| Sl. No. | Item Description |
| 1 | 11 kv cut point with 90 Degree AngleWPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 2 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 4 no's Channel(GI) required =( 4x9.56x1.2) |
| 3 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280) |
| 4 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 4 no's Channel(GI) required =( 4x9.56x0.306) |
| 5 | Danger Plate, 1 no's. |
| 6 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 7 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 8 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 9 | 11 KV pin insulator polymer |
| 10 | H W fitting(B&S) 70KN, 3Bolt |
| 11 | Disc insulator (B&S) 70 KN polymer |
| 12 | Earthing of Support ( Coil Type ) |
| 13 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 14 | WEDGE CONNECTOR FOR 80 SQMM.CONDUCTOR |
| 15 | POLYCARBONATE BIRD GUARD |
| 16 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 17 | H.T. Stay set (Complete ) |
| 18 | H.T. Stay Insulator Type-C |
| 19 | 7/10 SWG Stay Wire 15kg /stay |
| 20 | GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole) |
| 21 | Black Paint(GIS Numbering & Zebra Stripping) |
| 22 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 23 | Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 24 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 25 | Couping ratio 1:1.5:3(M-20 Grade) with dimension ( 500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 26 | 11kv pin points with WPBWPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 27 | 11 KV V cross Arm(GI) (10.2 K.g. each ) |
| 28 | Top bracket 100x50X6 mm GI Channel(GI) (2kg each) |
| 29 | Danger Plate, 1 no's. for each pole |
| 30 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 31 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 32 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 33 | 11 KV pin insulator polymer, 3 Nos. required for each support |
| 34 | Earthing of Support ( Coil Type ) |
| 35 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 36 | GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point) |
| 37 | 80 sq.mm XLPE AAA conductor |
| 38 | Black Paint(GIS Numbering & Zebra Stripping) |
| 39 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 40 | POLYCARBONATE BIRD GUARD |
| 41 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 42 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 43 | 11kv pin points with WPBPSC POLE 10 METER LONG 330 KG. |
| 44 | PSC Pole Clamp(GI) |
| 45 | 11 KV V cross Arm(GI) (10.2 K.g. each ) |
| 46 | Top bracket 100x50X6 mm GI Channel(GI) (2kg each) |
| 47 | Danger Plate, 1 no's. for each pole |
| 48 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 49 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 50 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 51 | 11 KV pin insulator polymer, 3 Nos. required for each support |
| 52 | Earthing of Support ( Coil Type ) |
| 53 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 54 | GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point) |
| 55 | Black Paint(GIS Numbering & Zebra Stripping) |
| 56 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 57 | POLYCARBONATE BIRD GUARD |
| 58 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1667mm) = 0.42Cu.mtr(Per Pole) |
| 59 | 63Kva S/SWPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 60 | 9 Mtr. long 300 Kg. PSC Pole |
| 61 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 62 | EYE hook for XLPE Aerial bunched Cable |
| 63 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 64 | LT Cable raising Channel(GI) 75x40x4.8 mm GI Channel(GI) (1000 mm long)(7.14Kg./Mtr., 3 No's.) (Each 3x1.000x7.14= 21.42 Kg) |
| 65 | Top Channel(GI) GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 66 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 67 | M.U Channel(GI) GI 75x40x4.8 mm (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 68 | AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 69 | AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =( 9.56x2x0.35) |
| 70 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1) |
| 71 | HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 72 | Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 73 | Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 74 | Transformer Base GI Channel(GI) 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 75 | Transformer Base Support GI Channel(GI) 100 X 50 X 6 MM (515 mm long) (9.56Kg./Mtr, 2 No's) (Each 2x0.515x9.56= 9.85Kg) |
| 76 | Transformer Belting Angle(GI) 50 X 50 X 6MM GI (3000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x3.0x4.5 Kg) |
| 77 | Transformer Belting Support Angle(GI) 50 X 50 X 6MM GI (580 mm long)(4.5Kg./Mtr,2 No's) (Each 2x0.580x4.5= Kg) |
