| 1 | Centering and shuttering including strutting, propping etc. and removal of form for : Edges of slabs and breaks in floors and walls Under 20 cm wide |
| 2 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 3 | Mild steel and Medium Tensile steel bars |
| 4 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 5 | Providing and fixing in position 12mm thick bitumen impregnated fiber board conforming to IS: 1838, including cost of primer, sealing compound Grade-A in expansion joints. |
| 6 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.Note: Payment will be made as per weight slip issued by authorised MCD dumping ground after dumping of malba. Processing fees at prescribed rate of authorised MCD dumping ground will be submitted by the agency & shall be reimbursed by the department on production of receipt in original. |
| 7 | Providing and fixing Glow studs of size 100x20 mm made of heavy duty body shall be moulded ASA (Acrylic styrene Acryloretrite ) or HIP (High impact polystyrene) or ABS having electronically welded micro- prismatic lens with abrasion resistant coating as approved by Engineer in charge. The glow stud shall support a load of 13635 kg tested in accordance with ASTM D4280. The slope of retro- reflective surface shall be 35 (+/-5) degress to base .The reflective panels on both sides with at least 12 cm of reflective area up each side. The luminance intensity should be as per the specification and shall be tested as described in ASTM I: 809 as recommended in BS: 873 part 4 : 1973. The studs shall be fixed to the Road surface using the adhesive conforming to IS, as per procedure recommended by the manufacturer complete and as per direction of Engineer-in-charge. |
| 8 | Providing and applying 2.5 mm thick road marking strips (retro-reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. |
| 9 | Construction of dry lean cement concrete sub base over a prepared sub-grade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per specifications, cement content not to be less than 150 Kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, for all leads & lifts, laid with a mechanical paver, compacting with 8-10 tonne vibratory roller, finishing and curing etc. complete as per direction of Engineer-in-charge. |
| 10 | Providing & Applying weather proof sealant on outer joints of approved make confirming to IS & directed by Engineer-in-charge. Sealant 25mmx10mm at joints |
| 11 | Modified Estimated cost after using correction factor on DSR-2023 on account of GST @ 0.973 |
| 12 | Add Cost Index @3% |
| 13 | Providing and laying 125 micron thick PVC sheet (Overlaps at joints of PVC sheet should be 100mm wide and pasted to each other with bitumen @ 1.7kg /Sqm) |
| 14 | Providing and fixing approved quality Poly propylene Sleeves over dowel bars at expansion joints in cement concrete pavement to ensure free movement of slab, reduse stress concentration and prevent cracking ,complete as per standard specification and directions of Engineer-in-charge |
| 15 | Demolishing W.M.M./ bituminous surface manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in-Charge. |
| 16 | Providing and laying C.C. pavement of mix M-35 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. including the cost of steel formwork with sturdy channel, RS joist section etc (Panel Shuttering) also removal of shuttering after vaccume dewatering process all complete as per specifications and directions of Engineer-in- charge.(Note:- Cement content considered in this item is @ 370 kg/cum. Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. In case of less cement, recovery shall be made as per the item). Please Enable Macros to View BoQ information |