| 1 | Schedule 'A' |
| 2 | M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following : Semi under ground sump of capacity 75000 Gallon 2 nos at High Lift Pump House complete all as specified and as directed. |
| 3 | Semi under ground sump of capacity 50000 Gallon 4 nos at High Lift Pump House complete all as specified and as directed. |
| 4 | Semi under ground sump of capacity 50000 Gallon 3 nos Near Capt Qtr (High Lift Pump House), 01 no KLP Pump House & 01 no at 183 MH complete all as specified and as directed. |
| 5 | Semi under ground sump of capacity 25000 Gallon at High Lift pump house-01, KLP pump house-03 complete all as specified and as directed. |
| 6 | Semi under ground sump open type of capacity 50000 Gallon at Low Lift Pump house. complete all as specified and as directed. |
| 7 | Semi under ground sump open type of capacity 10000 Gallon at Low Lift Pump house. |
| 8 | OHT 50000 Gallon capacity at inf Bn. complete all as specified and as directed. |
| 9 | OHT 25000 Gallon capacity at inf Bn. complete all as specified and as directed. |
| 10 | 5000 gallon capacity RCC Semiunderground sump at R&R complete all as specified and as directed. |
| 11 | Semi under ground sump open type of capacity 100000 ltr 2 nos at 183 MH, 01 nos at 302 ASC. complete all as specified and as directed. |
| 12 | M&L for cleaning of inner surfaces of channel upto appx 20 mtr infront of starting point including removing of mud, stone, gravels and removing silt, sludge, moss, algae, dirt etc to the channel the water to the channel including floor of water intake sump and . complete all as specified and directed upto the entire satisfaction of Engineer-in-charge. complete all as specified and as directed. |
| 13 | NOTE : (Applicable for Sl iterm No 1.10 To 11(i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc.(ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump.(iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department.(iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users.(v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge(vi) Cleaning of tank as per requirement. |
| 14 | M&L for cleaning/cutting of bush/shurbs/trimming of brances of trees around the sump/pumphouse/ valvepits complete all as specified and directed ( Each month) |
| 15 | M&L for plain cement concrete 1:4:8 type D2 using 40 mm graded crushed stone aggregate as in foundation, concrete base, etc complete all as specified and directed. |
| 16 | M&L for demolition cement mortar/cement lime mortar complete all as specified and directed. |
| 17 | S&F in repair STEQUA PACK PRO Bleaching Stick Applicator complete with all conection/accessories complete all as specified and directed |
| 18 | S&F in repair STEQUA PACK PRO Bleaching Stick all as specified and directed |
| 19 | Taking out old filter media of different grades/sizes of pressure filters one by one in layer and laying out manually including segregating useful materials etc complete all as specified and directed |
| 20 | Cleaning & washing of old serviceable filter media of different grades (taken out under item No 1.00 here-in-before) and repacking the retrieved/cleaned media in different layers complete all as specified and directed |
| 21 | M&L for new filter media/ferrimanex and repacking in different layers, sand/carbon of different size/ mesh complete all as specified and directed. Please Enable Macros to View BoQ information |