Name of Work:- Shifting of 11 KV line and S/S from the premises of Govt UGHS Chhatabar under Gopalpur Section
Sl. No.
Item Description
1
9mtr Long 300Kg PSC Pole (3nos for SP + 3nos for CP+ 1No for Tapping Pole + 2nos S/S + 5nos for LT Line)
2
Cost of other materials for 3ph 11KV Sigle Pole pin Point
3
Cost of other materials for 3ph 11KV Single Pole Cut Point with dbl Disc arrange
4
Cost of other materials for 3ph 11KV Tapping Pole
5
55mm2 AAAC
6
Cost of Other Materials for 11/0.4KV 63KVA S/S DP
7
LT Distribution Box with MCCB, Aluminium Busbar of single Bay with kit kat fuse for 63 KVA S/S
8
1.1 KV 4C 95 sqmm XLPE Cable (Armoured)
9
Cost of Other Materials for 3ph LT Line on 95mm2 AB Cable
10
Dismantalling cost of 3Ph 11KV line
11
Dismantalling cost of S/S DP
12
Erection Cost of 63KVA Transformer
13
Concreting of Stay(0.2Cu.mtr(Per Stay)
14
PCC ratio 1:3:6(M-10 Grade) For DSS Area (3.5X2.5X0.1)= 0.875 Cu. mtr.
15
installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe .
16
ACB/LTDB Plinth
17
Boundrywall fencing with MS gate for 63 KVA Pole mounted S/S
18
Concreting of Pole (0.375Cu.mtr(PerPole) )
19
Cupping of Pole (0.1125 Cu mtr(Per Pole) Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.