|
| 1 | Rewiring for light point/ fan point/ exhaust fan point/call bell point with 1.5 sq.mm FRLS/HFFR PVCinsulated copper conductor single core cable and 1.5sq.mm FRLS/HFFR PVC insulated copper conductorsingle core cable as earth wire in existing surface/recessed steel/PVC conduit including dismantling asrequired. Group A |
| 2 | Wiring for circuit/ submain wiring alongwith earth wire with the following sizes of FRLS PVC insulated copper conductor, single core cable in surface/ recessed medium class PVC conduit. 2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire |
| 3 | Wiring for circuit/ submain wiring alongwith earth wire with the following sizes of FRLS PVC insulated copper conductor, single core cable in surface/ recessed medium class PVC conduit. 2 X 2.5 sq. mm + 1 X 2.5 sq. mm earth wire |
| 4 | Wiring for circuit/ submain wiring alongwith earth wire with the following sizes of FRLS PVC insulated copper conductor, single core cable in surface/ recessed medium class PVC conduit. 2 X 4 sq. mm + 1 X 4 sq. mm earth wire |
| 5 | Wiring for circuit/ submain wiring alongwith earth wire with the following sizes of FRLS PVC insulated copper conductor, single core cable in surface/ recessed medium class PVC conduit. 4 X 10 sq. mm + 2 X 6 sq. mm earth wire |
| 6 | Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required. 5/6 A switch |
| 7 | Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required. 15/16 A switch |
| 8 | Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required. 3 pin 5/6 A socket outlet |
| 9 | Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required. 6 pin 15/16 A socket outlet |
| 10 | Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required. Bell push |
| 11 | Supplying and fixing two module stepped type electronic fan regulator on the existing modular plate switch box including connections but excluding modular plate etc. as required. |
| 12 | Supplying and fixing modular blanking plate on the existing modular plate & switch box excluding modular plate as required. |
| 13 | Supplying and fixing 5 A to 32 A rating, 240/415 V, 10 kA, “C” curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required. Single pole |
| 14 | Supplying and fixing 5 A to 32 A rating, 240/415 V, 10 kA, “C” curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required. Single pole and neutral |
| 15 | Supplying and fixing 5 A to 32 A rating, 240/415 V, 10kA, \\"C\\" curve, miniature circuit breaker suitable forinductive load of following poles in the existing MCBDB complete with connections, testing andcommissioning etc. as required. Triple pole and neutral |
| 16 | Supplying and fixing following way, single pole and neutral, sheet steel, MCB distribution board, 240 V, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator). 12 way , Double door |
| 17 | Supply, Installation, Testing and Commissioning of ceiling fan with Brush Less Direct Current (BLDC) Motor, class of insulation: B, 3 nos. metal(Aluminium alloy) blades, 30 cm long down rod, 2 nos. canopies, shackle kit, safety rope, copper winding, steel/Al body. Power Factor not less than 0.9, Service Value (CM/M/W) minimum as below, 350 RPM (tolerance as per IS : 374-2019), THD (Total Harmonic Distortion) less than 10%, remote (preferably mobile app based) for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 0C (max.), insulation resistance more than 2 mega ohm, suitable for 230 V, 50 Hz, single phase AC supply Ceiling Fan compliant to IS 374:2019 fan i/c external connections with 1.5 sq.mm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required. 1200mm, service value ≥ 6.0 CM/Min/Watt, air delivery 210 CM/Min (Minimum) |
| 18 | Installation of exhaust fan in the existing opening, including making good the damage, connection, testing, commissioning etc. as required. Upto 450 mm sweep |
| 19 | Supplying Installation, Testing and Commissioning offollowing capacity TPN tap off box made of 1.6mmthick sheet steel enclosure duly painted with powdercoating on existing rising mains complete with TPNdisconnector FSU and HRC fuses, connections,earthing etc. as required. 200 A TPN |
| 20 | Supplying and fixing of surface mounted 20/22 watt batten LED tube fiiting 4 feet long including connections etc as required. |
| 21 | Supplying of following electrical items suitable for operating on 240/230Volts AC, 50 Hz including connections etc. as required. Exhaust fan 300 mm size |
| 22 | SITC of Inverter of 1KVA , single phase input and output including Tubular Battery(12X2) 200 AH Duration 4 Hrs. Complete Job (Reputed make ) |
| 23 | SITC of 50L Storage Water (Geyser) Complete Job (Reputed make ) Please Enable Macros to View BoQ information |