| 1 | Descalling of Condensor of 150 TR Screw (Bluestar MAKE) |
| 2 | Chemical circulation upto standard Condensor |
| 3 | Both end cover dismantling |
| 4 | Roding copper tube manually |
| 5 | Flushing of copper tube with fresh water |
| 6 | Box- up of Machine |
| 7 | Taking Set value of reading after descaling work. |
| 8 | Note:- For this work any enlisted contractor for air conditioning is eligible to participate in the bid, subject to conditon that agency will got work executed only from authorised Engineer of Original Equipment Manufacturer (i.e. BLUESTAR) alongwoith original spare parts. |
| 9 | Descalling of Condensor of 150 TR Screw (DAIKIN MAKE) |
| 10 | Chemical circulation upto standard Condensor |
| 11 | Both end cover dismantling |
| 12 | Roding copper tube manually |
| 13 | Flushing of copper tube with fresh water |
| 14 | Box- up of Machine |
| 15 | Taking Set value of reading after descaling work. |
| 16 | Descalling of Chiller of 150 TR Screw (Evaporator) (DAIKIN MAKE) |
| 17 | Chemical circulation upto standard Chiller (Evaporator) |
| 18 | Both end cover dismantling |
| 19 | Roding copper tube manually |
| 20 | Flushing of copper tube with fresh water |
| 21 | Box- up of Machine |
| 22 | Taking Set value of reading after descaling work. |
| 23 | Note:- For this work any enlisted contractor for air conditioning is eligible to participate in the bid, subject to condition that agency will got work executed only from authorised Engineer of Original Equipment Manufacturer (i.e. DAIKIN) alongwith original spare parts. |
| 24 | Supply of Screw Compressor oil and recover the compressor and charge the compressor oil through oil pump complete in all respect with approved make required for the chilling machine. The rate is quoted should include the site visit, detection of fault and replacment with testing. |
| 25 | Topping of Refrigenrant (R-134A) in chilling machine of capacity 300 TR Capacity complete in all respect. The rate is quoted should include the site visit, detection of fault and replacment with testing. |
| 26 | Repair and Over hauling 10-15 HP chiller/condensor Pump with motor including complete work of pump changing of bearing, tyre coupling, carriage and fixing of motor with pump on site with all nut and bolt as required at site to the entire satisfaction of EIC including credit of old materail. The rate is quoted should include the site visit, detection of fault and replacment with testing. |
| 27 | Providing and fixing of contactor blocks condensor of chiller pumps. The rate is quoted should include the site visit, detection of fault and replacment with testing. |
| 28 | MNX 25 |
| 29 | MNX 32 |
| 30 | MNX 50 |
| 31 | MNX 70 |
| 32 | Providing and fixing of hot water generator controller in AC plant chiller unit water line outlet/ inlet Temperature controller suitable make complete in all resepct. (Make Rapidcool). The rate is quoted should include the site visit, detection of fault and replacment with testing. |
| 33 | Providing and fixing of Hot water generator Emerson Heater 20-25 KW complete in all respect. The rate is quoted should include the site visit, detection of fault and replacment with testing. Make Daspass, BCH, Theta, Rapidcool. |
| 34 | Providing and fixing of Digital Amp meter/ volt amp. complete in all respect make L&T, BCH, Scheinder. The rate is quoted should include the site visit, detection of fault and replacment with testing. |
| 35 | Supply and installation of MCB 32-63 amp terminal Blocks complete in all respect. Make L&T, Havells. The rate is quoted should include the site visit, detection of fault and replacment with testing. |
| 36 | Providing and fixing of 100-125 amp MCCB complete in all respect. Make Havells, L&T, BCH. The rate is quoted should include the site visit, detection of fault and replacment with testing. |
| 37 | Providing and fixing of various size of copper thimble complete in all respect as per site requirement fitting, clamping with entire satisfaction of EIC. |
| 38 | 25/35/40 Sqm with sleeve. |
| 39 | Providing and fixing of copper wires/ cables single core 35 mm complete in all respect as per site requirement to the entire satisfaction of EIC. Make Havells, BCH, Phenolex. |
| 40 | Providing & Fixing Indicator lamp complete in all respect. The rate is quoted should include the site visit, detection of fault and replacement with testing. |
| 41 | Repair and Mtc. of 200 TR cooling Tower with complete change of 460 Nos. PVC Fills 600x300x150 mm, 30 Nos. PVC Nonnle 75mm, 400 Sqft FRP Basin Coating, PVC Nozzle 63mm, PVC end CAP 63 mm, PVC Nipple 9x40mm, PVC Branch pipe 6KG ISI Marked 19'x63mm, PVC Hydra Pipe 6 KG ISI Marked 12'x200mm, servicing charges for dismantling and fitting complete in all respect to the entire satisfacton of EIC. |
| 42 | Disposal of old material i.e. PVC fills of cooling tower from 5th floor terrace including loading/unloading upto dumping ground at Civil Hospital Sector 45 Chandigarh complete in all respect. |
| 43 | Dressing of internal HT/LT internal/ with 1.5 control pannel wire with thimbling and PVC tie i/e cleaning of complete panel from inside with nut bolt, thimbles,tightening of bus bar, bolts, earthing wire connections and testing of pumps/motor to the entire satisfaction of EIC. Please Enable Macros to View BoQ information |