| 1 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 2 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 3 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. |
| 4 | Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 5 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 6 | Fitting one Additional2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 7 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 8 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 9 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 10 | Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 numbers of poles. (Running km) |
| 11 | Erection of suspension clamp for 11KV ABC of any size |
| 12 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 13 | Fitting and providing one HTStay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 14 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 15 | Additional rate for excavation of Pit for A type pole in Laterite. |
| 16 | Additional rate for excavation of Pit for A type pole in Hard Laterite. |
| 17 | 11 KV AB Cable Termination instalation for 3 Core |
| 18 | Stringing of 11 kV Aerial bunched cable of size 3 x 120+ 1 x 95 sqmm with bare/insulated Messenger through existing poles |
| 19 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 20 | Erecting one 100kVA Transformer to existing DP and giving connections, including loading fromTMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer. |
| 21 | Transporting Transformers by hired vehicle to a distance upto 5km and carrying upto 2 numbers of 63/100/160/250kVATransformers / Ring Main Units excluding loading& unloading charges. |
| 22 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and Distribution box to LT OH line. |
| 23 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and Neutral, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 24 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral, for one km LT three phase 4 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials(except poles) from stacking place. |
| 25 | Providing/Inserting 2 line spacer on the existing LT OH line. |
| 26 | Providing/Inserting 3 line spacer on the existing LT OH line. |
| 27 | Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizondal brasing and grills with MS rods 8 mm Dia @ 10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of transportation |
| 28 | Cleaning and levelling of transformer yard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc. |
| 29 | Fitting 5 channel cross arms, AB switch, DO fuse, LA(Ord), HT & LTconnections upto OH lines, etc. on existing DP structure, Fixing distribution box/provision for one set (3No.) of LT fuses, , drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing & mounting of Transformer on poles. |
| 30 | Fitting one Additional V cross arm in existing single pole including conveyance of materials. |
| 31 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. |
| 32 | Dismantling one Transformer (upto and including 160kVA) from existing structure and loading to any vehicle directly, including disconnecting HT/LT/Earth connections. |
| 33 | Dismantling (without damage) one set (3 No) 11 kV DO Fuse including connection. |
| 34 | Dismantling transformer station with transformer erected in DP structure by dismantling HT Double Pole Structure using PSC pole after disconnecting stay wires, 10 channel cross arms,AB switch, DO fuse, LA, GI earthing leads, DTR meter with box with metering equipments, CTs, Distribution Box, statutory display boards etc. but excluding the rate of dismantling transformer, earthing, stay sets & fencing. |
| 35 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 36 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works. |
| 37 | Fitting and providing one HT Fly stay for 11kV pole using A type pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 38 | Providing one Driven Earth using GI earth pipe of size38.1mm dia, 2.5m length at minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil. |
| 39 | Dismantling one damaged 11kV A type pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 40 | Dismantling (without damage) one Channel cross arm from existing DP structure and bringing back to section store. |
| 41 | Dismantling (without damage) one V cross arm/Channel cross arm from existing Pole and bringing back to section store. |
| 42 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 43 | Dismantling (without damage) one AB switch from existing structure and bringing back to section store. |
| 44 | Dismantling (without damage) one HT stay including digging pit in all classes of soil and backfilling, and bringing back to section store. |
| 45 | Dismantling one ordinary street light/CFL/LED fitting from existing pole cleaning, rewiring, repairing/replacing the holder, changing bulbs and refitting the same in position and giving connection. |
| 46 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 47 | Dismantling (without damage) one LT PSC/RCC Strut pole including removal of clamps and stacking. |
| 48 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 49 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 50 | Dismantling (without damage) LT stay including digging pit in all classes of soil and backfilling. |
| 51 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 52 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 53 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 54 | Transporting Transformers by hired vehicle to a distance beyond 5km and carrying upto 2 numbers of 63/100/160/250kVATransformers / Ring Main Units (Running km). |
| 55 | Fitting and erecting one HT PSC pole in position without V cross arm and F clamp including digging and back filling pit,drawing earth leads ( While erecting 9m PSC pole for LT works while working in LT line or HT (ABC ) |
| 56 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. |
| 57 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). |
| 58 | Fiting One no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 kV AB Cable |
| 59 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 60 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 61 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 62 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 63 | Erection of suspension clamp for LT ABC of any size |
| 64 | Providing End Caps |
| 65 | Erection of Stainless Steel Strap and Buckles |
| 66 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 67 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 68 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 69 | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. |
| 70 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 71 | Distribution box suitable for 4 Three phase connections |
| 72 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 73 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 74 | Installation of Insulation piercing connector for main to service line main :25-95 sqmm, Tap : 25-95 sqmm |
| 75 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. |
| 76 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 77 | Dismantling one section fuse from structure and bringing back to section store. |
| 78 | Excavation of cable trench of appropriate size ( normally1.2m deep and 0.35m /0.5m wide for single/double run) in all classes of soil including breaking clods, watering, ramming and sectioning of soil bank etc. and back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding laying of cable). |
| 79 | Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc. whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling. |
| 80 | Doing one cable end termination on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally after making fencing,caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 81 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm)0.45x0.45x1.5m, Plastering (1:3) 12mm0.45x0.45mx5sides. Please Enable Macros to View BoQ information |