|
| 1 | Dismetaling and taken out the old damaged parts of gaseous chlorination system spares and decoupling booster pump & motor after isolate the gas cylinder, cooper tube, gas pipe line and disconnection of power line by trained technician of chlorination system after wearing the safety kit as per direction of EIC. |
| 2 | Supply & Delivery of following items: |
| 3 | Auto Vacuum Regulator Flanch type (Capacity – 0 to 1 Kg/Hr) (Body top & buttom-IS-226, body middle-PVC, diaphragm & seat--PTFE,steam-MONEL, disc--PVC, spindle - SS 316, gasket--VITON, spring-spring steel)Make-Rudra chemical |
| 4 | 1/2 '' CPVC union type ball valve thread adopter.Make-Approve make. |
| 5 | Injector NRV (Body-PVC,Seat-PVC,dead weight-PTFE,O ring-Vitton) Make-Rudra chemicals |
| 6 | Emergency drain valve.(Body-PVC, seat-PVC,Dead weight-PTFE, O ring-viton) Make-Rudra chemicals |
| 7 | Vacuum gauge (0- 760) 4''x 760 mm Hg full body SS (Grade-316) with diaphragm for CL2 gas. Make Excel/ Boummer |
| 8 | Supply,delivery 12.7 mm CS pipe with fittings item for chlorine gas line. |
| 9 | 1/2” CS SCH- 40 Seamless elbow only for argon welding |
| 10 | 1/2” CS SCH- 40 Seamless tee only for argon welding |
| 11 | 1/2” CS SCH- 40 Seamless pipe only for argon welding |
| 12 | Cutting above CS Pipe as per measurement by cutter and fitting above above supplied elbow,tee etc. joint by Argon Welding with necessary welding materials and laying/fixing gas line from Regulator to chlorinator common and chlorinator to injector separately for both system by expireance technician as per direction of EIC. |
| 13 | Servicing and repairing Charges for Leck Detector system including supply of chlorine sensor kit refilling , completely checking and testing hooter announcing for as a safety purpose as per direction of EIC. |
| 14 | Painting of gaseous pipe line, water GI pipe line, motor and pump, Filter, PRV, Frame mounted etc. |
| 15 | Servicing of the non working vacuum regulator (capacity- 0 to 01kg/hr.)dismetaling and reparing by necessary spare items supply and changing damage 01 kg/h capacity Regulator diapharm set and 01 kg/h capacity Regulator Seal kit, teflon capsul by using proper tool tackles and machining the body as proper way by expert technician as per direction of EIC. |
| 16 | Fitting fixing of the above new supplied materials in place of the damage ones part by part in the existing solution and gas pipe line in existing place and reconnecting of the power line after sevicing Injector, flow controll valve ,cleaning of gas filter, rota meter etc as per IS 10553(Part-II) and make it leak proof arrangement with necessary materials by necessary fitting materials and necessary welding upto complete the job as per direction of E.I.C (This includes necessary testing Commissioning of total Chlorination unit.) |
| 17 | Add: 18% GST |
| 18 | Add: 1% Cess Please Enable Macros to View BoQ information |