| 1 | CONSTRUCTION OF 11KV LINE-WPB (GI) pole 160x152 (11mtr. Long,30.4KG/Mtr) |
| 2 | 11KV V cross Arm (10.2KG each) |
| 3 | Top bracket 10x50x6mm GI channel(2KG per channel) |
| 4 | 55 SQ.MM. AAAC XLPE insulated/covered conductor |
| 5 | PG clamp for 55sqmm AAA Conductor |
| 6 | 11KV pin Insulator polymer |
| 7 | HW fittings(B&S) 70KN,3Bolt |
| 8 | Disc insulator (B&S) 70KN,Polymer |
| 9 | Non metallic ties 11KV for covered conductor |
| 10 | IPC connector 55/100sqmm for insulated conductor |
| 11 | Spike GI using 50x6mm flat welding etc. |
| 12 | Back clamp GI for 11KV V cross arm |
| 13 | Coil earthing for Earthing of Support |
| 14 | Top Channel 100X50X6mm, 9.56 KG/Mtr., each channel length 2.3 mtr., 2 no's channel required =( 2x9.56x2.3) |
| 15 | Double pole belting channel 75x40x4.8mm, 7.14 KG/Mtr., each channel length 2.3 mtr., 2 no's channel required =( 2x9.56x2.3) |
| 16 | Danger plate (LT) |
| 17 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no's = (1x0.59x0.510) |
| 18 | HT stay set complete |
| 19 | HT Stay Insulator Type-C (2Nos) |
| 20 | H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 21 | 7/10 SWG stay wire 15KG/Stay |
| 22 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 23 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 24 | GI Nut,bolt,washer of different size |
| 25 | Black paint |
| 26 | yellow colour paint for background |
| 27 | Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx 800 mm) using 20mm BHG metal with all labour and material as per TPNODL Drawing & Standard. |
| 28 | Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr |
| 29 | Couping ratio 1:1.5:3 with dimension (500X500X450)= 0.1125 Cu mtr |
| 30 | CONSTRUCTION OF LT AB CABLE LINE-9 mtr long 300KG PSC pole |
| 31 | Supply & erection of Pole clamp for eye hook for XLPE AB cable |
| 32 | Supply & erection of Eye Hook for XLPE AB cable |
| 33 | Supply & erection of conductor dead end clamp suitable for bare messanger XLPE AB cable |
| 34 | 1.1KV 3X50+1X35 SQMM LT XLPE AB cable |
| 35 | 4way service distribution box with kit kat fuse and aluminium bus bar |
| 36 | Supply & erection of insulated piercing connector.Type-A-main to 16 to 95sqmm and tap 16 to 95sqmm |
| 37 | Supply & erection of insulated piercing connector.Type-B-main to 16 to 95sqmm and tap 2.5 to 10 sqmm |
| 38 | Spike GI using 50x6mm flat welding etc. |
| 39 | Supply & erection of coil earthing for Earthing of Support |
| 40 | Supply & erection of danger plate |
| 41 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 42 | Supply & erection of GI barbed wire anticlimbing device 3 Kg. Per support |
| 43 | Supply & erection of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 44 | Supply & erection of GI Nut,bolt,washer of different size |
| 45 | Black paint |
| 46 | yellow colour paint for background |
| 47 | Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.45Cu.mtr |
| 48 | Couping ratio 1:1.5:3 with dimension (500X500X450)= 0.1125 Cu mtr |
| 49 | 25KVA, 11/0.4KV (AL) DP MOUNTED TRANSFORMER- Supply & erection of WPB (GI) pole 160x152 (11mtr. Long,30.4KG/Mtr) |
| 50 | Top Channel GI 100X50X6mm, 9.56 KG/Mtr., each channel length 2.3 mtr., 6 no's channel required =( 6x9.56x2.3) (3Pair) |
| 51 | Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.250 mtr. length, 6 no's required = (6x2.36x0.250) |
| 52 | HT MU Mounting Channel GI 75X40X4.8mm, 7.14KG/Mtr |
| 53 | Cantilever suport angle GI 50 x 50 x 6mm |
| 54 | 50 x 6mm GI Flat for earthing 2.36Kg/Mtr |
| 55 | 25 KVA,11/0.4KV (Al)Transformer BIS Energy Level-II |
| 56 | LT Distribution box with MCCB, aluminium bus bar for single bay with kit kat fuse for 25KVA S/S |
| 57 | 55mm2 All Alloy Aluminum Conductor (AAAC) - PVC Insulated for Jumpering |
| 58 | 4C x 35 sqmm LT XLPE cable (Armoured) |
| 59 | AB Switch 11KV 3 pole, 200A, 50HZ |
| 60 | HG Fuse 11KV, 3 pole, 200Amp |
| 61 | PG clamp for 55sqmm AAA Conductor |
| 62 | Disc insulator (B&S) 70KN,Polymer |
| 63 | H W fittings(B&S) 70KN,3Bolted |
| 64 | Lighting Arrester (12KV,10KA) station class |
| 65 | 11KV pin insulator polymer |
| 66 | HT stay set complete |
| 67 | HT stay clamp (1.9KG/Pair) |
| 68 | HT Stay Insulator Type-C (2Nos) |
| 69 | 7/10 SWG stay wire grade-2 (15KG/Stay) |
| 70 | 40mm Nominal bore GI Pipe (Medium gage) earthing device with 3 mtrs. Long |
| 71 | GI Nuts & Bolts of Assorted size (25Kg/DP) |
| 72 | GI barbed wire anticlimbing device, 3KG/Pole |
| 73 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 74 | 11KV danger plate |
| 75 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 76 | Name plate |
| 77 | yellow colour paint for background |
| 78 | Black colour paint for numbering |
| 79 | Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr |
| 80 | Couping ratio 1:1.5:3 with dimension (500X500X450)= 0.1125 Cu mtr |
| 81 | Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPNODL Drawing & Standard. |
| 82 | Construction of earthing chamber including installation of earthing pipe making earthing chamber including excavation including sand,salt,charcoal etc. |
| 83 | Laying of 4C x 95 sqmm LT XLPE cable (Armoured) |
| 84 | Supply and Erection of GI Fencing with Gate |
| 85 | Total Labour cost for dismantling + Transportation charges |
| 86 | Display board write with submission of photocopies of the work Please Enable Macros to View BoQ information |