| 1 | Supply of Sub-Station Structure (CT-4,CT-5,DD-1 beam,LA,CT, Isolator and LandE,H-pole,CT/PT Chamber. |
| 2 | Supply of 33kv CandR panel with SAS. |
| 3 | Supplyof 33KV Current transformer. |
| 4 | Supply of 33KV combined CT/PT unit with 0.2 accuracy class. |
| 5 | Supply of Sf-6 breaker. |
| 6 | Supply of OFC cable /Communication cable. |
| 7 | Supply of 33kV MK. |
| 8 | Supply of 33kV Isolator. |
| 9 | Supply of LandE. |
| 10 | Supply of 33kV Surge Arrester. |
| 11 | Supply of ST H/W fitting bolted type for single trantaulla. |
| 12 | Supply of SS H/W Fitting bolted type for single trantaulla. |
| 13 | Supply of c-wedge connector for tarantulla. |
| 14 | Supply of Earth wire 7/3.15. |
| 15 | Supply of 33kV Polymer string insulator 90KN. |
| 16 | Supply of conductor tarantulla. |
| 17 | Supply of 16Cx2.5sqmm Control Cable. |
| 18 | Supply of 10Cx2.5sqmm control cable |
| 19 | Supply of Termination material ferrules,thimble etc. |
| 20 | Supply of Earthing bore with material. |
| 21 | Supply of Ms flat (75X12MM). |
| 22 | Supply of of SAS With Kiosk. |
| 23 | Supply of 2 ton Industrial AC. |
| 24 | Supply of petty materials . |
| 25 | Supply of Special energy meter with 0.2 accuracy class. |
| 26 | Erection of Substation structure (CT-4,CT-5,DD-1 beam,LA,CT, Isolator and LandE,H-pole,CT/PT Chamber). |
| 27 | Erection of Isolator and LandE. |
| 28 | Erection of 33kV CandR panel. |
| 29 | Erection of 33kV MK |
| 30 | Erection of 33Kv VCB. |
| 31 | Erection of 33kV CT. |
| 32 | Erection of 33kV PT |
| 33 | Erection of 33kV LA. |
| 34 | Laying of Control cable. |
| 35 | Laying of earth mat. |
| 36 | Stringing and sagging of bus-bar. |
| 37 | Jumpering |
| 38 | Watch and ward of material. |
| 39 | Hiring charges of welding set with operator. |
| 40 | Hiring charges of Gas cutter with operator. |
| 41 | Erection of 33kV combined CT/PT unit with special energy meter. |
| 42 | Chief electrical Inspectorate inspection fee (Challan Fee). |
| 43 | Petty Items. |
| 44 | Hiring charges for testing of bay equipment with all tools kit and MandP |
| 45 | Civil Foundation for CT-4 Structure. |
| 46 | Civil Foundation for CT-5 Structure. |
| 47 | Civil Foundation for LA Structure. |
| 48 | Civil Foundation for CT Structure. |
| 49 | Civil Foundation for Isolator/LandE Structure. |
| 50 | Civil Foundation for Cable Supporting Structure. |
| 51 | Civil Foundation for CT/PT Chamber. |
| 52 | Construction of RCC ODCT D-type. |
| 53 | Construction of RCC ODCT E-type. |
| 54 | Site Surfacing with PCC, Supply and spreading of gravels. |
| 55 | Providing 1 no. Shift Attendant / 1 no. Assistant Lineman in each shift (total no. of shift for maintaining the roaster shall be 4 no.) and Providing 1 no. Security Guard in each shift for Comprehensive Operation and Maintenance of 33/11KV Substation at STP Behrampur. Comprehensive Maintenance shall include the maintenance of the daily log book, regular cleanliness of the panels, and substation building. Attending the Planned and unplanned shutdowns, regulating the power supply to ensure utilization of the power to the optimum. Any spare required shall be in scope of the agency. Attending the breakdowns, coordination with Power utilities, ensuring minimum power outage of the incomer. Maintaining the minimum spares to ensure that breakdown can be limited to maximum 4 hours shall be the responsibility of the agency, any outage because of the failure of the power equipment at 33/11 KV substation beyond 4 hours shall likely to attract the penalty. Safety and security of the substation will be the responsibility of the agency. |
| 56 | SITC of meter panel with CT, PT (as per DHBVN specification) Please Enable Macros to View BoQ information |