|
| 1 | NON SOR Item no.1 - Overhauling of gear mechanism of the rope Drum hoist of Intake - |
| 2 | (i) Servicing of electric motor with Varsishing. |
| 3 | (ii) Changing of Oil Seals |
| 4 | (iii) Replacement of bearing of gear mechanism including worm reducer pinion transmission box, etc. |
| 5 | (iv) Overhauling & Servicing of Gear mechanism including worm reducer, pinion and transmission box greasing of shaft etc. including labour & machinery works at dam site. |
| 6 | (v) Cardium compound for Rope (Usha Make) |
| 7 | (vi) Servo Grease |
| 8 | (vii) Gear oil servo - 320 |
| 9 | (viii) Cutting & welding works |
| 10 | NON SOR Item no.2 - For Intake gate (Size- 5.73x7.30) M |
| 11 | (i) Dismantling of old rubber seal, supply and installation of new rubber seal including labour charge (Bottom rubber seal flat-6mmX100mmX16mm thick. (Top and side rubber seal – 50 mm bulb – 115mm Width) |
| 12 | (ii) Supply and installation of nut bolts with washers for rubber seals |
| 13 | (iii) Replacement of rollers bearing. |
| 14 | (iv) Over hauling of guide rollers. |
| 15 | (v) Installation of new thirstier brake assembly – 02 No. |
| 16 | (vi) Pulley 9” dia – 02 Nos |
| 17 | (vii) Pulley shaft 50mm dia – 450 mm long |
| 18 | (viii) Pedestal – 02 No., size according to shaft |
| 19 | (ix) Spare A.C. Motor of 7.5 KW/10 H.P. |
| 20 | (x) Seven core -16 sqm Cable of 30 Meter length, copper wire. |
| 21 | (xi) Providing and fixing of four core-04 sqm cable of 30 meter length, copper wire. |
| 22 | (xii) Brake coil solenoid coil I No. |
| 23 | (xiii) Guide Roller bearing 10x2=20 Nos |
| 24 | (xiv) Guide Roller Servicing |
| 25 | (xv) Repair and servicing of two no. filling valve. |
| 26 | (xvi) Alignment of Guide shoe. Please Enable Macros to View BoQ information |