| 78 | LTDB Mounting Angle(GI) 50 X 50 X 6MM GI (1000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x1x4.5 Kg) |
| 79 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 80 | LT Distribution Box with MCCB, Aluminium Busbar of single Bay with kit kat fuse for 63 KVA S/S |
| 81 | 55 SQ.MM. AAAC XLPE Covered Conductor |
| 82 | 4 Cx 95 mm2 LT XLPE Cable(Armoured) - FOR 63 KVA Trf. |
| 83 | 4 Cx 95 mm2 LT XLPE Cable(Armoured) - From LTDB to Pole |
| 84 | AB Switch(11KV,200A.3pole,50Hz) |
| 85 | H.G.Fuse( 11KV.200A.3Pole) |
| 86 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 87 | POLYCARBONATE BIRD GUARD |
| 88 | Disc insulator (B&S)70 KN polymer |
| 89 | H W fitting (B&S)70KN(3bolted) |
| 90 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 91 | 11KV pin insulator polymer |
| 92 | HT stay set complete |
| 93 | HT stay Clamp (1.9Kg/pair) |
| 94 | HT stay insulator TYPE-C |
| 95 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 96 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 97 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 98 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 99 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 100 | Danger plate 11kv |
| 101 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 102 | Name plate |
| 103 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 104 | Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering |
| 105 | 63 KVA , 11/ 0.4 KV (AL) Transformer, BIS Energy Loss level II, Ammendment-4 |
| 106 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.450Cu.mtr(Per Pole) (For WPB Pole) |
| 107 | Couping ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr(Per Pole) |
| 108 | PCC ratio 1:3:6(M-10 Grade) For DSS Area (5X3X0.1)= 1.5 Cu. mtr. |
| 109 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator . |
| 110 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 111 | Laying of 4 Cx 95 mm2 LT XLPE Cable |
| 112 | SITC and Erection of GI Fencing with Gate |
| 113 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) (For PSC Pole) |
| 114 | Supply of AL Lugs suitable for 95 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 115 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 50-95sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 116 | Inspection fees of Transformer,LV Cable & Drawing Checking |
| 117 | 25 Kva S/SWPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 118 | 9 Mtr. long 300 Kg. PSC Pole |
| 119 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 120 | EYE hook for XLPE Aerial bunched Cable |
| 121 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 122 | LT Cable raising Channel(GI) 75x40x4.8 mm GI Channel(GI) (1000 mm long)(7.14Kg./Mtr., 3 No's.) (Each 3x1.000x7.14= 21.42 Kg) |
| 123 | Top Channel(GI) GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 124 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 125 | M.U Channel(GI) GI 75x40x4.8 mm (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 126 | AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 127 | AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =( 9.56x2x0.35) |
| 128 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1) |
| 129 | HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 130 | Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 131 | Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 132 | Transformer Base GI Channel(GI) 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 133 | Transformer Base Support GI Channel(GI) 100 X 50 X 6 MM (515 mm long) (9.56Kg./Mtr, 2 No's) (Each 2x0.515x9.56= 9.85Kg) |
| 134 | Transformer Belting Angle(GI) 50 X 50 X 6MM GI (3000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x3.0x4.5 Kg) |
| 135 | Transformer Belting Support Angle(GI) 50 X 50 X 6MM GI (580 mm long)(4.5Kg./Mtr,2 No's) (Each 2x0.580x4.5= Kg) |
| 136 | LTDB Mounting Angle(GI) 50 X 50 X 6MM GI (1000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x1x4.5 Kg) |
| 137 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 138 | LT Distribution Box with MCCB, Aluminium Busbar of single Bay with kit kat fuse for 25 KVA S/S |
| 139 | 55 SQ.MM. AAAC XLPE Covered Conductor |
| 140 | 4 Cx 35 mm2 LT XLPE Cable(Armoured) - FOR 25 KVA Trf. |
| 141 | 4 Cx 35 mm2 LT XLPE Cable(Armoured) - From LTDB to PSC Pole |
| 142 | AB Switch(11KV,200A.3pole,50Hz) |
| 143 | H.G.Fuse( 11KV.200A.3Pole) |
| 144 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 145 | POLYCARBONATE BIRD GUARD |
| 146 | Disc insulator (B&S)70 KN polymer |
| 147 | H W fitting (B&S)70KN(3bolted) |
| 148 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 149 | 11KV pin insulator polymer |
| 150 | HT stay set complete |
| 151 | HT stay Clamp (1.9Kg/pair) |
