|
| 1 | Complete Oil change of the machine by way of draining out the old Oil and then P/F of Engine Oil 15W40-12 Itrs, Engine Oill Filter- 1 set., Air Filter 1 Set, Differential Oil-6 trs(SAE 140), Gear oil -6 litres (SAE 80W/90), Diesel Filter-1 Set. Complete Job Includes cost of material and labour charges |
| 2 | Repairs to Tie rod & King pin assy by way of dismantling, extraction of worn-out parts and replacement with p/f of new parts ie king pin-02 no, king pin bush-04 no, king pin bearing-02 no., arm bolt-01 no spacer-02no, shims-02 no., o-ring -02 no, king pin lock-02 no. Tie rod end L/H and R/H-01 set, tie rod end repair kit-01 kit, king pin repair kit-01 no alignment of wheel and checking. The job includes cost of material and labour charges 2 for fitting and checking. Complete job |
| 3 | Complete replacement of cabin wiring by way of removal of old wiring and then replacing it with parts viz. IE311379 INTERNAL ROOF WIRING HARNESS-01 no., IE314950 INTERNAL ROOF WIRING HARNESS-01-no, IE319889 ENGINE WIRING HARNESS-01 no. IE321413 FRONT CHASSIS HARNESS-01 no., including all fuses, Relays, connectors, P/F of new lights te head light assy -01 no (as per sample, rear light assy-02 nos (as per sample), new ignition switch with complete wiring, LT wire 15 meter, tape roll-01 no, wiper motor-01 no, wiper blade -02 no, Battery leads with thimbles, repair, testing of full electrical system. The job includes cost of material and labour charges (Complete job) |
| 4 | Dismantling of Front & Rear wheel for repairs, job involves extracting of defective parts, cleaning, inspecting, P/F of new parts in place of defective parts, cleaning with K oil/waste cloth, repairing by P/F of new parts ie Front Wheel Oil Seals-2 nos. Front Axle Taper Roller Bearing-Inner-2 Nos, Front Axle Taper Roller Bearing-Outer-1 Nos, oil seals(F&R), Hub Bearing Inner-1 No, Hub Bearing Outer-1 No. Front and rear wheel brake lining along with rivets-2 set including 1 No. master cylinder and allied spares Complete job includes cost of material, labour charges and includes all taxes |
| 5 | Repairs to the cabin hood of the bus by way of dismantling/ removal of old/ damaged cabin hood, tool box seats rear of cabin supports, cross rafter-3 nos, side runner(battons) by way of gas/electric welding cutter etc and then repairing to make it good including denting of the vehicle. The job also includes touching up of paint of the vehicle after its denting Complete Job. The job also includes providing of reflective tapes, fitness fees, governor calibration certificate etc Complete Job |
| 6 | Repairs to Gear box Labour charges for dismantling of gear box & removing of damaged parts with P/F of new parts ie. 2rd speed gear-01 no, Ird speed gear-01 no counter shaft bearing-02 no, shalt bolt with washer-05 no, synchronizing ring-02 no, chuck nut-02 no Needle bearing -01 no. Puppet bolt & spring, Joint kit -01 no. Engaging gear-01 no., Main shaft chuck nut -01 no Gear oil-08 Itrs the job includes polishing of main shaft, labour charges and cost of material (Complete job) |
| 7 | Retreading of 04 no rear Tyre 8.25-16) along with tubes and flaps including its fitting the vehcile in place of old one . Complite job Please Enable Macros to View BoQ information |