| 1 | Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. |
| 2 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 3 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 4 | Erection of suspension clamp for 11KV ABC of any size |
| 5 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. |
| 6 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. |
| 7 | Fiting One no MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable |
| 8 | Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm |
| 9 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 10 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 11 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
| 12 | Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 13 | Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 14 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 15 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 16 | Re-Tensioning one span 11kV line incl. replacing insulators, tightening stay, cutting tree branches and conveyance. |
| 17 | Insertion of one HT A type pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc. |
| 18 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. |
| 19 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 20 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 21 | Stringing of 11 kV Aerial bunched cable of size 3 x 150 + 1 x 120 sqmm with bare/insulated Messenger through existing poles |
| 22 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 23 | Fitting one set AB switch and giving connection |
| 24 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. |
| 25 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 26 | Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 27 | Fitting one additional F top bracket |
| 28 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 29 | Fiting One no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 kV AB Cable |
| 30 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 31 | Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking. |
| 32 | Dismantling one V cross arm/Channel cross arm from existing Pole, and bringing back to section store. |
| 33 | Transporting one HT PSC pole by Head load (limited to 0.3km). |
| 34 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 35 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 36 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 37 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). Please Enable Macros to View BoQ information |