| 152 | HT stay insulator TYPE-C |
| 153 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 154 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 155 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 156 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 157 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 158 | Danger plate 11kv |
| 159 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 160 | Name plate |
| 161 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 162 | Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering |
| 163 | 25 KVA , 11/ 0.4 KV (AL) Transformer, BIS Energy Loss level II, Ammendment-4 |
| 164 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.450Cu.mtr(Per Pole) (For WPB Pole) |
| 165 | Couping ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr(Per Pole) |
| 166 | PCC ratio 1:3:6(M-10 Grade) For DSS Area (5X3X0.1)= 1.5 Cu. mtr. |
| 167 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator . |
| 168 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 169 | Laying of 4 Cx 35 mm2 LT XLPE Cable |
| 170 | SITC and Erection of GI Fencing with Gate |
| 171 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) (For PSC Pole) |
| 172 | Supply of AL Lugs suitable for 35 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 173 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 16-35sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 174 | Inspection fees of Transformer,LV Cable & Drawing Checking |
| 175 | LT AB Cable Line9 Mtr. long 300 Kg. PSC Pole |
| 176 | LT Stay set Complete |
| 177 | 7/12 SWG GI stay wire, Grade -2 |
| 178 | LT stay Clamp ( 1.40Kg/pair) |
| 179 | LT Stay insulator |
| 180 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 181 | EYE hook for XLPE Aerial bunched Cable |
| 182 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 183 | Suspension Clamp with EYE hook for ABC |
| 184 | 4C×50 mm² (P)+1C×50 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable) |
| 185 | Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm |
| 186 | GI Pipe Earthing (each 5th pole to earth) |
| 187 | Coil Earthing |
| 188 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 189 | Danger plate (LT) |
| 190 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 191 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 192 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 193 | GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole) |
| 194 | Black Paint(GIS Numbering & Zebra Stripping) |
| 195 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 196 | Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.) |
| 197 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) |
| 198 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 199 | GuardingGuarding Channel(GI) 75x40x4.8 mm, 7.14 KG/Mtr., each Channel(GI) length 2.5 mtr., 4 no's Channel(GI) required =( 4x7.14x2.5) ( For Single Pole) |
| 200 | No-6 GI wire (0.192 kg/mtr.) for Main String |
| 201 | No-8 GI wire (0.131 kg/mtr.) for lacing |
| 202 | Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.) |
| 203 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 204 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (12.7 mtr For raising)= 12.7x2.36 |
| 205 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 206 | Dismantling of Materials Dismantling of 11/13 Mtr. Joist/WPB Pole- 150X150 mm/ 160X160 mm |
| 207 | Dismantling of 9/8 Mtr. PCC/Joist Pole |
| 208 | Dismantling / Removal of V Cross arm from pole |
| 209 | Dismantling of 11kV Pin Insulator with Pin |
| 210 | Dismantling of 11kV Disc Insulator with Hardware |
| 211 | Dismantling / Removal of MS Channel. from Double Pole Structure /pole |
| 212 | Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer 25KVA including removal of HT/LT leads, earth connections and unloading by crane if required. |
| 213 | Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer 63KVA including removal of HT/LT leads, earth connections and unloading by crane if required. |
| 214 | 11kv cut point with 180 degree AngleWPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 215 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 2 no's Channel(GI) required =( 2x9.56x1.2) |
| 216 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280) |
| 217 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 2 no's Channel(GI) required =(2x9.56x0.306) |
| 218 | Danger Plate, 1 no's. |
| 219 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 220 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 221 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 222 | 11 KV pin insulator polymer |
| 223 | H W fitting(B&S) 70KN, 3Bolt |
| 224 | Disc insulator (B&S) 70 KN polymer |
| 225 | Earthing of Support ( Coil Type ) |
