| 1 | (Erection/Labour Part) of HT Line Erection of Steel Tubular Pole 9/10/11 Mtrs.Long.(Single pole Str.) new /tilted:- Digging of pit, Drilling of Holes in Poles, Fixing of Clamp, etc, Erection of Pole, Filling of pit ramming and painting of pole. Complete in all respect as directed by the Engineer-In-Charge including all types of risk & incedental at site |
| 2 | Erection of Stay Set (H.T) new/ uprooted:-Digging of pit , Fixing of Stay Rod, Filling of pit and Nozzling and tighting Complete in all respect as directed by the Engineer-In-Charge including all types of risk & incedental at site |
| 3 | Erection of 11 KV HT Line with ACSR/AAAC 30 mm2:- Re-Stringing and re-Sagging and Binding with Insulator Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. |
| 4 | Erection of 11 KV HT Line with ACSR/AAAC 50/55 mm2:- Re-Stringing and re-Sagging and Binding with Insulator Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. |
| 5 | Manual carriage of 25 KVA, 11/0.4 KV Transformer from road head to site of work with average lead 1.5 KM & carriage of damaged from site of work to road head with average lead 1.5 KM (1.5KM*2=3 KM) |
| 6 | Materials Part:-Prov.11 KV Pin Insulators (Porcelain,12 KV.10 KN) for double pole Str. |
| 7 | Prov.H.T.Stay Set Complete in all respects |
| 8 | Prov.Stay Wire (7/3.15 mm) (10.0 Kg Per Stay Set) |
| 9 | Prov.Nuts & Bolts of various Sizes(Galvanised)/Coated) 16 mm Φ or more ( With flat and spring washer) |
| 10 | \\"Erection Part LT\\":- Erection of Steel Tubular Pole L.T.:- Digging of Pit , Drilling of holes in Pole X-Arm , Erection of Pole , Erection of X-Arm , Shackle Insulator,Painting of Pole and Filling of Pit and Ramming Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. |
| 11 | Erection of L.T.Stay Set.:- Digging of Pit , Fixing of Stay road ,Nozzeling & tightening Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. |
| 12 | Sagging of Conductor (50 mm²) L.T.Line :- Laying of Conductor , Stringing and Sagging and Binding with Insulator Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. |
| 13 | Manual carriage of Stay set with stay wire (1 set ) from road head to site of work with average lead 2km |
| 14 | Material part:-Prov.L.T.Stay Set Complete in all respects |
| 15 | Prov.Stay Wire (7/3.15 mm) (6.00 Kg Per Stay Set) |
| 16 | Shackle Insulator with D-Iron assembly |
| 17 | Prov. Nuts & Bolts of various Sizes(Galvanised)/Coated) 16 mm Φ or more ( With flat and spring washer) Please Enable Macros to View BoQ information |