| 1 | Supply, laying & testing cable XLPE insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty)with stranded aluminium conductor,11000 volts grade, of size 3 core 95 sq mm complete all as specified and as directed. |
| 2 | Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 25 sq mm 4.0 core complete all as specified and as directed. |
| 3 | Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 35 sq mm 3.5 core complete all as specified and as directed. |
| 4 | Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 70 sq mm 3.5 core complete all as specified and as directed. |
| 5 | Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 95 sq mm 3.5 core complete all as specified and as directed. |
| 6 | Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 120 sq mm 3.5 core complete all as specified and as directed. |
| 7 | Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 150 sq mm 3.5 core complete all as specified and as directed. |
| 8 | Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 185 sq mm 3.5 core complete all as specified and as directed. |
| 9 | Material and Labours for shifting of Existing transformer 200 KVA from Main Power House Miran Sahib to 162 INF BDE Genrator Room with disconnecting the transformer indoor /out door from HT / LT side at site all the connected cables and earthing strips carefully for re-use and placing in position including installation testing and commissoning as per site requirement and re-connect the same alongwith its accessories and made functional Included 2.8 Mtr x 2.8 Mtre x 1.2 Mtr PCC Foundation complete all as specified and as directed. |
| 10 | Design, Supply, Erection, Testing and Commissioning of 11 KV, 630A, STC 21KA for 3sec, SF6 insulated, Manual, Outdoor, Non-extensible RMU , type tested in line with latest IEC standards. The RMU shall be suitable for operations at a height up to 1000 meters above sea level and at 40 degree ambient temperature without any derating. The switchgear and busbar shall all be contained in a stainless steel enclosure filled with SF6 at 0.3 bar (300 hPa) relative pressure. The RMU tank shall provide full insulation, making the switchgear insensitive to the environment with degrees of protection of IP67 . The switchgear operating mechanism shall have an IP2X protection and cable chamber shall have IP3X. Accidental overpressure due to an internal arc is limited by the opening of the safety valve, at the bottom of the metal enclosure, away from the operator. An operator situated in front, lateral (A-FLR 21kA – 1sec, downwards exhaust for tank and 0.2sec for cable compartment and 0.2sec. for breaker) of the RMU switchboard during an internal fault will not be exposed to the effects of arcing. Internal Arc Type Test Report for IAC AFL R21 kA for 1 sec for both tank & cable box should have been for minimum 3 way / 3 Function RMU, min. 40 nos. of dead short circuit operation at full load. Plug in type of extensibility must be provided and coupling busbar should not be exposed to air to avoid oxidation of busbars. Extension of cubicle should only require 450mm to handle and the gap between the coupled RMU’s must be within 10mm. All operations shall be from front of the RMU, including access to cable bushings. Cable bushings along the sides or the rear of the RMU are not acceptable.further manufacturer should ensure that their engineer should be at customer site for the supervision of commissioning of RMU. |
| 11 | 11kV, 630A, 3way (1nos. VCB as incomer with metering and 1nos. VCB as Outgoing without metering +1nos. LBS as Outgoing without metering) RMU Each of the above Ring Main Unit shall comprise of the followings: A. Load Break Switch (LBS) - 01 Nos each comprising of the following: 1) 11 KV, 630A, STC 21KA for 3sec. Manual Load break switch; with built in line side manual earth switch. Earthing should be completed within 2 operations only (i.e 1. Main switch - OFF, 2. Earth switch - ON). LBS shall have 3 positions, open or disconnected, closed and earthed, and will be constructed in such a way that interlocking prevents unauthorized operations. For earth switch, manual opening and closing will be driven by a fast-acting /snap action mechanism, independent of operator action. LBS and earth switch shall have a min of 1000 (M1) mechanical operations , and 5 nos closing operations at rated SC current. LBS should have 100 electrical operations at rated current - 01 Nos |
| 12 | 2) Position indicator through clear front mimic in line with IEC 62271-103 - 01 Nos 3) Live cable indicator with indications (Voltage Presence Indicator) at the front and three inlets provision to check the synchronization of phases. VPI should be of same make as that of RMU - 01 Nos 4) Cable box with termination bushing for 1RUN 3Cx up to 300 Sq mm. XLPE cable - 01 Nos 5)Fault passage indicator (FPI) with in-built Overcurrent, Short Circuit and earth fault indication FPI should have external indication. FPI should be of same make as that of RMU. - 01 Nos 6)Cable Boots suitable for actual cable size - 01 Nos 7)Auxilary switch : LBS - 2 NO +2 NC, Earth switch - (1 NO + 1 NC) - 01 Nos 8)Mechanical operation counter - 01 Nos B. Vacuum circuit breaker (VCB) - 02 Nos each comprising of the following:1) 11 KV, 630A, STC 21KA for 3sec. |