| 226 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 227 | Non metallic Ties-11kv 80sqmm CVRD AAAC |
| 228 | ipc FOR 80 SQMM AAA Conductor (for covered conductor)-11kv |
| 229 | Spike (GI) (using 50x6mm flat GI welded with 8mm Square bar)(2 nos of spike per set in each pole) |
| 230 | GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole) |
| 231 | Black Paint(GIS Numbering & Zebra Stripping) |
| 232 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 233 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 234 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 235 | 11kv cut point with 90 degree AngleWPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 236 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 4 no's Channel(GI) required =( 4x9.56x1.2) |
| 237 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280) |
| 238 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 4 no's Channel(GI) required =( 4x9.56x0.306) |
| 239 | Danger Plate, 1 no's. |
| 240 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 241 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 242 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 243 | 11 KV pin insulator polymer |
| 244 | H W fitting(B&S) 70KN, 3Bolt |
| 245 | Disc insulator (B&S) 70 KN polymer |
| 246 | Earthing of Support ( Coil Type ) |
| 247 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 248 | Non metallic Ties-11kv 80sqmm CVRD AAAC |
| 249 | ipc FOR 80 SQMM AAA Conductor (for covered conductor)-11kv |
| 250 | Spike (GI) (using 50x6mm flat GI welded with 8mm Square bar)(2 nos of spike per set in each pole) |
| 251 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 252 | H.T. Stay set (Complete ) |
| 253 | H.T. Stay Insulator Type-C |
| 254 | 7/10 SWG Stay Wire 15kg /stay |
| 255 | GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole) |
| 256 | Black Paint(GIS Numbering & Zebra Stripping) |
| 257 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 258 | Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 259 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 260 | Couping ratio 1:1.5:3(M-20 Grade) with dimension ( 500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 261 | Material for 11kv pin point with WPBWPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 262 | 11 KV V cross Arm(GI) (10.2 K.g. each ) |
| 263 | Top bracket 100x50X6 mm GI Channel(GI) (2kg each) |
| 264 | Danger Plate, 1 no's. for each pole |
| 265 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 266 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 267 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 268 | 11 KV pin insulator polymer, 3 Nos. required for each support |
| 269 | Earthing of Support ( Coil Type ) |
| 270 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 271 | GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point) |
| 272 | 80 sq.mm AAA conductor |
| 273 | Black Paint(GIS Numbering & Zebra Stripping) |
| 274 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 275 | Non metallic Ties-11kv 80sqmm CVRD AAAC |
| 276 | Spike (GI) (using 50x6mm flat GI welded with 8mm Square bar)(2 nos of spike per set in each pole) |
| 277 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 278 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 279 | 500 KVA Plinth Mounted DSSWPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 280 | 9 Mtr. long 300 Kg. PSC Pole |
| 281 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 282 | EYE hook for XLPE Aerial bunched Cable |
| 283 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 284 | LT Cable raising Channel(GI) 75x40x4.8 mm GI Channel(GI) (1000 mm long)(7.14Kg./Mtr., 6 No's.) (Each 6x1.000x7.14= 42.84 Kg) |
| 285 | Top Channel(GI) GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 286 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 287 | AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 288 | AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =( 9.56x2x0.35) |
| 289 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1) |
| 290 | HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 291 | Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 292 | Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 293 | Double Pole Belting Channel(GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 3.0 Mtr., 2 no's Channel(GI) required =( 7.14x3x2) |
| 294 | 50x50x6mm.GI Bracing Angle(GI), 4.5Kg./mtr., each Angle(GI) length 3.512 mtr., 2 nos Angle(GI) required = (4.5x3.512x2) |
| 295 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 296 | LT Distribution Box with MCCB, Aluminium Busbar for 4 Bay with kit kat fuse for 500 KVA S/S |
| 297 | 55 SQ.MM. AAAC XLPE Covered Conductor |
| 298 | 1 Cx 630 mm2 LT XLPE Cable(Un-Armoured) |
