| 1 | Earth work in excavation of foundation in hard soil or Gravelly soil within 50 m initial lead & 1.50 m initial lift including levelling & dressing the bed & lifting the excavated materials within initial lead as per direction of Er. in Charge clear from work site with laying in layers of 0.30 m in depth , breaking the clod to maximum 5 to 7 cm in size & rough dressing the bed including cost of all labour etc. all complete . |
| 2 | Filling sand in foundation & plinth well watered & rammed including cost , conveyance to site , royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete |
| 3 | C.C. ( 1 :3:6) ) using 40 mm size hgcb metal free from weathered skin & all foreign materials including cost , conveyance to site , watering and curing,royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete |
| 4 | CC work in M- 20 Grade of concrete with 20 mm & down graded size CBHG chips including hoisting & laying & cost, conveyance to site , royalty , Cess DMF & EMF and |
| 5 | Fly ash brick masonry in cement mortar (1:6) including watering and curing etc. complete including cost conveyance, royalities, cess DMF & EMF and additinol royalty & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per direction of the Engineer in charge in super structure. |
| 6 | In Superstructure |
| 7 | In Superstructure |
| 8 | 12 mm thick CP (1;6) after racking out the joints including watering & curing etc. complete with cost , conveyance, royalty,cess DMF & EMF and additinol royalty etc all taxes of all materials and cost of all labour etc. all complete . |
| 9 | Painting two coats with any approved paint over a coat of priming with rubbing & cleaning the surface including cost , conveyance , etc. all taxes of all materials & cost of all labour complete |
| 10 | Supplying , fitting & fixing of M.S. angle framed & square bar grilled and Door & Windows with Grills of approved design & size provided with horns or W.I. Clamps including cost , conveyance etc. all taxes of all materials & cost of all labour complete |
| 11 | Painting two coats of synthetic enamel paint on steel work to give an even shade including sand papering and making the surface smooth in all floors at all heights including cost, conveyance,taxes of all materials, labour,cess T& P scaffolding required for the work and complete. |
| 12 | Supplying all labour , T & P , etc. for preparation of Display Board including writing charges & provision of photto graphs Pre, during & post etc. including cost of all materials & cost of all labour complete . Please Enable Macros to View BoQ information |