| 2 | 1. Survey, review and design of 3 nos. of Interception Diversion Structure, including receiving chamber, 2 Nos catch basin, RCC Channel construction & Arrangement of diversion of wastewater. 2. Providing, laying, jointing, testing, commissioning of Gravity Main of RCC Np3 pipe having length of 1041 m of dia 300mm and 400 mm including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials, fittings all and Sufficient Numbers of manhole. 3. Survey, Design and build 4 Nos Pumping station of 0.45,0.35,0.30 & 0.25 MLD and all appurtenant structures and allied works.4. Providing, laying, jointing, testing, commissioning of Sewage pumping main of DI K-7 pipe having length of 3300 m of dia 100mm and 150 mm including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete. 5. Design and build sewage treatment plant of installed capacity 1.30 MLD and all appurtenant structures and allied works.6. Design and Construction of 150 m length Boundary wall & 100m Length of Road.7. Treated water pumping main of DI K-7 pipe with 100 mm diameter and 1412 m length is proposed, along with a 20 KL treated water sump and adequately sized pumps for pumping treated water to nearby agricultural land or river. The work includes excavation, refilling, road cutting/dismantling, restoration, and providing all necessary valves, specials, and fittings – complete in all respects.8. Providing, Supplying and erection of Electric Sub Station including required electric conductor with all necessary equipment’s and fittings complete in all respect |