| 299 | LT Cable Supporting Channel(GI) 100 X 50 X 6 MM GI Channel(GI) (2000 mm long)(9.56 Kg./Mtr., 2 No's.) (Each 2x2x9.56= 28.56 Kg) |
| 300 | LT Cable Supproting Angle(GI), 50x50x6mm.GI 4.5Kg./mtr., each Angle(GI) length 2 mtr., 4 nos Angle(GI) required = (4.5x4x2) |
| 301 | Supply of 1.1kV, 4Core, 150 sqmm, XLPE insulation armoured -Aluminium UG cable from LTDB to Pole |
| 302 | AB Switch(11KV,200A.3pole,50Hz) |
| 303 | D.O.Fuse( 11KV.200A.3Pole) |
| 304 | 30 Amp fuse link |
| 305 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 306 | POLYCARBONATE BIRD GUARD |
| 307 | Disc insulator (B&S)70 KN polymer |
| 308 | H W fitting (B&S)70KN(3bolted) |
| 309 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 310 | 11KV pin insulator polymer |
| 311 | HT stay set complete |
| 312 | HT stay Clamp (1.9Kg/pair) |
| 313 | HT stay insulator TYPE-C |
| 314 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 315 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 316 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 317 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 318 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 319 | Danger plate 11kv |
| 320 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 321 | Name plate |
| 322 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 323 | Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering |
| 324 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.450Cu.mtr(Per Pole) (For WPB Pole) |
| 325 | Couping ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr(Per Pole) |
| 326 | PCC ratio 1:3:6(M-10 Grade) For DSS Area (3.5X3.5X0.1)= 1.225 Cu. mtr. |
| 327 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator . |
| 328 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 329 | LTDB Plinth |
| 330 | DTR Plinth upto 1000 KVA |
| 331 | Laying of 4 Cx 150 mm2 LT XLPE Cable |
| 332 | Laying of 1.1kV cable from 400 to 1000sqmm |
| 333 | SITC and Erection of GI Fencing with Gate |
| 334 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) (For PSC Pole) |
| 335 | Supply of AL Lugs suitable for 400 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 336 | Supply of AL Lugs suitable for 150 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 337 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 1C 300-1000 sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 338 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 120-185sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 339 | Inspection fees of Transformer,LV Cable |
| 340 | 250kva Plinth Mounted DSSWPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 341 | 9 Mtr. long 300 Kg. PSC Pole |
| 342 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 343 | EYE hook for XLPE Aerial bunched Cable |
| 344 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 345 | LT Cable raising Channel(GI) 75x40x4.8 mm GI Channel(GI) (1000 mm long)(7.14Kg./Mtr., 6 No's.) (Each 6x1.000x7.14= 42.84 Kg) |
| 346 | Top Channel(GI) GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 347 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 348 | AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 349 | AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =( 9.56x2x0.35) |
| 350 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1) |
| 351 | HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 352 | Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 353 | Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 354 | Double Pole Belting Channel(GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 3.0 Mtr., 2 no's Channel(GI) required =( 7.14x3x2) |
| 355 | 50x50x6mm.GI Bracing Angle(GI), 4.5Kg./mtr., each Angle(GI) length 3.512 mtr., 2 nos Angle(GI) required = (4.5x3.512x2) |
| 356 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 357 | LT Distribution Box with MCCB, Aluminium Busbar for 3 Bay with kit kat fuse for 250 KVA S/S |
| 358 | 55 SQ.MM. AAAC XLPE Covered Conductor |
| 359 | 1 Cx 630 mm2 LT XLPE Cable(Un-Armoured) |
| 360 | LT Cable Supporting Channel(GI) 100 X 50 X 6 MM GI Channel(GI) (2000 mm long)(9.56 Kg./Mtr., 2 No's.) (Each 2x2x9.56= 28.56 Kg) |
| 361 | LT Cable Supproting Angle(GI), 50x50x6mm.GI 4.5Kg./mtr., each Angle(GI) length 2 mtr., 4 nos Angle(GI) required = (4.5x4x2) |
| 362 | Supply of 1.1kV, 4Core, 150 sqmm, XLPE insulation armoured -Aluminium UG cable from LTDB to Pole |
| 363 | AB Switch(11KV,200A.3pole,50Hz) |
| 364 | D.O.Fuse( 11KV.200A.3Pole) |
| 365 | 20amp fuse link |
| 366 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 367 | POLYCARBONATE BIRD GUARD |
| 368 | Disc insulator (B&S)70 KN polymer |
| 369 | H W fitting (B&S)70KN(3bolted) |
| 370 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 371 | 11KV pin insulator polymer |
