|
| 1 | Dismantling and Sacrifying of road surface including stacking of serviceable material within 50Mtr lead WBM |
| 2 | Earth work in excavation by manual means trenches for foundations drains, pipes and cables (not exceeding 1.5m.in width) and for shafts, wells cesspits and the like not exceeding 10 Sqm on plan, including dressing of side and ramming of bottoms lift upto 1.5 m including getting out excavated earth and disposal of surplus excavated earth by directed All kinds of Soil |
| 3 | Earth work in excavation by mechanical means trenches for foundations drains, pipes and cables (not exceeding 1.5m.in width) and for shafts, wells cesspits and the like not exceeding 10 Sqm on plan, including dressing of side and ramming of bottoms lift upto 1.5 m including getting out excavated earth and disposal of surplus excavated earth by directed All kinds of Soil |
| 4 | Providing and laying of stone soling in trenches for drain including manholes. |
| 5 | Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level in:- 1:4:8 (1cement:4coarse sand: 8graded stone aggregate 40mm nominal size) Crushed |
| 6 | Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level in:- 1:3:6 (1cement: 3coarse sand: 6graded stone aggregate 40mm nominal size) Crushed |
| 7 | Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level in:- 1:1.5:3 (1cement: 1.5coarse sand: 3graded stone aggregate 20mm nominal size) Crushed |
| 8 | Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level in:- 1:2:4 (1cement: 2coarse sand: 4graded stone aggregate 20mm nominal size) |
| 9 | Reinforcement for R.C.C. work including straightening cutting bending ,placing in position and binding all complete - |
| 10 | Centring & shuttering including strutting propping etc. & removal of form work for:-a)-vertical wall |
| 11 | Suspended floor |
| 12 | Edges of slab |
| 13 | Carriage of materials by mechanical transport including loading, unloading & stacking from approved source to site of work:- |
| 14 | 40mm Stone Agg, |
| 15 | 20mm N.S. stone agg. |
| 16 | Sand avg. lead of 12 Kms. |
| 17 | Refilling of excavated earth back in trenches plinth, etc. layer not exceeding 20cm in depth, consolidating each layer by ramming and watering complete job. |
| 18 | Disposal of excavated earth at an avg. lead of 500 Mtrs. By mechanical trasnport. |
| 19 | Providing and laying of 300 mm dia NP3/RCC spun pipes into trenches and making of cement joints by uisng 1:2 mix with (1cement:2 sand) including sealing with proper gbaskets complete job.. |
| 20 | Carriage of pipes from factory to site work 300mm dia NP3 RCC at an average lead of 12Km. |
| 21 | Fixing and carriage of manhole covers |
| 22 | Supply of manhole covers to be supplied by the departmental store. 4 [email protected]=Rs13200.00 Please Enable Macros to View BoQ information |