| 13 | Manual VCB with spring assisted mechanism and series trip coil; with built in manual line side three position disconnector cum earth switch. Earthing should be completed within 2 operations only (i.e 1. Main switch - OFF, 2. Earth switch - ON). Vaccuum interrupter should be of same make as that of RMU. The circuit breakers shall have 2 positions: open or disconnected and closed. A separate and independent 3 position earthing switch and disconnector shall be fitted to open and earth the cables in such way that interlocks prevent all unauthorized operations. An independent mechanism shall be fitted for the 3 positions earthing switch and disconnector. Circit breaker shall have a min of 2000 mechanical and 2000 electrical operations at rated current and 50 nos. of operations at rated short circuit current. Disconnector and earthswitch shall have a min of 1000 (M1) mechanical operations. The earthing switch shall be fitted with its own operating mechanism and manual closing shall be driven by a fast-acting mechanism, independent of operator action. - 01 Nos 2) Position indicator through clear front mimic in line with IEC 62271-103 - 01 Nos |
| 14 | 3) Self powered relay with O/C , E/F protection. Relay should have a front USB port for laptop interface , LCD display ,10 event records, 5 fault records with time stamp, min 2 setting group and keypad for setting parameters for the relay. Relay should be of same make as that of RMU - 01 Nos 4)Suitable CT ratio **/1 A, Class 1 / 5P10 , 2.5VA for protection of 100KVA to 630KVA transformer.5) Live cable indicator with indications (Voltage Presence Indicator) at the front and three inlets provision to check the synchronization of phases.VPI should be of same make as that of RMU - 01 Nos 6)Cable box with termination bushing for 1RUN 3Cx300 Sq mm, XLPE cable. 7) Cable Boots suitable for actual cable size - 01 Nos 8) Mechanical operation counter - 01 Nos 9) Emergency trip push button - 01 Nos |
| 15 | Supply, install, testing & commissioning in replacement of LT Panel board , Outdoor type, floor mounted, CRCA, made of sheet steel ,factory made suitable for 415 volt, 3 Ph 4 wire, 50 HZ, AC supply system of size not less than 1800 mm x 1500mm x 500 mm,open on both back and front side having hinges and locking arrangements having busbars chamber with Aluminium bus bars with vertically arranged of 950 Amps rating duly insulated by insulation of RYB colour mounted on porcelain insulators .The panels shall be made out of 3.15 mm thick CRCA Sheet , powder coated based on MS channel for arrangement of foundation nuts , bolts and washers The Panel should be protected with IP 54 in accordance with IEC 60529. The gasket material shall be polyurethane,while the material shall be internally embedded. the Panel should be including with internal wiring with multistranded copper conductor cable of suitable size including lugs and cable gland to incoming and outgoing cable etc and supported on MS angle of size not less than 250 mm long, LED indicating lamps, current transformers, terminal block for cables and including making of suitable size foundations as per manufacturer recommendations and taking down old unserviceable panel /fidder pillars alongwith all accessories all as directed at site and to incorporate the following:- Please Enable Macros to View BoQ information |
| 16 | Supply, install, testing & commissioning in replacement of LT Panel board , Outdoor type, floor mounted, CRCA, made of sheet steel ,factory made suitable for 415 volt, 3 Ph 4 wire, 50 HZ, AC supply system of size not less than 1800 mm x 1500mm x 500 mm,open on both back and front side having hinges and locking arrangements having busbars chamber with Aluminium bus bars with vertically arranged of 950 Amps rating duly insulated by insulation of RYB colour mounted on porcelain insulators .The panels shall be made out of 3.15 mm thick CRCA Sheet , powder coated based on MS channel for arrangement of foundation nuts , bolts and washers The Panel should be protected with IP 54 in accordance with IEC 60529. The gasket material shall be polyurethane,while the material shall be internally embedded. the Panel should be including with internal wiring with multistranded copper conductor cable of suitable size including lugs and cable gland to incoming and outgoing cable etc and supported on MS angle of size not less than 250 mm long, LED indicating lamps, current transformers, terminal block for cables and including making of suitable size foundations as per manufacturer recommendations and taking down old unserviceable panel /fidder pillars alongwith all accessories all as directed at site and to incorporate the following:- Please Enable Macros to View BoQ information |