| 372 | HT stay set complete |
| 373 | HT stay Clamp (1.9Kg/pair) |
| 374 | HT stay insulator TYPE-C |
| 375 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 376 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 377 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 378 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 379 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 380 | Danger plate 11kv |
| 381 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 382 | Name plate |
| 383 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 384 | Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering |
| 385 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.450Cu.mtr(Per Pole) (For WPB Pole) |
| 386 | Couping ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr(Per Pole) |
| 387 | PCC ratio 1:3:6(M-10 Grade) For DSS Area (3.5X2.5X0.1)= 0.875 Cu. mtr. |
| 388 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator . |
| 389 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 390 | LTDB Plinth |
| 391 | DTR Plinth |
| 392 | Laying of 4 Cx 150 mm2 LT XLPE Cable |
| 393 | Laying of 1.1kV cable from 400 to 1000sqmm |
| 394 | SITC and Erection of GI Fencing with Gate |
| 395 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) (For PSC Pole) |
| 396 | Supply of AL Lugs suitable for 400 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 397 | Supply of AL Lugs suitable for 150 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 398 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 1C 300-1000 sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 399 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 120-185sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 400 | Inspection fees of Transformer,LV Cable |
| 401 | 100Kva DP mounted DSSWPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 402 | 9 Mtr. long 300 Kg. PSC Pole |
| 403 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 404 | EYE hook for XLPE Aerial bunched Cable |
| 405 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 406 | LT Cable raising Channel(GI) 75x40x4.8 mm GI Channel(GI) (1000 mm long)(7.14Kg./Mtr., 3 No's.) (Each 3x1.000x7.14= 21.42 Kg) |
| 407 | Top Channel(GI) GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 408 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 409 | AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 410 | AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =( 9.56x2x0.35) |
| 411 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1) |
| 412 | HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 413 | Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 414 | Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 415 | Transformer Base GI Channel(GI) 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 416 | Transformer Base Support GI Channel(GI) 100 X 50 X 6 MM (515 mm long) (9.56Kg./Mtr, 2 No's) (Each 2x0.515x9.56= 9.85Kg) |
| 417 | Transformer Belting Angle(GI) 50 X 50 X 6MM GI (3000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x3.0x4.5 Kg) |
| 418 | Transformer Belting Support Angle(GI) 50 X 50 X 6MM GI (580 mm long)(4.5Kg./Mtr,2 No's) (Each 2x0.580x4.5= Kg) |
| 419 | LTDB Mounting Angle(GI) 50 X 50 X 6MM GI (1000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x1x4.5 Kg) |
| 420 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 421 | LT Distribution Box with MCCB, Aluminium Busbar of 2 Bay with kit kat fuse for 100 KVA S/S |
| 422 | 55 SQ.MM. AAAC XLPE Covered Conductor |
| 423 | 4 Cx 150 mm2 LT XLPE Cable(Armoured) - FOR 100 KVA Trf. |
| 424 | 1.1kV, 4Core, 150 sqmm, XLPE insulation armoured -Aluminium UG cable from LTDB to Pole |
| 425 | AB Switch(11KV,200A.3pole,50Hz) |
| 426 | D.O. Fuse( 11KV.200A.3Pole) |
| 427 | 10 Amp fuse link |
| 428 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 429 | POLYCARBONATE BIRD GUARD |
| 430 | Disc insulator (B&S)70 KN polymer |
| 431 | H W fitting (B&S)70KN(3bolted) |
| 432 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 433 | 11KV pin insulator polymer |
| 434 | HT stay set complete |
| 435 | HT stay Clamp (1.9Kg/pair) |
| 436 | HT stay insulator TYPE-C |
| 437 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 438 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 439 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 440 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 441 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 442 | Danger plate 11kv |
| 443 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 444 | Name plate |
| 445 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 446 | Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering |
