| 1 | Labour for cleaning the work site before and after work etc. |
| 2 | Labour for site clearance before and after work |
| 3 | Taking out existing CC interlocking paver block from footpath/ central verge ,including of rubbish etc.. Disposal of un servviceable to dumping ground,for which payement shall be made separately and stacking of serviceable materials within 50 m lead as per direction of Engineer -in -charge |
| 4 | Dismantling of plain cement or lime concrete including stacking seviceable materials in countable stacks within 15 M Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I |
| 5 | Dismantling R.C.C. work including stacking serviceable materials in countable stacks within 15m lead and disposal of unserviceable materials with all lead, all complete as per direction of E/I. |
| 6 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, levelling, ramming the foundation trenches removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. |
| 7 | Granular Sub-Base with Coarse Graded Material (Table:-400-1) :-Construction of granular sub- base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. (For Grading-II Material) |
| 8 | Providing coarse clean sand in filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150 mm thick with all lifts and leads including cost of all materials ,labours,royalty and taxes all complete as per building specification and direction of E/I |
| 9 | Chequered terrazo tiles 22 mm thick with graded marble chips of size up to 6 mm in floors, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing and polishing complete, on 20 mm thick bed of cement mortar 1:4 (1 cement :4 coarse sand) : Light shade pigment using white cement |
| 10 | Providing and laying in position cement concrete in kerbs,steps and the like at or near ground levelm excluding the cost of shuttering and finishing 1:1.5:3 ( 1 cement :1.5 coarse sand ( Zone -III) : 3 graded stone aggregrate 20 mm nominal size |
| 11 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) |
| 12 | Reinforced cement concrete work in beams, suspended floors, foors having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five lvevel, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (Zone-III) : 3 graded stone aggregate 20mm nominal size). |
| 13 | Centering and Shuttering including strutting, propping etc and removal of from for Foundation , footing , bases of columns etc for mass concrete. |
| 14 | Providing TMT reinforcement of 8mm dia rods as per approved design and drawing including carriage of M.S. rods of (Straight or in coils) to work site, cutting, bending and binding with annealed wire with cost of wire removal of rust placing the rods in position all complete as per building specification and direction of E/I. |
| 15 | Providing TMT reinforcement of 10 mm dia rods as per approved design and drawing including carriage of M.S. rods of (Straight or in coils) to work site, cutting, bending and binding with annealed wire with cost of wire removal of rust placing the rods in position all complete as per building specification and direction of E/I. |
| 16 | Providing and fixing 150 mm dia and overall length 950 mm cement concrete Bollard made with cement concrete og M30 grade by vibro compaction method and steel using 4-tor 8 mm vertically with 4 mm stirrups @ 150 c/c spacing,smooth finishes as per approved design and sample ,fixed on ground with pcc m15 300 X300X 250 mm deep including cutting of existing p.c.c floor with all complete |
| 17 | Bench with backrest wooden/ Treated Bamboo/ Bamboo composite planks fitted in cast iron frame.Painted/Polished with protection laquer coat |
| 18 | Finishing wall with premium acrylic smooth paint with silicone additives \\" snowcryl-XT\\" of M/S Snowcem india ltd or equivalent of required shade .New work ( Two or more coats applied @1.43 ltr/10sqm over and including base coat of water proofing cement paint snowcem plus or equivalent applied @2.20 kg/10 sqm |
| 19 | Supplying, fitting & fixing M.S. Grill made of 20x6mm flat as per approved design and drawing aproperly fabricated with joints continuous fitted, welded and finished smooth, hoisting as per building specification and direction of E/I. |
| 20 | Rabbit dustbin 60 L |
| 21 | (i) Sand (Lead Upto 49 km) |
| 22 | (ii) Local sand (Lead 16 KM) |
| 23 | (iii) Stone Chips (Lead 20 KM) |
| 24 | (iv) Earth (Lead 1 KM) |
| 25 | Good & Service Tax (GST) |
| 26 | Labour Cess Please Enable Macros to View BoQ information |