| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : |
| 3 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 9 | Slip ClearanceIn ordinary soils disposal lead upto 50 m and lift upto 1.5 m. |
| 10 | In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. |
| 11 | Providing, Laying & Fixing of HDPE Pipes including Carriage (Complete Job) (LMR) |
| 12 | Supply of Stones (Nallah Boulder) |
| 13 | Dumping stone excluding cost of stones. in Horizontal on level |
| 14 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 15 | Supply of GI wire Crates of mesh Size 100mmx100mm with 4mm wire dia (tolerance 0.05mm) (LMR) |
| 16 | Binding Wire 4mm dia (tolerance 0.05mm) as per Specification under I.S 280:2006 (LMR) |
| 17 | Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand. |
| 18 | Loading/Unloading sand/ earth filled bags in lorries; lead upto 50m. |
| 19 | Supply of Empty Cement Poly Bags |
| 20 | Laying in position sand/earth filled bags as per directions of Engineer in-chargeIn Dry |
| 21 | In Wet |
| 22 | Supplying and stacking of Good Earth at site including royalty (Earth measured in stacks will be reduced by 20% for payment ) |
| 23 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Welded |
| 24 | Engagement of Excavator cum Loader |
| 25 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. |
| 26 | Providing, Laying of polythene of secified weight of approved brand & colour including all carriage complete job (LMR) |
| 27 | Supply of Laboour at site of work (08 hour work shift) |
| 28 | Supply of Blacksmith Ist class at site of work (08 hour work shift) |
| 29 | Supply of Blacksmith 2nd class at site of work (08 hour work shift) |
| 30 | Supply of Carpenter at site of work (08 hour work shift) |
| 31 | Supply of Masson at site of work (08 hour work shift) |
| 32 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth. |
| 33 | Beyond 60 cm girth upto and including 120 cm girth. |
| 34 | Beyond 120 cm girth upto and including 240 cm girth. |
| 35 | Above 240 cm girth |
| 36 | Supply of Lubricant grease (LMR) |
| 37 | Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete. Please Enable Macros to View BoQ information |