| 447 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.450Cu.mtr(Per Pole) (For WPB Pole) |
| 448 | Couping ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr(Per Pole) |
| 449 | PCC ratio 1:3:6(M-10 Grade) For DSS Area (5X3X0.1)= 1.5 Cu. mtr. |
| 450 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator . |
| 451 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 452 | Laying of 4 Cx 150 mm2 LT XLPE Cable |
| 453 | SITC and Erection of GI Fencing with Gate |
| 454 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) (For PSC Pole) |
| 455 | Supply of AL Lugs suitable for 150 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 456 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 120-185sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 457 | Inspection fees of Transformer,LV Cable |
| 458 | 25Kva DP Mounted DSSWPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 459 | 9 Mtr. long 300 Kg. PSC Pole |
| 460 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 461 | EYE hook for XLPE Aerial bunched Cable |
| 462 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 463 | LT Cable raising Channel(GI) 75x40x4.8 mm GI Channel(GI) (1000 mm long)(7.14Kg./Mtr., 3 No's.) (Each 3x1.000x7.14= 21.42 Kg) |
| 464 | Top Channel(GI) GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 465 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 466 | AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 467 | AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =( 9.56x2x0.35) |
| 468 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1) |
| 469 | HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 470 | Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 471 | Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 472 | Transformer Base GI Channel(GI) 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 473 | Transformer Base Support GI Channel(GI) 100 X 50 X 6 MM (515 mm long) (9.56Kg./Mtr, 2 No's) (Each 2x0.515x9.56= 9.85Kg) |
| 474 | Transformer Belting Angle(GI) 50 X 50 X 6MM GI (3000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x3.0x4.5 Kg) |
| 475 | Transformer Belting Support Angle(GI) 50 X 50 X 6MM GI (580 mm long)(4.5Kg./Mtr,2 No's) (Each 2x0.580x4.5= Kg) |
| 476 | LTDB Mounting Angle(GI) 50 X 50 X 6MM GI (1000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x1x4.5 Kg) |
| 477 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 478 | LT Distribution Box with MCCB, Aluminium Busbar of single Bay with kit kat fuse for 25 KVA S/S |
| 479 | 55 SQ.MM. AAAC XLPE Covered Conductor |
| 480 | 4 Cx 35 mm2 LT XLPE Cable(Armoured) - FOR 25 KVA Trf. |
| 481 | 4 Cx 35 mm2 LT XLPE Cable(Armoured) - From LTDB to PSC Pole |
| 482 | AB Switch(11KV,200A.3pole,50Hz) |
| 483 | D.O.Fuse( 11KV.200A.3Pole) |
| 484 | 2.5Amp fuse link |
| 485 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 486 | POLYCARBONATE BIRD GUARD |
| 487 | Disc insulator (B&S)70 KN polymer |
| 488 | H W fitting (B&S)70KN(3bolted) |
| 489 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 490 | 11KV pin insulator polymer |
| 491 | HT stay set complete |
| 492 | HT stay Clamp (1.9Kg/pair) |
| 493 | HT stay insulator TYPE-C |
| 494 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 495 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 496 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 497 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 498 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 499 | Danger plate 11kv |
| 500 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 501 | Name plate |
| 502 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 503 | Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering |
| 504 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.450Cu.mtr(Per Pole) (For WPB Pole) |
| 505 | Couping ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr(Per Pole) |
| 506 | PCC ratio 1:3:6(M-10 Grade) For DSS Area (5X3X0.1)= 1.5 Cu. mtr. |
| 507 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator . |
| 508 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 509 | Laying of 4 Cx 35 mm2 LT XLPE Cable |
| 510 | SITC and Erection of GI Fencing with Gate |
| 511 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) (For PSC Pole) |
| 512 | Supply of AL Lugs suitable for 35 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 513 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 16-35sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 514 | Inspection fees of Transformer,LV Cable |
| 515 | LT AB Cable 4Cx95mm29 Mtr. long 300 Kg. PSC Pole |
| 516 | PSC Pole 10 Mtr. long 330 Kg. |
| 517 | LT Stay set Complete |
| 518 | 7/12 SWG GI stay wire, Grade -2 |
| 519 | LT stay Clamp ( 1.40Kg/pair) |
| 520 | LT Stay insulator |
