| 1 | Through out checking of the existing system 1 kg /hr after isolate the gas cylinder, cooper tube and the gas pipe line and dismetaling and taken out the old damaged parts of gaseous chlorination system spares and UPVC scrap line disconnecting and cleanout the liquid chlorine with carefully by trained technician of chlorination system for rectification as per Direction of EIC |
| 2 | Supply & Delivery of following items- |
| 3 | Automatic Vacuum Regulator ( Capacity- 0-1 Kg/hr.) (Body-Tom & Bottom -IS-226, Body Middle-PVC, Diaphragm & Seat-PTFE, Stem-Monel, Disc-PVC, Spindle- SS 316, Gaske- Viton, Spring-SPRING STEEL) (Make-Approved ) |
| 4 | ½” Special type CPVC UNION TYPE BALL VALVE THREAD ADOPTER as per existing size corrotion free for Chlorine line only seal -EPDM (Make-Approved ) |
| 5 | INJECTOR NRV for chlorine gas line , (Body-PVC, Seat-PVC, Dead Weight, PTFE, O Ring- Viton) (Make-Approved ) |
| 6 | EMERGENCY DRAIN VALVE for chlorine line (Body-PVC, Seat-PVC, Dead Weight, PTT, O Ring- Viton) (Make-Approved ) |
| 7 | Vacuum Gauge 0-760 mm Hg full body SS ( Grade - 316) with diaphragm for Chlorine Gas LINE (0- 760) (Make- Baummer/Excel ) |
| 8 | Supply, Delivery 1/2\\" Sch-40, IS-1239, CS Seamless pipe with necessary fittings items ( Chlorine gas line from Regulator to chlorinator common and chlorinator to injector separately for both systems) |
| 9 | 1/2” CS SCH- 40 Seamless pipe only for argon welding |
| 10 | 1/2” CS SCH- 40 Seamless elbow only for argon welding |
| 11 | 1/2” CS SCH- 40 Seamless tee only for argon welding |
| 12 | CS Pipe cutting as per measurement by cutter and fittings such as elbow,tee etc. joint by Argon Welding with necessary welding materials and laying/fixing as per requirment of the site by expireance technician and welder. |
| 13 | Servicing Charges for leck detector repairing by providing sensor of the same configuration in the existing panel , Chlorine Sensor kit refilling,hooter announcing rectification checking and testing charge as per direction of EIC |
| 14 | The non-working Pressure Reducing Valve dismantling and reparing by necessary spare items supply and changing damaged Diapharm and Seal kit set as per requirements using proper tool tackles in the proper way by our experienced technician. |
| 15 | Fitting fixing of the above new supplied spares in proper position, decoupling part by part boosting pump motor and repairing and fitting after Injector servicing, flow control servicing, cleaning,Various type of exiting valve repairing,cleaning of Gas filter,Rota meter etc by expert mechanical complete the job as per direction of EIC |
| 16 | Supply of paint and painting charges of Gaseous pipe line, Water GI pipe line, chlorine dosing motor and pump and other parts of gaseous chlorination system. |
| 17 | Checking and testing of rectified 2 x 1 kg/Hr. chlorination system unit with other all the parameters for health fault free operation for a certaion duration as per satisfaction of EIC |
| 18 | Add: 18% GST |
| 19 | Add: 1% Cess Please Enable Macros to View BoQ information |