| 1 | Construction of Embankment with approved Material Obtained from Borrow Pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 As per MORD Specification & Sr. No. 301.5, 3.4 complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty but GST will be paid extra as applicable) |
| 2 | Providing, laying and spreading Material on a prepared sub grade, added OPC Cement @ 2% by weight to the spread material, maunually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub base. As per MORD Specification complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty But GST will be paid extra as applicable) |
| 3 | Providing, laying and spreading Material on a prepared sub Base, added OPC cement @ 4% by weight to the spread Material, manually mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. As per MORD Specification complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty But GST will be paid extra as applicable) |
| 4 | Tack CoatProviding and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom, as per MORD Sr. No. 5.2(ii) and Technical Specification Clause 503 Including cost of Bitumen (Including Labour Cess but GST will be paid extra as applicable) |
| 5 | 20mm. Thick open-graded premix carpet20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per MORD Sr.No. 5.9 Case I(I) and Technical Specification & Sr. 508. Case - I By Manual Means (I) Bitumen (S-90) Including cost of Bitumen (Including Labour Cess but GST will be paid extra as applicable) |
| 6 | Seal CoatSeal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per MORD Sr.No. 5.12 By Manual Case-III-Type c(I) and Technical Specification & Sr. 510 A. By Manual Means Bitumen (S-90) Including cost of Bitumen (Including Labour Cess but GST will be paid extra as applicable) |
| 7 | Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2. As per MORD Specification & Sr. No. 301.1, 3.14 complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty but GST will be paid extra as applicable) |
| 8 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. As per MORD Specification & Sr. No. 302(ii), 3.5 complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) |
| 9 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203, PCC Grade M-10 (ii) Nominal mix 1:3:6. As per MORD Specification & Sr. No. 800 & 1200, 11.4(i) complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty but GST will be paid extra as applicable) |
| 10 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203, Brick masonery in 1:4 cement mortar As per MORD Specification & Sr. No. 600 & 1200, 11.5(ii) complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) |
| 11 | Providing & Laying 900 mm Dia RCC Hume Pipe NP-3. Including collars /spigot and socketed type joint, confirming to BIS specification as per IS 458:2003. As per PWD Specification & S.I.No. 60(c) complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) |
| 12 | Supply and laying of Compacted 40mm gauge brick ballast arround and below hume pipe. As per PWD Specification and SI.No. 2(a) complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) |
| 13 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204, As per MORD Specification & Sr. No. 600, 12.2 complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) |
| 14 | Maintenance of constructed road for next five year after completion of work shall be paid. as per GO No 17/2024/lk0-113/23-1-2024-23-1099-113/2023 yksd fuekZ.k foHkkx vuqHkkx&1 fnuakd 16-01-2024 ,oa dk;kZy; izeq[k vfHk;Urk ;krk;kr oxZ yks0fu0fo0 y[kuÅ dk i=kad&3689lh&vks0ih0vkj0,e0lh0@ewy&23&24 fnuakd 17-02-2024- Payment shall be done as per satisfaction of engineer in chage regarding maintenance work carried out by contractor (Including Labour Cess but GST will paid extra as applicable). 1st year Maintenance cost total construction of cost Item No. 1 to 8.05 Rs. 10278011.93 @ Zero percent & for 2nd year @ 0.75% |
| 15 | 3rd Year cost of BOQ @ 1.50 % |
| 16 | 4rth Year cost of BOQ @ 2.25 % |
| 17 | 5th Year cost of BOQ @ 3.00 % Please Enable Macros to View BoQ information |