| 521 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 522 | EYE hook for XLPE Aerial bunched Cable |
| 523 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 524 | Suspension Clamp with EYE hook for ABC |
| 525 | 4C×95 mm² (P)+1C×95 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable) |
| 526 | Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm |
| 527 | GI Pipe Earthing (each 5th pole to earth) |
| 528 | Coil Earthing |
| 529 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 530 | Danger plate (LT) |
| 531 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 532 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 533 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 534 | GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole) |
| 535 | Black Paint(GIS Numbering & Zebra Stripping) |
| 536 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 537 | Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.) |
| 538 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) |
| 539 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1667mm) = 0.42 Cu.mtr(Per Pole) |
| 540 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 541 | Inspection fee of over head line |
| 542 | LT AB Cable 4Cx70mm2Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 543 | EYE hook for XLPE Aerial bunched Cable |
| 544 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 545 | Suspension Clamp with EYE hook for ABC |
| 546 | 4C×70 mm² (P)+1C×70 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable) |
| 547 | Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm |
| 548 | Inspection fee of over head line |
| 549 | LT AB Cable 4Cx35mm29 Mtr. long 300 Kg. PSC Pole |
| 550 | 10 Mtr. long 330 Kg. PSC Pole |
| 551 | LT Stay set Complete |
| 552 | 7/12 SWG GI stay wire, Grade -2 |
| 553 | LT stay Clamp ( 1.40Kg/pair) |
| 554 | LT Stay insulator |
| 555 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 556 | EYE hook for XLPE Aerial bunched Cable |
| 557 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 558 | Suspension Clamp with EYE hook for ABC |
| 559 | 4C×35 mm² (P)+1C×35 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable) |
| 560 | Insulated piercing connector.Type-B-main 25 to 150 sq.mm & Tap-6 to 35 sq.mm |
| 561 | GI Pipe Earthing (each 5th pole to earth) |
| 562 | Coil Earthing |
| 563 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 564 | Danger plate (LT) |
| 565 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 566 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 567 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 568 | GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole) |
| 569 | Black Paint(GIS Numbering & Zebra Stripping) |
| 570 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 571 | Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.) |
| 572 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) |
| 573 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1667mm) = 0.42Cu.mtr(Per Pole) |
| 574 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 575 | Inspection fee of over head line |
| 576 | GuardingGuarding Channel(GI) 75x40x4.8 mm, 7.14 KG/Mtr., each Channel(GI) length 2.5 mtr., 4 no's Channel(GI) required =( 4x7.14x2.5) ( For Single Pole) |
| 577 | No-6 GI wire (0.192 kg/mtr.) for Main String |
| 578 | No-8 GI wire (0.131 kg/mtr.) for lacing |
| 579 | Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.) |
| 580 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 581 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (12.7 mtr For raising)= 12.7x2.36 |
| 582 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 583 | Dismantling Dismantling of 11/13 Mtr. Joist/WPB Pole- 150X150 mm/ 160X160 mm |
| 584 | Dismantling of 9/8 Mtr. PCC/Joist Pole |
| 585 | Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer 25KVA including removal of HT/LT leads, earth connections and unloading by crane if required. |
| 586 | Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer below 100KVA including removal of HT/LT leads, earth connections and unloading by crane if required. |
| 587 | Dismantling of existing 11/0.4kV, 33/0.4KV, 250kVA Three Phase Distribution Transformer including removal of HT/LT leads, earth connections and unloading by crane if required. |
| 588 | Dismantling of existing 11/0.4kV, 33/0.4KV, 500kVA Three Phase Distribution Transformer including removal of HT/LT leads, earth connections and unloading by crane if required. |
| 589 | Dismantling of ACSR/AAAC 34/ 55mm2 from overhead line |
| 590 | Dismantling of ACSR/AAAC 80/100 mm2 from overhead line |
| 591 | Dismantling of varous size of LT AB CableN:B:. Salvage value @ 8% to be deducted from the Contractor's Bill. Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |