |
| 5 | Class-150 brick work in 1:4 cement and corse sand mortar of 1.25 fineless modulus mortar in foundation and plinth including supply of all materials, labour, tools & plants etc, required for proper completion of work. |
| 6 | Class-150 brick work supper structure above plinth lebel upto floor to lexle (upto two story) including necessary cutting and molding of brick work . |
| 7 | prooviding and fixing hand rail (M.S Tube )of approved size by welding etc all ladger railing balcony railing etc all complation of work |
| 8 | Providing and laying of stone ballast with stone dust including water allowance for proper consolidation with hand ramming including labour T&P etc all complete. |
| 9 | Providing and laying of 80mm thick rubbermoulded interlocking tiles over 25-40mm thick local sand etc all complete. |
| 10 | 12mm thick cement plaster in single coat on fair side in 1:4 cement, fine sand etc all complete. |
| 11 | Finishing walls with water proofing cement paint in two coats of approved quality with one priming coat in even shade including labour T&P etc all complete. |
| 12 | Painting or varnishing on iron work in large area with one priming coat and two coat of ready mix enamel paint of approved quality including supply of all material, labour tandP etc all complete. |
| 13 | Devlopment of lawn by doubling slection no-1 Grass incl. All complition of work. |
| 14 | Devlopment of hedge by doubling slection no-1 Grass incl. All complition of work. |
| 15 | One Year meintainance work of Hedge including all complection of work |
| 16 | One Year meintainance work of lawn including all complection of work |
| 17 | bottel palm plant includung earth work labour All complition of work. |
| 18 | pondula plant includung earth work labour All complition of work. |
| 19 | Ficus plant includung earth work labour All complition of work. |
| 20 | GST 18% Please Enable Macros to View BoQ information |