Name of Work:- Construction of paths between tentage sites and STP at Baltal including fencing of STP and stacking old.
Sl. No.
Item Description
1
Engagement of labour for dismantling of existing SASB fencing with angles and barbed wires and stacking it at SASB store as per direction of Engineer-in-charge.
2
Engagement of labour for erection with repairs including fixing of poles and tightening with binding wires and alike of barbed wire fencing in 7 horizontal rows and poles at 2.4m apart and 0.60m deep at ground from existing material including carriage of material to site from store.
3
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth All kinds of soil
4
Providing and laying in position cement concrete of specified grade including curing excluding cost of centring and shuttering all works up to plinth level.1:4:8(1 cement :4 coarse sand : 8 graded stone aggregate 40 mm nominal size) nallah stone
5
Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete, on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) . Dark shade using ordinary cement.
6
Carriage of material by MT to site from source at 70 Km. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.