Name of Work:- Comprehensive repair/ maint of SPV power plant 01 MW under GE (E) JRC (Tender ID No 2026_MES_754909_1)
Sl. No.
Item Description
1
Manning, operation and comprehensive maintenance of complete 1 MW On Grid type Solar photo Voltaic Plant (SPV) Project at Jalandhar with SCADA system having Polycrystalline PV module 330Wp (system voltage 1500 volt) - 3176 Nos, Vacuum Circuit breaker 800 Amp - 01 No, String Combiner Box - 04 Nos, Power control unit with inverters 500 KW - 02 Nos (make ABB), Step Up Transformers 1250 KVA - 01 Nos Make Voltamp, SCADA System for solar plants with all sensors i.e. pyranometer, temp sensor, Weather monitoring sensor etc and metering equipment's installed.Plant DescriptionLocation - Jalandhar CanttLatitude - 31.2825822Longitude - 75.6325972DC Capacity - 1048 KWp AC cap - 1 MWDesign and drawing documents - AvailableCommissioning date - 27 Jan 2021 Operational Acceptance - YesDISCOM - PSPCLConnectivity voltage - 11kV Main Grid - 66 kV, solar connected with 11 kV at MH The defects to be recified by the sucessful Bidder:- (a) Ambient Temp sensor not working (b) Module temp sensor not working.
2
(c) Pyranometer (Inrradiation tilt) - Data is not showing in SCADA system. (d) Pyranometer (Irradiation Horizontal) - Data is not showing in SCADA system. (e) Module Temperature Data - Not showing in SCADA system. (f) PV modules not working. (g) String not working due to DC cable fault. (h) Module surface temperature not shown. (i) Ambient temperature not shown in scada.Major Eqpt Details:-i) Module - 3176 Nos - 330 Wp, system voltage 1500VDC, Make Waaree ii) No. of modules / strings - 40 Nos approx (DC 1000V 400A)iii) Inverter - 02 Nos - 500 Kw, Model No PVS 800, Make ABBiv) Data logger - 1v) WMS - Pyranometer (irradiation meter - 4 Nos Make - Kipp & Zonen - Wind speed meter -1 Nos Make - Trinity - Module Temp sensor & Ambient temperature sensor - 1 Nos, IMT Technology Make - Trinityvi) ESE type Lighting Arrester- 2 Nos Make- JMV LPSvii) 11KV VCB 800Amp-01 Nos, ix) HT Cable of size 185sqmm 3 core-290 Mtrs approxx) ,DC Cable- 1176 Mtrs, xi) LT Cable of size 95 sqmm 3 core - SCB to Inverter & Inverter to Transformer - 1200 Mtr approxxii) String combiner Box - 04 Nos
3
SCOPE OF WORKS FOR OPERATION AND MAINTENANCE1. Reference to latest guidelines promulgated by SECI on the subject.2. As per Performance Obligation. the contractor shall maintain minimum Capacity Utilisation Factor (CUF) of 13%. The historical performance of the plant and guaranteed annual CUF is given as under:-Guaranteed CUF of the PlantsName of the site-Jalandhar Cantt, Capacity-01 MW(a) 2021-22(27 Jan 2021 -31 Mar 2022)- 10.71%(b) 2022-23(01 Apr 2022 -31 Mar 2023)- 13%(c) 2023-24(01 Apr 2023 -31 Mar 2024)- 11.87% (d) 2024-25(01 Apr 2024 -10 Dec 2024)- 13.90% Generation (KWH) Report of the plant in last five yearsName of the site- Jalandhar Cantt,Capacity- 01 MW(a) 2021-22(27 Jan 2021 -31 Mar 2022)- 169883 KWH(b) 2022-23(01 Apr 2022 -31 Mar 2023)- 1089784 KWH(c) 2023-24(01 Apr 2023 -31 Mar 2024)- 1217604 KWH(d) 2024-25(01 Apr 2024 -31 Mar 2025)- 1119296 KWH(e) 2025-26 (1 Apr 2025-31 Dec 2025)- 534696 KWHNote:- 1. The succsesfull bidder shall rectify the defects within 45 days of acceptance of the work order in the both the solar power plants such that minimum capacity utlisation factor (CUF) of 13% for plants is maintained.
4
2. Reducinq plant downtime. The Contractor shall ensure the plant availability upto 99%. However, the plant availability due to grid outages will be considered only if the same are certified by the competent authority/ GE. Any other outages which are not attributable to the Contractor and are certified by Department may also be considered. 3. Linear degradation of the module output (i.e., 0.75% of DC capacity at Std temp Condition per year) shall be considered for the calculation of CUF every year 3. Linear degradation of the module output (i.e., 0.75% of DC capacity at Std temp Condition per year) shall be considered for the calculation of CUF every year4. In order to optimize the useful life of the equipment of power plant, the Contractor shall carryout out necessary routine, breakdown and preventive maintenance as per schedules provided. The Contractor shall perform periodic overhauls and preventive maintenance required for the Plant and equipments in accordance with the recommendations of equipment manufacturers (as mentioned in PS).5. Contractor shall carry out the performance monitoring for the Plant Facility on continuous basis and in case of any deviation, the Contractor shall perform the due diligence appropriately to find out the actual root cause of such deviation. Any test or inspection required such as thermal imaging, Current Voltage (IV) characteristics test etc. to analyse such deviation will be the responsibility of the Contractor. Thereafter, the action required to mitigate such deviation shall be undertaken by the Contractor without any additional cost. Please Enable Macros to View BoQ information
5
2. Reducinq plant downtime. The Contractor shall ensure the plant availability upto 99%. However, the plant availability due to grid outages will be considered only if the same are certified by the competent authority/ GE. Any other outages which are not attributable to the Contractor and are certified by Department may also be considered. 3. Linear degradation of the module output (i.e., 0.75% of DC capacity at Std temp Condition per year) shall be considered for the calculation of CUF every year 3. Linear degradation of the module output (i.e., 0.75% of DC capacity at Std temp Condition per year) shall be considered for the calculation of CUF every year4. In order to optimize the useful life of the equipment of power plant, the Contractor shall carryout out necessary routine, breakdown and preventive maintenance as per schedules provided. The Contractor shall perform periodic overhauls and preventive maintenance required for the Plant and equipments in accordance with the recommendations of equipment manufacturers (as mentioned in PS).5. Contractor shall carry out the performance monitoring for the Plant Facility on continuous basis and in case of any deviation, the Contractor shall perform the due diligence appropriately to find out the actual root cause of such deviation. Any test or inspection required such as thermal imaging, Current Voltage (IV) characteristics test etc. to analyse such deviation will be the responsibility of the Contractor. Thereafter, the action required to mitigate such deviation shall be undertaken by the Contractor without any additional cost. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.