| 1 | Reconductoring with LT ABC |
| 2 | Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 3 | Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls. |
| 4 | Stringing of 1.1 kV Aerial bunched cable of size 1 x 25 + 1 x 25 sqmm with bare/insulated Messenger through existing poles |
| 5 | Erection of suspension clamp suitable for LT AB cable with SS strap assembly |
| 6 | Erection of Anchor clamp / dead end clamp suitable for LT AB cable with SS strap assembly@ 2 nos at each location |
| 7 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 8 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 9 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 10 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 11 | Fitting of one No. pole top service connection box of standard size (up to 4 way) using ss strap/B&N of suitable size in to the PSC/A poles at the standard height excluding giving connections |
| 12 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 13 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 14 | Erection of suspension clamp for LT ABC of any size |
| 15 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 16 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |
| 17 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 18 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 19 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 20 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 21 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 22 | Providing WP support with PSC pole incl. digging & back filling pit. |
| 23 | Straightening one Slanted LT pole after unbinding the line and rebinding the line after work. |
| 24 | Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint. |
| 25 | Providing Stay for LT poles incl. digging & back filling pit. |
| 26 | Renewal of existing damaged/broken old LT stay with existing stay rod. |
| 27 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. Please Enable Macros to View BoQ information |