|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil |
| 2 | Providing and Laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering all work upto plinth level 1:5:10 (1 Cement:5 coarse sand:10 Graded stone aggregate 40mm nominal size) |
| 3 | Providing and Laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering all work upto plinth level 1:3:6 (1 Cement:3 coarse sand:6 Graded stone aggregate 20mm nominal size) with 30% boulder |
| 4 | Reinforced cement concrete in beams ,suspended floors.roofs having slopes upto 15 degree landings, balconies, shelves, chajjas,lintels,bands,plain windows sills,stair cases and spiral stair cases upto 5 level including curing but excluding the cost of centering,shuttering and reinforcement withl 1:1.5:3 (1 Cement:1.5 Coarse sand:3 Graded stone aggregate 20mm nominal size) |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls Under 20 cm wide |
| 9 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. |
| 10 | Carriage of Sand & Agg. average lead upto 25.00 km by M.T |
| 11 | Carriage of Stone average lead upto 200.00 meter by A/T |
| 12 | Add Provission for Citizen information Board including painting writing etc. all complet job Please Enable Macros to View BoQ information |