| 1 | Item Description/ Heading |
| 2 | Loading & unloading of 10” dia pipe for Central Store/ regional Store to Colliery Store. |
| 3 | Loading & unloading of 8” dia pipe for Central Store/ regional Store to Colliery Store. |
| 4 | Welding of 10” dia MS Flange on both ends of the pipe: |
| 5 | Pipe to pipe welding of 10” dia MS pipe: |
| 6 | Loading & unloading of 10” dia MS pipe for E&M Workshop yard to mines Work site. |
| 7 | Shifting of 10” dia pipe from unloading place to fitting place |
| 8 | Laying & fitting of 10” dia pipe as per instruction of Engr. I/C |
| 9 | Cost of Nuts and Bolts for fitting of 10” dia pipe |
| 10 | Welding of 8” dia flange pipe to pipe welding as per instruction of Engr. I/C |
| 11 | Loading & unloading of 8” dia pipe from E&M Workshop to mines Work site. |
| 12 | Shifting of 8” dia pipe from unloading place to fitting place |
| 13 | Laying & fitting of 8” dia pipe as per instruction of Engr. I/C |
| 14 | Cost of Nuts and Bolts for fitting of 8” dia pipe |
| 15 | Cutting of 10” dia Joint packing from Old conveyor belts |
| 16 | Cutting of 8” dia Joint packing from Old conveyor belts |
| 17 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia |
| 18 | Making of 10” dia short piece by gas cutting & welding |
| 19 | Making of 10” dia bend by gas cutting & welding |
| 20 | Making of 8” dia short piece by gas cutting & welding |
| 21 | Making of 8” dia bend/elbo by gas cutting & welding |
| 22 | New road crossing for fitting of 10” dia/8” dia New pipe line |
| 23 | Making of Pump Motor shed on Pontoon |
| 24 | Making of iron ladder for smooth approach to Pontoon |
| 25 | Shifting and installation of pontoon Containing ( 80 drums/72 drums) |
| 26 | Shifting and Installation of Pontoon containing 60 drums |
| 27 | Installation of Pump Motor Set on Pontoon |
| 28 | Fitting of 12” dia Suction pipe |
| 29 | Fitting of 10” dia Suction pipe |
| 30 | Fitting of 8”: dia Suction pipe |
| 31 | Fitting of 10” dia Jetting hose 3 mtr Long |
| 32 | Fitting of 10” dia NRV/Sluice Valve |
| 33 | Fitting of 8” dia Jetting Hose 3 Mtr Long |
| 34 | Fitting of 8” dia NRV & Sluice valve |
| 35 | Making & erection of Water Tanker loading point |
| 36 | Fabrication/Erection of new bed plate for different size Motor & Pump |
| 37 | Matching of new pipe line with existing old pipe line by gas Cutting & Welding etc. |
| 38 | Loading & unloading of pump accessories from Regional Store to E&M Workshop yard |
| 39 | Laying & fitting of HDPE 8” dia pipe |
| 40 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC Please Enable Macros to View BoQ information |